13.07.2015 Views

Internal Prosthetic Manual - BioHorizons

Internal Prosthetic Manual - BioHorizons

Internal Prosthetic Manual - BioHorizons

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CEMENT-RETAINED SINGLE / MULTIPLE UNITLab 10 - Sprue, invest and castSprue, invest and cast the coping/framework according to routinelaboratory procedures. A noble or high noble alloy is required.Lab 11 - Divest, fit and finishDivest, fit and finish the cast coping/framework following conventionallab techniques.Seat the finished coping/framework onto the working model and adjustas necessary.The coping/framework may now be returned to the dentist for metaltry-in.Send to Clinician• Metal coping• Working modelClinical 12 - Metal coping try-inSanitize coping (per standard clinical procedure). Remove provisionalprosthesis from the prepared abutment. Make sure the abutment andmargins are free of all temporary cement. Re-torque the Abutment Screwto 30 Ncm using a calibrated Torque Wrench and the .050” (1.25mm)Hex Driver.Try in the metal coping/framework. Verify fit and margins. Adjust asnecessary. Return to lab. Reseat provisional prosthesis.Send to Lab• Metal coping• Shade• Working modelshop online at www.biohorizons.com45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!