REQUEST FOR QUOTATION - GAIL (India)

REQUEST FOR QUOTATION - GAIL (India) REQUEST FOR QUOTATION - GAIL (India)

gailonline.com
from gailonline.com More from this publisher
13.07.2015 Views

REQUEST FOR QUOTATION (Cont.)RFQ No:GAIL/LAK/SD/82 /3200016610/C&P/06Date: 28.03.2006____________________________________________________________ADDITIONAL REQUIREMENTS:CUT:FLUTE TYPE:MAKE: TOTEM, SAP OR EQUIVALENTMATERIAL: HSSNUMBER OF FLUTE:OVERALL LENGTH:STANDARD: IS 6175-1977SUPPLEMENTARY REQUIREMENTS:TAPTHREAD LENGTH:TYPE: METRIC SERIES74 6130101003 EACH 2 ________TAP,RH THREAD,HSS,M10x1.25MMPITCHSIZE: 10 x 1.25 MM75 6130101393 EACH 2 ________TAP,RH THREAD,HSS,M14X 1.25MMSIZE: M14 X 1.25 MMRH THREAD76 6130103303 EACH 2 ________TAP,HAND,HSS,M33x3.5MMSIZE: 33 MM77 6130103603 EACH 2 ________TAP,HAND,RH THREAD,HSS,M36x4.0MMPITCHSIZE: 36 x 4.0 MMGroup : 8ADDITIONAL REQUIREMENTS:CUT:FLUTE TYPE:MAKE:MATERIAL: HSSNUMBER OF FLUTE:OVERALL LENGTH:STANDARD:SUPPLEMENTARY REQUIREMENTS:TAPTHREAD LENGTH:THREAD TYPE: NPTPage 12 of 15

REQUEST FOR QUOTATION (Cont.)RFQ No:GAIL/LAK/SD/82 /3200016610/C&P/06Date: 28.03.2006____________________________________________________________78 6130120903 EACH 4 ________TAP,HAND,HSS,NPT,1/4INx18,BS:949-1969BS949 NPT THREAD BS:949-1969SIZE: 1/4 x 18 IN------------------------------------------------------------EMD Details : NILInstruction to Bidders : PLEASE REFER ANNEXURE-I FOR BID EVALUATION CRITERIA(BEC),ANNEXURE-II FOR GENERAL CONDITIONS OF NIT, ANNEXURE-III FOR CONFIRMATION OFBIDDER, ANNEXURE-IV FOR PRICE SCHEDULE.Note:1) Bids should be submitted separately in two parts i.e. PART A: Technical Bid, PART B : Priced Bid. Thetwo envelopes shall be enclosed in a large sealed envelope mentioning on the top our Enquiry No. & Date& due Date of Opening.2) Your offer should reach office of the Manager(C&P) GAIL, LPG Recovery Plant, Lakwa-785688 latestby 25/04/2006 at 12.00 Hrs.3) Lakwa is a remote place, hence you are requested to forward your offer well in advance preferably byM/s. Overnite Courier as this is the only courier who visits our site regularly.Note:i.) % of Taxes, other charges extra should be mentionedclearly.ii.) Please enclose technical literature along with your quotation.iii.) Sample of items can be seen in this office.iv) Our Central Excise ECC No. AAAC G1209J X M 0 0 2 Sibsagar range, Divn.-Jorhat, Collectorate,Shillong.27.v) Our CST No. - SIB/CST/1081 , LST No.SIB/LST-1149Price Basis : FOR-LAKWADelivery/Completion Schedule : 10/06/2006Page 13 of 15

<strong>REQUEST</strong> <strong>FOR</strong> <strong>QUOTATION</strong> (Cont.)RFQ No:<strong>GAIL</strong>/LAK/SD/82 /3200016610/C&P/06Date: 28.03.2006____________________________________________________________78 6130120903 EACH 4 ________TAP,HAND,HSS,NPT,1/4INx18,BS:949-1969BS949 NPT THREAD BS:949-1969SIZE: 1/4 x 18 IN------------------------------------------------------------EMD Details : NILInstruction to Bidders : PLEASE REFER ANNEXURE-I <strong>FOR</strong> BID EVALUATION CRITERIA(BEC),ANNEXURE-II <strong>FOR</strong> GENERAL CONDITIONS OF NIT, ANNEXURE-III <strong>FOR</strong> CONFIRMATION OFBIDDER, ANNEXURE-IV <strong>FOR</strong> PRICE SCHEDULE.Note:1) Bids should be submitted separately in two parts i.e. PART A: Technical Bid, PART B : Priced Bid. Thetwo envelopes shall be enclosed in a large sealed envelope mentioning on the top our Enquiry No. & Date& due Date of Opening.2) Your offer should reach office of the Manager(C&P) <strong>GAIL</strong>, LPG Recovery Plant, Lakwa-785688 latestby 25/04/2006 at 12.00 Hrs.3) Lakwa is a remote place, hence you are requested to forward your offer well in advance preferably byM/s. Overnite Courier as this is the only courier who visits our site regularly.Note:i.) % of Taxes, other charges extra should be mentionedclearly.ii.) Please enclose technical literature along with your quotation.iii.) Sample of items can be seen in this office.iv) Our Central Excise ECC No. AAAC G1209J X M 0 0 2 Sibsagar range, Divn.-Jorhat, Collectorate,Shillong.27.v) Our CST No. - SIB/CST/1081 , LST No.SIB/LST-1149Price Basis : <strong>FOR</strong>-LAKWADelivery/Completion Schedule : 10/06/2006Page 13 of 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!