13.07.2015 Views

VISN 11 - Office of Construction and Facilities Management

VISN 11 - Office of Construction and Facilities Management

VISN 11 - Office of Construction and Facilities Management

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>VISN</strong> <strong>11</strong> - Third 3 Project TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Acute Psychiatric Mental Health PolytraumaNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAnn Arbor, MI (Detroit, MI) $498 $398 $259 $136 $412 $321 $209 $109 $475 $374 $243 $128Battle Creek, MI (Lansing, MI) $442 $353 $230 $121 $366 $285 $185 $97 $421 $332 $216 $<strong>11</strong>3Danville, IL (Champaign, IL) $455 $363 $236 $124 $376 $293 $190 $100 $433 $342 $222 $<strong>11</strong>7Detroit, MI $498 $398 $259 $136 $412 $321 $209 $109 $475 $374 $243 $128Fort Wayne, IN $428 $342 $222 $<strong>11</strong>7 $354 $276 $179 $94 $408 $322 $209 $<strong>11</strong>0Indianapolis, IN $440 $351 $228 $120 $364 $283 $184 $97 $419 $330 $215 $<strong>11</strong>3Marion, IN (Fort Wayne, IN) $428 $342 $222 $<strong>11</strong>7 $354 $276 $179 $94 $408 $322 $209 $<strong>11</strong>0Saginaw, MI $443 $354 $230 $121 $366 $285 $185 $97 $422 $333 $216 $<strong>11</strong>4$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 3


<strong>VISN</strong> <strong>11</strong>- Fourth 3 Project TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Spinal Cord Injury (SCI) Nursing Home Care Unit (NHCU) Blind RehabilitationNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAnn Arbor, MI (Detroit, MI) $442 $361 $235 $123 $397 $316 $205 $108 $431 $329 $214 $<strong>11</strong>2Battle Creek, MI (Lansing, MI) $393 $321 $208 $109 $353 $281 $182 $96 $383 $292 $190 $100Danville, IL (Champaign, IL) $404 $330 $214 $<strong>11</strong>2 $363 $288 $187 $98 $393 $300 $195 $102Detroit, MI $442 $361 $235 $123 $397 $316 $205 $108 $431 $329 $214 $<strong>11</strong>2Fort Wayne, IN $380 $310 $202 $106 $342 $272 $177 $93 $371 $283 $184 $97Indianapolis, IN $391 $319 $207 $109 $351 $279 $181 $95 $381 $290 $189 $99Marion, IN (Fort Wayne, IN) $380 $310 $202 $106 $342 $272 $177 $93 $371 $283 $184 $97Saginaw, MI $394 $321 $209 $<strong>11</strong>0 $353 $281 $183 $96 $383 $293 $190 $100$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 4


<strong>VISN</strong> <strong>11</strong> - Fifth 3 Project TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Research- Heavy; Wet labs & Animals Surgery <strong>and</strong> PACU Research - Normal; Mix Heavy & <strong>Office</strong>sNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAnn Arbor, MI (Detroit, MI) $752 $639 $416 $218 $667 $546 $355 $186 $543 $461 $299 $157Battle Creek, MI (Lansing, MI) $668 $568 $369 $194 $593 $485 $315 $166 $482 $409 $266 $140Danville, IL (Champaign, IL) $687 $584 $379 $199 $609 $499 $324 $170 $496 $421 $273 $143Detroit, MI $752 $639 $416 $218 $667 $546 $355 $186 $543 $461 $299 $157Fort Wayne, IN $647 $550 $357 $188 $574 $470 $305 $160 $467 $396 $257 $135Indianapolis, IN $664 $565 $367 $193 $589 $483 $314 $165 $480 $407 $264 $139Marion, IN (Fort Wayne, IN) $647 $550 $357 $188 $574 $470 $305 $160 $467 $396 $257 $135Saginaw, MI $669 $569 $370 $194 $594 $486 $316 $166 $483 $410 $266 $140$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 5


