The Commissioner/ Secretary (Forests) introduced Shri Abdul Gani ...

The Commissioner/ Secretary (Forests) introduced Shri Abdul Gani ... The Commissioner/ Secretary (Forests) introduced Shri Abdul Gani ...

13.07.2015 Views

The Commissioner/ Secretary (Forests) introduced Shri Abdul Gani Vakil, Ex-MLC, as the newMember (Non-Offical) of the Forest Advisory Committee. The item-wise agenda of the meeting presented byShri H.S. Salathia, IFS, Member Secretary, FAC, was discussed and deliberated upon by the participatingmembers and the following decisions were taken:-AgendaItemsNo.ProposalForestDivisionIndentingAgencyDecision of the Forest Advisory Committee61.01Proposal to allow use of27.20 Hectare of forestland for construction of93 M.W New GanderbalHEP.61.02 Revised proposal toallow use of 2.825Hectare of forest landfor construction of roadfrom Admarg to Mohu.61.03 Proposal to allow use of3.10 Hectare of forestland for construction ofInderwan to SagamWuder road.61.04 Revised proposal toallow use of 13.79Hectare of forest landfor construction ofUkhral-Bhangara road61.05 Proposal to allow use of16.268 Hectare of forestland (underground) forconstruction of RailwayTunnel (T-74 R) Km.125.267 to Km. 133.928.61.06 Proposal to allow use of3.95 Hectare of forestland for widening/upgradation of roadfrom Charhi Sharief toYusmarg includingPakherpora link.Sindh JK SPDC The proposal was deferred with following observations:-i) The Forest Department will give the break-up of all the1846 number of trees/ poles/ saplings involved undereach component of the project indicating the numberto be actually cut and that to be effected under thehydrological impact due to construction of the tunnel.ii) The Indenting Agency shall submit the muck disposalplan addressing all issues concerning safe muckdisposal in accordance with the parameters already setby the committee headed by the PCCF in Chenani –Nashri Tunnel case of NHAI .Ramban PMGSY The Proposal was approved on the terms and conditionsas laid down in the proposalAnantnag PMGSY The Proposal was approved on the terms and conditionsas laid down in the proposalRamban PMGSY The revised proposal was deferred again as the numberof trees / poles involved were still on the higher side.The Indenting Agency will further explore the possibility ofreducing the width from 9 metre to 7 metre so that thenumber of trees/ poles involved is further reduced to theminimum possible.RambanNorthernRailwaysThe proposal was approved on the terms and conditionsas laid down in the proposal with additional condition asunder:-“ The Indenting Agency shall also take necessary action tomeet the parameters for safe disposal of muck as alreadyset by the committee headed by the PCCF in similaranother case of Chenani – Nashri Tunnel by NHAI.”Pir Panjal PMGSY The Proposal was approved on the terms and conditionsas laid down in the proposal1.

<strong>The</strong> <strong>Commissioner</strong>/ <strong>Secretary</strong> (<strong>Forests</strong>) <strong>introduced</strong> <strong>Shri</strong> <strong>Abdul</strong> <strong>Gani</strong> Vakil, Ex-MLC, as the newMember (Non-Offical) of the Forest Advisory Committee. <strong>The</strong> item-wise agenda of the meeting presented by<strong>Shri</strong> H.S. Salathia, IFS, Member <strong>Secretary</strong>, FAC, was discussed and deliberated upon by the participatingmembers and the following decisions were taken:-AgendaItemsNo.ProposalForestDivisionIndentingAgencyDecision of the Forest Advisory Committee61.01Proposal to allow use of27.20 Hectare of forestland for construction of93 M.W New GanderbalHEP.61.02 Revised proposal toallow use of 2.825Hectare of forest landfor construction of roadfrom Admarg to Mohu.61.03 Proposal to allow use of3.10 Hectare of forestland for construction ofInderwan to SagamWuder road.61.04 Revised proposal toallow use of 13.79Hectare of forest landfor construction ofUkhral-Bhangara road61.05 Proposal to allow use of16.268 Hectare of forestland (underground) forconstruction of RailwayTunnel (T-74 R) Km.125.267 to Km. 133.928.61.06 Proposal to allow use of3.95 Hectare of forestland for widening/upgradation of roadfrom Charhi Sharief toYusmarg includingPakherpora link.Sindh JK SPDC <strong>The</strong> proposal was deferred with following observations:-i) <strong>The</strong> Forest Department will give the break-up of all the1846 number of trees/ poles/ saplings involved undereach component of the project indicating the numberto be actually cut and that to be effected under thehydrological impact due to construction of the tunnel.ii) <strong>The</strong> Indenting Agency shall submit the muck disposalplan addressing all issues concerning safe muckdisposal in accordance with the parameters already setby the committee headed by the PCCF in Chenani –Nashri Tunnel case of NHAI .Ramban PMGSY <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposalAnantnag PMGSY <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposalRamban PMGSY <strong>The</strong> revised proposal was deferred again as the numberof trees / poles involved were still on the higher side.<strong>The</strong> Indenting Agency will further explore the possibility ofreducing the width from 9 metre to 7 metre so that thenumber of trees/ poles involved is further reduced to theminimum possible.RambanNorthernRailways<strong>The</strong> proposal was approved on the terms and conditionsas laid down in the proposal with additional condition asunder:-“ <strong>The</strong> Indenting Agency shall also take necessary action tomeet the parameters for safe disposal of muck as alreadyset by the committee headed by the PCCF in similaranother case of Chenani – Nashri Tunnel by NHAI.”Pir Panjal PMGSY <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposal1.


