minutes of the planning committee meeting held on ... - City of Darebin

minutes of the planning committee meeting held on ... - City of Darebin minutes of the planning committee meeting held on ... - City of Darebin

darebin.vic.gov.au
from darebin.vic.gov.au More from this publisher
13.07.2015 Views

MINUTES OF THEPLANNING COMMITTEE MEETINGHELD ON25 JULY 2011RELEASED TO THE PUBLIC ON THURSDAY 28 JULY 2011

MINUTES OF THEPLANNING COMMITTEE MEETINGHELD ON25 JULY 2011RELEASED TO THE PUBLIC ON THURSDAY 28 JULY 2011


PLANNING COMMITTEE MINUTES 25 JULY 2011Table <str<strong>on</strong>g>of</str<strong>on</strong>g> C<strong>on</strong>tents1. PRESENT......................................................................................................................12. APOLOGIES .................................................................................................................13. DISCLOSURES OF CONFLICTS OF INTEREST .........................................................14. CONFIRMATION OF MINUTES OF THE PLANNING COMMITTEE.............................15. CONSIDERATION OF REPORTS.................................................................................25.1 APPLICATION FOR PLANNING PERMIT D/194/2011 .......................................................2Lot 3 and Comm<strong>on</strong> Property, 159 Heidelberg Road, Northcote ..........................................25.2 APPLICATION FOR PLANNING PERMIT D/238/2011 12 Mihil Street, Prest<strong>on</strong>...............215.3 APPLICATION FOR PLANNING PERMIT D/227/2009 28-30 Hutt<strong>on</strong> Street, Thornbury ..375.4 APPLICATION FOR PLANNING PERMIT D/791/2010 50 Arthurt<strong>on</strong> Road, Northcote.....565.5 APPLICATION FOR PLANNING PERMIT D/790/2010 210 Gillies Street, Fairfield..........746. OTHER BUSINESS.....................................................................................................896.1 List <str<strong>on</strong>g>of</str<strong>on</strong>g> Scheduled VCAT Appeals.......................................................................................896.2 Significant Applicati<strong>on</strong>s Update........................................................................................1067. CLOSE OF MEETING...............................................................................................111


PLANNING COMMITTEE MINUTES 25 JULY 2011MINUTES OF THE MEETING OF THE PLANNINGCOMMITTEE OF DAREBIN CITY COUNCIL HELD ATDAREBIN CIVIC CENTRE ON 25 JULY 20111. PRESENTCouncillorsCr. Vince F<strong>on</strong>tana (Chairpers<strong>on</strong>)Cr. Gaetano GrecoCr. Nick KatsisCr. Tim LaurenceCr. Steven Tsitas (5.35pm)THE MEETING COMMENCED AT 5.30 PMThe Mayor, Cr. Asmar was present at <str<strong>on</strong>g>the</str<strong>on</strong>g> start <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g>.Council OfficersMichael Ballock – Director <strong>City</strong> Works and DevelopmentDarren Rudd – Manager <strong>City</strong> DevelopmentCristen Sullivan – Coordinator Statutory PlanningR<strong>on</strong> Downes – Council Business CoordinatorUp<strong>on</strong> commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g>, <str<strong>on</strong>g>the</str<strong>on</strong>g> Mayor, Cr. Asmar, verbally informed <str<strong>on</strong>g>the</str<strong>on</strong>g><str<strong>on</strong>g>meeting</str<strong>on</strong>g> that a legal interventi<strong>on</strong> order had been made in relati<strong>on</strong> to <strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> matters<str<strong>on</strong>g>the</str<strong>on</strong>g> subject <str<strong>on</strong>g>of</str<strong>on</strong>g> report <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning Committee Agenda and that this obliged affectedparties to leave <str<strong>on</strong>g>the</str<strong>on</strong>g> Council Chamber.2. APOLOGIESAn apology was lodged for <str<strong>on</strong>g>the</str<strong>on</strong>g> initial absence <str<strong>on</strong>g>of</str<strong>on</strong>g> Cr. Tsitas.3. DISCLOSURES OF CONFLICTS OF INTERESTNil.4. CONFIRMATION OF MINUTES OF THE PLANNING COMMITTEECOMMITTEE DECISIONMOVED:SECONDED:Cr. N. KatsisCr. G. GrecoTHAT <str<strong>on</strong>g>the</str<strong>on</strong>g> Minutes <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning Committee <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 11 July 2011 bec<strong>on</strong>firmed as a correct record <str<strong>on</strong>g>of</str<strong>on</strong>g> business transacted.CARRIEDPage 1


