13.07.2015 Views

FD01-24 - QinetiQ North America

FD01-24 - QinetiQ North America

FD01-24 - QinetiQ North America

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONTRACT NO.N00178-04-D-4096DELIVERY ORDER NO.<strong>FD01</strong>AMENDMENT/MODIFICATION NO.<strong>24</strong>PAGE22 of 55FINALshall also perform detailed analyses of planned new data acquisition systems to assess theimpact of such on the requirements for processing and analyzing the resulting data at NSWCCDsignature processing facilities. The introduction of new signature acquisition systems employingadvanced technologies and new sonar sensor arrays, hydrophone arrays, and telemetry systems,as well as new measurement approaches and new processing/analysis techniques, shall also bestudied. The contractor shall use the results of these studies to provide recommendations forupgrading and/or modernizing current facilities and equipment. The results of each study effortshall be documented in a final report. Based on design analyses and studies, the contractor shallbe required to develop new radiated noise measurement systems; advanced signal processingsystems; Information Technology (IT) systems; and mass data storage, retrieval and analysissystems; structureborne noise and sonar self-noise measurement, acquisition, and processingsystems in support of Signature Directorate Programs.TASK AREA 8 ACINT Analysis, Assessment, Quality Assurance, Signal Processing Supportand StudiesThe contractor shall assist the ACINT program in Science and Technology (S&T) analysis byreviewing ACINT reports, publications, and other products for accuracy and consistency andassist in the development and implementation of new products and production procedures. Thecontractor shall review individual acoustic intelligence reports for possible trends and newdevelopments and produce intelligence assessments and studies of the results of these analyses.The contractor shall assist the ACINT program in Sound Pressure Level (SPL) analysis andconduct in-depth studies using specialized SPL processing and analysis equipment, report resultsand identify hardware, software, or architecture changes that would improve efficiency andthroughput. The contractor shall reconstruct the target track relative to the sensor in order tocalculate sensor-to-target range and aspect as a function of time, and compute sensor-to-targetpropagation loss using an appropriate propagation loss model. The contractor shall assist theACINT program in the area of signal processing by participating in the design, development andrapid prototyping of specialized acoustic analysis signal processing tools and related

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!