13.07.2015 Views

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.1.2 Construction of LandscapeTo depict a model projecting the harmony between nature and developmentem<strong>ph</strong>asizing the prime concern for environmental preservation and balanced growth,landscape plantings will be used so as to dramatically improve the aesthetics of theinstallation and visitors’ first impressions of the CFZ.3.1.3 Upgrading of Systems and Management to World-Class StandardsTo provide the public, CDC clients and investors the wel<strong>com</strong>e atmos<strong>ph</strong>ere andconvenience while considering the maintenance of an acceptable level of security,control and safety.3.2 Project ProcessTo implement and <strong>com</strong>plete the design development and construction of the proposed project ata Guaranteed Maximum Price as per scope of work described herein, and as approved by CDC,the project owner.The Designer-Builder shall provide for its account all materials, labor, equipment, tools,instruments and appliances needed or necessary to <strong>com</strong>plete the “Work”:• Development of Theme Concept and Preliminary Scheme, Design of Site Developmentand its Aesthetic Features.• Detailed Architectural and Engineering Design of the approved Site DevelopmentPlan and Theme Gateway Works.• Construction of the proposed Site Development and Theme Gateway Works and itsrequired Infrastructures and Appurtenances.The required design development and construction works shall be <strong>com</strong>pleted within a projecttimeframe of One-Hundred Fifty (150) calendar days.3.3 Implementing PhaseThe project shall be organized into implementing <strong>ph</strong>ases as per location and scope of discipline,namely as:Phase 1 Design and Construction of Approach /Queuing1.1 Traffic Calming1.1.1 Provisions for restricting traffic flow approaching the ID check area during increasedforce protection conditions.1.1.2 Road alignment (circle, serpentine)1.1.3 Drop-in or retractable bollards (to cause serpentine traffic flow1.1.4 Swing gates1.1.5 Speed humps or speed table1.1.6 Pavement texture1.2 Landscaping Theme Sculpture1.3 Roadway and Geometric Roadway Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!