13.07.2015 Views

ENG - pure-2-stroke-spirit.info

ENG - pure-2-stroke-spirit.info

ENG - pure-2-stroke-spirit.info

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CABLE ROUTING DIAGRAMSPEC1 Fuel pump lead2 Clamp3 Fuse holder4 Servomotor5 Front brake hose (right)6 YPVS cable 1, 2 (right cylinder)7 Clutch cableA Clamp the fuel hose and clutch cable. Position the upside ends of theclamp inside of the seat rail.B Clamp the radiator hose 3 and ignition coil lead.C Clamp the radiator hose 3 and YPVS cable (right cylinder).D Do not cut the end of the clamp.E Connect the left cylinder YPVS cables (silver cables) to the inner YPVSservomotor pulley and right cylinder YPVS cables (black cables) to theouter. The sleeved cables must be connected to the top side (open side)of the YPVS servomotor.F Align the end of the cover with that of the meter stay.G Be sure the brake hose is not twisted.2-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!