You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
16Skill Drill 16-26Performing a Preconnected Flat Load (2 of 2)3. Make an 8-inch loop atthe end of the hose bed.Make a second pulling loopthat is about twice the sizeof the first loop.4. Finish loading the hose,attach the nozzle, <strong>and</strong> placeit on top of the hose bed.