<strong>VISN</strong> <strong>11</strong> - Sixth 3 Project TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Administration Space; Housed in Main Hospital Parking Garage Surface Parking - Priced Per Parking SpaceNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation New SpaceAnn Arbor, MI (Detroit, MI) $306 $239 $156 $82 $71 $31 $20 $<strong>11</strong> $3,982 $0 $0 $0Battle Creek, MI (Lansing, MI) $272 $213 $138 $73 $63 $28 $18 $10 $3,536 $0 $0 $0Danville, IL (Champaign, IL) $279 $219 $142 $75 $65 $29 $19 $10 $3,636 $0 $0 $0Detroit, MI $306 $239 $156 $82 $71 $31 $20 $<strong>11</strong> $3,982 $0 $0 $0Fort Wayne, IN $263 $206 $134 $70 $61 $27 $18 $9 $3,425 $0 $0 $0Indianapolis, IN $270 $2<strong>11</strong> $137 $72 $62 $28 $18 $9 $3,517 $0 $0 $0Marion, IN (Fort Wayne, IN) $263 $206 $134 $70 $61 $27 $18 $9 $3,425 $0 $0 $0Saginaw, MI $272 $213 $138 $73 $63 $28 $18 $10 $3,542 $0 $0 $0$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 6


<strong>VISN</strong> <strong>11</strong> - Seventh 3 Project TyVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014LocationNewWarehouses -w/ <strong>Office</strong>sTotalRenovationMediumRenovationLightRenovationAnn Arbor, MI (Detroit, MI) $239 $173 $<strong>11</strong>2 $59 $0 $0 $0 $0 $0 $0 $0 $0Battle Creek, MI (Lansing, MI) $212 $153 $100 $52 $0 $0 $0 $0 $0 $0 $0 $0Danville, IL (Champaign, IL) $218 $158 $102 $54 $0 $0 $0 $0 $0 $0 $0 $0Detroit, MI $239 $173 $<strong>11</strong>2 $59 $0 $0 $0 $0 $0 $0 $0 $0Fort Wayne, IN $206 $148 $96 $51 $0 $0 $0 $0 $0 $0 $0 $0Indianapolis, IN $2<strong>11</strong> $152 $99 $52 $0 $0 $0 $0 $0 $0 $0 $0Marion, IN (Fort Wayne, IN) $206 $148 $96 $51 $0 $0 $0 $0 $0 $0 $0 $0Saginaw, MI $213 $153 $100 $52 $0 $0 $0 $0 $0 $0 $0 $0$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 7


<strong>VISN</strong> <strong>11</strong> - Eighth 3 Proj TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Demolition Cost for an Existing Building Leased Space - Need To Provide Specific Build-Out Operating <strong>and</strong> Mothball CostsDemolitionCost OnlyHaul &DumpYearly RatePer SquareFoot"Full"OperationalCostsAdjacentMothballCostsSt<strong>and</strong> AloneMothballCostsAnn Arbor, MI (Detroit, MI) $12.88 $14.62 $0.00 $0.00 $45.82 $0.00 $0.00 $0.00 $28.37 $16.55 $7.62 $0.00Battle Creek, MI (Lansing, MI) $<strong>11</strong>.44 $12.98 $0.00 $0.00 $40.68 $0.00 $0.00 $0.00 $25.19 $14.70 $6.76 $0.00Danville, IL (Champaign, IL) $<strong>11</strong>.76 $13.35 $0.00 $0.00 $41.83 $0.00 $0.00 $0.00 $25.90 $15.<strong>11</strong> $6.95 $0.00Detroit, MI $12.88 $14.62 $0.00 $0.00 $45.82 $0.00 $0.00 $0.00 $28.37 $16.55 $7.62 $0.00Fort Wayne, IN $<strong>11</strong>.08 $12.57 $0.00 $0.00 $39.40 $0.00 $0.00 $0.00 $24.40 $14.24 $6.55 $0.00Indianapolis, IN $<strong>11</strong>.37 $12.91 $0.00 $0.00 $40.46 $0.00 $0.00 $0.00 $25.05 $14.62 $6.73 $0.00Marion, IN (Fort Wayne, IN) $<strong>11</strong>.08 $12.57 $0.00 $0.00 $39.40 $0.00 $0.00 $0.00 $24.40 $14.24 $6.55 $0.00Saginaw, MI $<strong>11</strong>.46 $13.00 $0.00 $0.00 $40.76 $0.00 $0.00 $0.00 $25.23 $14.73 $6.77 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions."Demolition Costs Only" is based on razing the entire structure <strong>and</strong> disposing <strong>of</strong> the waste material on-site. Haul & Dump is not included. Hazardous material abatement is not included."Haul & Dump" includes cost for a 20 mile haul <strong>and</strong> the appropriate dump fees for construction materials. Disposal <strong>of</strong> hazardous materials is not included.Additional funds should be included for known adverse conditions, length <strong>of</strong> haul, inflated dump fees, closed dump <strong>and</strong> refuge facilitiesTo calculate savings for mothballed structures, subtract which type <strong>of</strong> "Mothballing" is being utilized (Adjacent or St<strong>and</strong> Alone) from the "Full" Operating Costs.The "Full" Operating Costs include: Electric, water, gas, sewage, major systems maintenance, building shell maintenance, janitorial, <strong>and</strong> securityBased on the type <strong>of</strong> "Mothballing" to be used, percentages have been utilized to account for maintaining the integrity <strong>of</strong> the building envelope,maintaining non-freezing conditions for sprinklers & utilities, maintenance, security, <strong>and</strong> ensuring JHCO complianceLeasing yearly rates only includes: l<strong>and</strong>, site improvements, building shell, taxes, utilities, insurance, shell <strong>and</strong> outside maintenance -Similar to a sole occupancy <strong>of</strong> a "Spec" building - HOUSEKEEPING COSTS ARE NOT INCLUDED - Assumes normal operating days <strong>and</strong> hours - NOT 24/7Lease cost does not include initial build out (tenant improvement) <strong>of</strong> space for the specific function.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 8