61.11 Proposal to allow use of0.30 Hectare of forestland for widening ofBasoli-Bani-Bhaderwahroad (KM. 89 to Km.102).Billawar GREF <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposalAgendaProposalItemsNo.61.12 Proposal to allow use of3.897 Hectare of forestland for construction ofGandoh-Sinoo-Jai roadupto village Rajpura(Km 0 to 18) by PWD(R&B) in BhaderwahForest Division.61.13 Proposal to allow use of6.30 Hectare of forestland for construction ofroad from Jai to Joura.61.14 Proposal to allow use of1.71 Hectare of forestland for laying of G.I.Pipe Line from Jai toChakrabathi andconstruction ofReservoir, FiltrationPlant andSedimentation Tank.61.15 Proposal to allow use of0.57 hectare ofadditional forest land forconstruction of Parna-Bunda road (from takeoffpoint Km 43 SKShighway) under PMGSYin Marwah ForestDivision.61.16 Proposal to allow use of0.0279 hectare of forestland for construction of3000 gallons of SlowSand Filtration Plant atCharat by PHE inUdhampur ForestDivision.ForestDivisionBhaderwahBhaderwahIndentingAgencyPWD(R&B)PWD(R&B)Decision of the Forest Advisory Committee<strong>The</strong> proposal was deferred with following observations:-(i). Large number of trees/poles were involved and thusthe proposed width should be reduced to 6 or 7 metre soas to minimize the damage.(ii) Present mode of connectivity in the area and thedistance up to the road head to be given.(iii). To explore the possibility if the Indenting Agency canprovide funds to the Forest Department to construct theforest road passing through the forest land with minimumwidth and minimum damage to the ecology.<strong>The</strong> proposal was deferred with following observations:-(i). Large number of trees/poles were involved and thusthe proposed width should be reduced to 6 or 7 metre soas to minimize the damage.(ii) Present mode of connectivity in the area and thedistance up to the road head to be given.(iii). To explore the possibility if the Indenting Agency canprovide funds to the Forest Department to construct theforest road passing through the forest land with minimumwidth and minimum damage to the ecology.Bhaderwah PHE <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposalMarwah PMGSY <strong>The</strong> proposal was deferred as the proposed width of theroad (i.e. 12 metre) was on higher side. <strong>The</strong> IndentingAgency would reduce the width of the road to 6 or 7 metreso as to minimize the damage to the ecology.Udhampur PHE <strong>The</strong> Proposal was approved on the terms and conditionsas laid down in the proposal61.17 Proposal to allow use of Nowshera PHE <strong>The</strong> Proposal was approved on the terms and conditions3.


0.0105 hectare of forestland for construction of10,000 gallons of WaterReservoir at Ganya byPHE in Nowshera ForestDivision.as laid down in the proposal<strong>The</strong> meeting ended with vote of thanks to the Chair.H. S. Salathia, IFSChief Conservator of <strong>Forests</strong> (FCA)& Nodal OfficerMember <strong>Secretary</strong>, Forest Advisory Committee4.