13.07.2015 Views

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11.2 The Designer-Builder shall observe and report any adverse implication and/or effects of theconstruction on the natural environment. As necessary, the Designer-Builder will implement therequired remedial measures to minimize and avoid any damage.12.0 <strong>BID</strong> EVALUATION <strong>AND</strong> SELECTION PROCESSThe Design-Build Proposal shall be evaluated using a Two-Step Procedure:12.1 First-Step Procedure: The first step of the evaluation shall involve the review of thepreliminary conceptual designs and track record submitted by the contractor as indicated inthe bid documents using a non-discretionary “pass/fail” criteria that involve <strong>com</strong>pliance withthe following requirements:12.1.1 Adherence of preliminary design plans to the required performance specifications andparameters and degree of details;12.1.2 Concept of approach and methodology for detailed engineering, design and constructionwith em<strong>ph</strong>asis on the clarity, feasibility, innovativeness and <strong>com</strong>prehensiveness of theplan of approach, and the quality of interpretation of project problems, risks, andsuggested solutions; and12.1.3 Quality of personnel to be assigned to the project which covers suitability of key staff toperform the duties of the particular assignments and general qualifications and<strong>com</strong>petence including education and training of the key staff.12.2 Second-Step Procedure: Only those bids that passed the above criteria shall be subjected tothe second step of evaluation.The SBAC-DBS shall open the financial proposal of each “passed” bidder and shall obtain thecorrect calculated prices. The financial bids as so calculated shall be ranked, in ascending order,from lowest to highest. The bid with the lowest price shall be identified as the LowestCalculated Bid (LCB).13.0 SUBMISSION OF <strong>BID</strong>The Technical and Financial Proposals shall be submitted together in a sealed envelope marked“Technical and Financial Proposal for the Design-Build Services of SCTEx-CFZ Entry/Exit Gates” notlater than _________________ at the office of the Secretariat of the Bids and Awards Committee(BAC) for the said project, <strong>Clark</strong> Development Corporation, 3 rd floor, Building 2127, C. P. Garcia Streetcorner E. Quirino Street, CFZ, Pampanga. The sealed envelope shall be addressed to:14.0 LIST OF ABBREVIATIONSChairman, BAC<strong>Clark</strong> Development Corporation3 rd Floor, Building 2127, C. P. Garcia Streetcorner E. Quirino Street, <strong>Clark</strong> Freeport Zone,Pampanga<strong>TO</strong>R - Terms of ReferenceBAC-DBS - Bids and Awards Committee for Design-Build Services

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!