<strong>VISN</strong> <strong>11</strong> -Ninth 3 Project TypesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Ro<strong>of</strong> Replacement Modernize Restrooms for UFAS/ADA Fire AlarmsTotalTotalEDPM Built Up Shingles Metal RenovationNew RenovationAnn Arbor, MI (Detroit, MI) $12.32 $<strong>11</strong>.75 $7.55 $9.92 $307.48 $0.00 $0.00 $0.00 $10.59 $12.45 $0.00 $0.00Battle Creek, MI (Lansing, MI) $10.94 $10.44 $6.70 $8.81 $273.03 $0.00 $0.00 $0.00 $9.40 $<strong>11</strong>.05 $0.00 $0.00Danville, IL (Champaign, IL) $<strong>11</strong>.24 $10.73 $6.89 $9.06 $280.71 $0.00 $0.00 $0.00 $9.66 $<strong>11</strong>.36 $0.00 $0.00Detroit, MI $12.32 $<strong>11</strong>.75 $7.55 $9.92 $307.48 $0.00 $0.00 $0.00 $10.59 $12.45 $0.00 $0.00Fort Wayne, IN $10.59 $10.<strong>11</strong> $6.49 $8.53 $264.42 $0.00 $0.00 $0.00 $9.10 $10.70 $0.00 $0.00Indianapolis, IN $10.88 $10.38 $6.67 $8.76 $271.53 $0.00 $0.00 $0.00 $9.35 $10.99 $0.00 $0.00Marion, IN (Fort Wayne, IN) $10.59 $10.<strong>11</strong> $6.49 $8.53 $264.42 $0.00 $0.00 $0.00 $9.10 $10.70 $0.00 $0.00Saginaw, MI $10.96 $10.46 $6.72 $8.82 $273.50 $0.00 $0.00 $0.00 $9.42 $<strong>11</strong>.07 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Ro<strong>of</strong> replacement costs do not include asbestos removal or disposal. Verify presence <strong>of</strong> asbestos in existing ro<strong>of</strong> <strong>and</strong> include additional funds as necessary.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 9


<strong>VISN</strong> <strong>11</strong> -Escalation RatesVAMC COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>11</strong>: Veterans In PartnershipCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> <strong>Management</strong>, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014YEAR2014 2015 2016 2017 2018ESCALATION RATE 3.00% 4.00% 5.00% 5.00% 5.00%NOTES:When using the above Escalation Rates over a number <strong>of</strong> years. These will need to be compounded to show true escalation.For additional assistance, contact estimating@va.govPage 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!