13.07.2015 Views

Internal Prosthetic Manual - BioHorizons

Internal Prosthetic Manual - BioHorizons

Internal Prosthetic Manual - BioHorizons

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CEMENT-RETAINED SINGLE / MULTIPLE UNITLab 13 - Fabricate crownPrepare coping/framework to receive the opaque layer according toroutine lab procedures. Apply veneer material and finish. Polish metalmargins as routine. Return to clinician for patient delivery.Send to Clinician• Final crown• Working modelClinical 14 - Remove temporarySanitize the final prosthesis (per standard clinical procedure). Removethe provisional prosthesis. Make sure the abutment and margins are freeof all temporary cement.Clinical 15 - Final crown deliverySeat the crown and/or bridge on the modified abutment. Confirm fitand contour. Check and modify occlusion if necessary.Place a small amount of cement of choice around the inside margin of thecrown or bridge. Soft-access cement may be used for future retrievability.Seat the crown or bridge. Remove all excess cement from sulcus area.Take an x-ray for final prosthesis delivery records. The patient shouldreceive oral hygiene instructions prior to release.shop online at www.biohorizons.com46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!