8.1.8 UNIT PRICE ANALYSISShowing sources of data and all calculations made in determining the unit price of eachitem of work, including profit factor, overhead, contractor’s tax, etc.8.1.9 CONSULTANT’S ESTIMATEFinal Cost Estimates for each entry/exit gate utilizing the quantities and unit pricedetermined under 8.1.6 and 8.1.8 (to be submitted within sealed confidential cover).8.1.10 GEOMETRIC DESIGN OF GATEWAY <strong>AND</strong> ROAD APPROACHES8.1.10.A Layout containing information on the right-of-way, lane width median, curband gutter, shoulders, lateral and vertical clearances, transition tapers, turning lanes,parking turnout, parking lot, parking spaces, channelization islands, pavement surface,drainage, utility location, landscape and fences.8.1.10.B Traffic control signages to include regulatory, warning and guide signs,flashing signals, lane reversal, cones, pavement markings and emergency closure.8.1.10.C Roadway lighting to indicate illumination, placement and lighting supports.8.1.11 DRAWINGS SUBMITTALSubmittal shall include topogra<strong>ph</strong>ic and hydrological surveys and design drawings suchas site development, architectural, civil, structural, electrical, sanitary, and plumbingplans.8.2 The Contractor shall oblige to the submission and deliberation of the following reports:9.0 STAFF REQUIREMENT8.2.1 Inception Report – to be submitted one (1) week after the official start of the project insix (6) bounded copies and CD copy.8.2.3 Interim Progress/Status Report - to be submitted during request for progress billing.8.2.2 Draft Final Report – to be submitted on the seventh week in six (6) bounded copies andCD copy.8.2.3 Final Report – to be submitted one (1) week after the return of the draft final reportwith <strong>com</strong>ments, re<strong>com</strong>mendations and conclusions, as well as <strong>com</strong>pilation of reportspreviously submitted, in six (6) bounded copies and CDC copy.The Contractor shall provide adequate and qualified staff to perform the services described herein. Thegeneral qualifications for the key personnel are as follows:9.1 Project Manager – experienced in the direction and administration of activities pertinent tothe planning, design and construction of infrastructure projects.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!