13.07.2015 Views

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2 To provide the Designer-Builder with the background information regarding the proposedproject which should be handled in the shortest possible time, at the lowest possible cost andat an acceptable quality and performance;2.3 To outline the Terms of Contract to be negotiated between CDC and Designer-Builder; and2.4 To outline the “Work” of the Designer-Builder that has to be performed under the terms of itscontract with CDC.3.0 ROLE OF THE DESIGNER-BUILDER3.1. The Designer-Builder, for which this <strong>TO</strong>R applies, shall provide technical services in thepreparation of the detailed engineering design for the proposed SCTEx-CFZ Entry/Exit Gateswithin the viable cost range and established design level. The design services shall be carriedout in accordance with the CDC-Engineering, Construction and Maintenance Department(ECMD) approved Design Guidelines, Criteria and Standards.In this regard, the Designer-Builder or the key personnel to be assigned must have professionalexperience <strong>com</strong>patible with the undertaking.3.2. The Designer-Builder shall also implement the construction activities to <strong>com</strong>plete the project inaccordance with the approved construction drawings and specifications and the scope of workas specified in the contract. The Designer-Builder shall carry out the construction activitiesunder the supervision of assigned CDC–ECMD qualified technical staff.3.3. The Designer-Builder shall <strong>com</strong>plete the services or “Work” within 150 calendar daysscheduled as follows:3.3.1 Detailed Design Phase including review by CDC-ECMD technical staff should be<strong>com</strong>pleted within 60 calendar days.3.3.2 Construction Phase should be <strong>com</strong>pleted within 90 calendar days.4.0 EXTENT OF THE PROJECTThe project consists of providing design-build services to two (2) Entry/Exit Gates; one (1) located atSCTEx-CFZ linkage area (Panday Pira Access Road) and one (1) located at the SCTEx-CFZ linkage area(Spur Underpass Access Road). Each of the Entry/Exit Gates shall include Traffic Calming,Landscaping, Roadway, Geometric Roadway Design, Site Lighting, Commercial Truck Holding Area,Visitor Parking/Commercial Vehicles Inspection and Holding Area, Gatehouse, Pull-Off AlternateInspection Area, Custom Clearance/Inspection Area, Site Drainage and other appurtenant structures.5.0 GENERAL CONDITIONSThe following are the conditions/design criteria under which the proposed project shall be designedand constructed:3.1 Project Objectives3.1.1 Construction of World-Class ECF: SCTEx-CFZ Entry/Exit GatesTo provide main entry points for all personnel, visitors and deliveries to CFZ withoutundue delays through maximized vehicular traffic flow, adequate security and safetywith positive impression and prestige to the CFZ.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!