13.07.2015 Views

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

INVITATION TO APPLY FOR ELIGIBILITY AND TO BID - Clark.com.ph

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9.2 Highway Engineer – with substantial and varied experience in the fields of highway, location,surveying, hydraulics, highway design and plan preparation and capable of preparing standardformats and guidelines.9.3 Drainage Engineer/Hydrologist – with wide experience in carrying out hydrological studiesof drainage structures.9.4 Materials/Soils Engineer – with extensive laboratory and field experience related tomaterials testing and quality control, and evaluation and design of as<strong>ph</strong>alt and concretepavement.9.5 Structural Engineer – with extensive experience in building structural design and constructionand has substantial knowledge of the principles and practices in earthquake design of buildingstructures.9.6 Architect – with extensive experience in site planning, landscaping and architectural design ofbuilding structures.9.7 Cost/Quantity/Specs Engineer – with wide experience in the preparation of tenderdocuments and technical specifications, and in the preparation of detailed analysis of allapplicable unit prices.9.8 Project Engineer – should be a Civil Engineer with extensive experience in thesupervision/implementation of infrastructure projects.9.9 Electrical Engineer – with extensive experience in building electrical design and constructionand has substantial knowledge in the electrical systems design of entry controlled facilities.10.0 DATA <strong>AND</strong> LOCAL SERVICES <strong>TO</strong> BE PROVIDED BY CDC10.1 The CDC will provide the Design-Build Proponent with:10.1.1 Basic design guidelines and criteria/standards;10.1.2 Initial Schematic Plans;10.1.3 Soil Test results within CFZ;10.1.4 Plans of Panday Pira and Spur Underpass Access Roads; and10.1.5 Available maps (Detailed Plans/Maps of SCTEx within CFZ).10.2 With regards to <strong>com</strong>munication with the Designer-Builder that requires the cooperation of otheragencies, the CDC will provide liaison and will ensure the Designer-Builder’s access to allinformation required as may be allowed by law for the performance of these services.11.0 ADDITIONAL IN<strong>FOR</strong>MATION11.1 Environmental Assessment – the Designer-Builder shall perform a <strong>com</strong>prehensive evaluation ofpossible adverse environmental impact on the <strong>com</strong>munity/Freeport Zone which would beattributed to the proposed infrastructure project. The assessment must be professional,thorough and documented in sufficient detail to demonstrate conclusions presented. There mustbe full <strong>com</strong>pliance with the environmental assessment guidelines, as well as with any additionallaws, decrees or regulations which may be applicable.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!