PLANNING COMMITTEE MINUTES 25 JULY 20115. CONSIDERATION OF REPORTS5.1 APPLICATION FOR PLANNING PERMIT D/194/2011Lot 3 and Comm<strong>on</strong> Property, 159 Heidelberg Road, NorthcoteAUTHOR:DIRECTOR:Principal Planner – Gavin CrawfordDirector <strong>City</strong> Works and Development – Michael BallockSUMMARY:• C<strong>on</strong>struct a four (4) storey caretaker’s house (partly retrospective) with four bedroomsand 19.6 square metres private open space, reducti<strong>on</strong> in car parking from 11 <strong>on</strong> sitecar spaces to 9 <strong>on</strong> site car spaces with <strong>on</strong>e (1) car space allocated to <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’shouse.• The Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title does not indicate that <str<strong>on</strong>g>the</str<strong>on</strong>g>re is a restrictive covenant whichapplies to <str<strong>on</strong>g>the</str<strong>on</strong>g> land.• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Refusal.CONSULTATION:• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> was given by posting a sign <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land and mailing <str<strong>on</strong>g>of</str<strong>on</strong>g> noticesto affected properties.• Fifteen (15) objecti<strong>on</strong>s were received against <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong>.• No c<strong>on</strong>sultative <str<strong>on</strong>g>meeting</str<strong>on</strong>g> was <str<strong>on</strong>g>held</str<strong>on</strong>g>.• The applicati<strong>on</strong> has been referred internally to:- Council’s Solicitors,- Capital Works Branch (no objecti<strong>on</strong>); and,- Transport Branch (objecti<strong>on</strong>),and externally to:- Melbourne Water (no objecti<strong>on</strong> subject to c<strong>on</strong>diti<strong>on</strong>s).RECOMMENDATIONTHAT Planning Permit Applicati<strong>on</strong> D/194/2011 be refused and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Refusal beissued <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> following grounds:1. The proposed building's height and setbacks result in unreas<strong>on</strong>able levels <str<strong>on</strong>g>of</str<strong>on</strong>g> visualbulk and loss <str<strong>on</strong>g>of</str<strong>on</strong>g> daylight to <str<strong>on</strong>g>the</str<strong>on</strong>g> adjacent studio / caretaker’s house at 7 WestfieldStreet (west), impacting detrimentally up<strong>on</strong> its amenity.2. The proposed building will overlook <str<strong>on</strong>g>the</str<strong>on</strong>g> habitable room windows <str<strong>on</strong>g>of</str<strong>on</strong>g> its western andnor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn residential abuttals, impacting detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>ir amenity.Page 2


PLANNING COMMITTEE MINUTES 25 JULY 20113. Pedestrian access from Albert Street provides a poor design resp<strong>on</strong>se for pers<strong>on</strong>saccessing <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house c<strong>on</strong>trary to Clause 15.01-4 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme.4. The proposed building does not provide for effective pedestrian movement in oraround <str<strong>on</strong>g>the</str<strong>on</strong>g> parking area, with all car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner c<strong>on</strong>strained bywalls which will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> property and<strong>on</strong>-street car parking in <str<strong>on</strong>g>the</str<strong>on</strong>g> area, c<strong>on</strong>trary to Clause 52.06-2 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> PlanningScheme.5. The proposed caretaker’s house is not sufficiently integrated with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing selfstorage use, as it will be separated from that use, will be located partly <strong>on</strong> comm<strong>on</strong>property, provides little to no surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing use and is inc<strong>on</strong>sistent withClause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.6. The size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house undermines <str<strong>on</strong>g>the</str<strong>on</strong>g> purposes<str<strong>on</strong>g>of</str<strong>on</strong>g> industrial z<strong>on</strong>ed land and is inc<strong>on</strong>sistent with Clause 17.02, Clause 21.05-5, Clause22.07 and Clause 33.03 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.7. The design, materials and articulati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed building is inc<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g>character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area and c<strong>on</strong>trary to Clause 15.01-1 and Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme.8. The proposed reducti<strong>on</strong> in car parking will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> locality and is inc<strong>on</strong>sistent with Clause 52.06 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme,providing insufficient car parking for <str<strong>on</strong>g>the</str<strong>on</strong>g> existing self storage use and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposedcaretaker’s house.9. The proposal provides insufficient landscaping opportunities and is inc<strong>on</strong>sistent withClause 15.01-5 and Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.10. The proposal is not in accordance with Clause 63.05 and Clause 63.12 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme.REPORTINTRODUCTION AND BACKGROUNDLot 3 appears to have always maintained use rights as a warehouse/storage facility.Therefore, <str<strong>on</strong>g>the</str<strong>on</strong>g> current self storage business did not require a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit.Planning permit PD7741 was issued to 159 Heidelberg Road for a five (5) lot subdivisi<strong>on</strong>approved <strong>on</strong> 2 December 1994 creating lot 3. Provisi<strong>on</strong> was made for 12 car spaces for Lot3.Planning permit D/164/2002 was issued to Lot 3 and comm<strong>on</strong> property / 159 HeidelbergRoad to use and develop <str<strong>on</strong>g>the</str<strong>on</strong>g> land a Caretaker’s house <strong>on</strong> 9 September 2002 (generally <str<strong>on</strong>g>the</str<strong>on</strong>g>same as <str<strong>on</strong>g>the</str<strong>on</strong>g> current proposal). Council approved Extensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> Time EOT/27/2004,EOT/61/2005, EOT/91/2006 and EOT/128/2007 <strong>on</strong> 13 August 2004, 16 September 2005, 29November 2006 and 24 January 2008 respectively with <str<strong>on</strong>g>the</str<strong>on</strong>g> permit to be commenced by 9September 2008 and completed by 1 September 2010. Photographic evidence dated 10September 2008 clearly shows that building works were not commenced and <str<strong>on</strong>g>the</str<strong>on</strong>g> permit hasc<strong>on</strong>sequently expired. A fifth request for an extensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> time EOT/92/2010 was made 30August 2010 which was refused by Council. The applicant appealed this refusal to VCAT.Page 3


PLANNING COMMITTEE MINUTES 25 JULY 2011The buildings and works were commenced after <str<strong>on</strong>g>the</str<strong>on</strong>g> permit expired without a valid <str<strong>on</strong>g>planning</str<strong>on</strong>g>permit and Council is pursuing enforcement / legal acti<strong>on</strong> in relati<strong>on</strong> to this matter.Planning permit D/908/03 was issued <strong>on</strong> 20 January 2004 for an enclosed carport and deckto <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west <str<strong>on</strong>g>of</str<strong>on</strong>g> Lot 3 and a reducti<strong>on</strong> in car parking. The proposal reduced <strong>on</strong> site carparking (as approved under <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit PD7741) from 12 to 11 car spaces and did notshow <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house approved under <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/164/2002. It appears that byundertaking buildings and works and reducing car parking under <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/909/03buildings and works can not legally commence under <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/164/2002. Thereare some discrepancies between <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans and <str<strong>on</strong>g>the</str<strong>on</strong>g> development as c<strong>on</strong>structedand <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant has been advised to regularise this matter.Planning Permit D/909/2005 was issued to <str<strong>on</strong>g>the</str<strong>on</strong>g> former Lot 5 / 159 Heidelberg Road at <str<strong>on</strong>g>the</str<strong>on</strong>g>directi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Victorian Civil and Administrative Tribunal <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> 28 July 2006 allowingsubdivisi<strong>on</strong> into 9 lots (Lots 9 to 17). C<strong>on</strong>diti<strong>on</strong> 5 required <str<strong>on</strong>g>the</str<strong>on</strong>g> submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a parkingmanagement plan with Lots 13, 14 and 15 to share car spaces. See <str<strong>on</strong>g>the</str<strong>on</strong>g> following secti<strong>on</strong> inthis report for additi<strong>on</strong>al details <str<strong>on</strong>g>of</str<strong>on</strong>g> permits issued to <str<strong>on</strong>g>the</str<strong>on</strong>g>se lots.Lot 15 / 159 Heidelberg Road is currently operating as part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage business. Thisland does not form part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing use at Lot 3 / 159 Heidelberg Road, is not part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>current applicati<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant has been directed to make a separate <str<strong>on</strong>g>planning</str<strong>on</strong>g> permitapplicati<strong>on</strong> seeking to regularise this warehouse use or to dem<strong>on</strong>strate existing use rights forthis use.It appears 190 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west first floor part <str<strong>on</strong>g>of</str<strong>on</strong>g> Lot 3 / 159 HeidelbergRoad was previously used as a caretaker’s house in associati<strong>on</strong> with <str<strong>on</strong>g>the</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>self storage business. Existing use rights for a caretaker’s house have not been establishedand <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> shows this area as <str<strong>on</strong>g>of</str<strong>on</strong>g>fice associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use. Theapplicant advises that this caretaker’s house was vacated in February 2011 and inspecti<strong>on</strong>sby <str<strong>on</strong>g>planning</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficers have determined that this part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site is currently being used illegallyas a separate <str<strong>on</strong>g>of</str<strong>on</strong>g>fice. Planning applicati<strong>on</strong> D/459/2011 was lodged 16 June 2011 toretrospectively regularise this <str<strong>on</strong>g>of</str<strong>on</strong>g>fice premises.ISSUES AND DISCUSSIONSubject site and surrounding areaThe overall site is fairly regular in shape and is located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north side <str<strong>on</strong>g>of</str<strong>on</strong>g> Heidelberg Roadand has street fr<strong>on</strong>tages to Westfield Street (to <str<strong>on</strong>g>the</str<strong>on</strong>g> east), Albert Street to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear (north)and Holmes Street (to <str<strong>on</strong>g>the</str<strong>on</strong>g> west). It has a fr<strong>on</strong>tage 61.76 m to Heidelberg Road, 59.5 m toWestfield Street, 80.47m to Albert Street and 44 m to Holmes Street. It c<strong>on</strong>tains an industrialestate occupied by a number <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings <str<strong>on</strong>g>of</str<strong>on</strong>g> varying size and character and associated carparking areas.The subject land is part <str<strong>on</strong>g>of</str<strong>on</strong>g> Lot 3 and part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> property <strong>on</strong> PS 336036 E. Lot 3 isin two parts with a total area <str<strong>on</strong>g>of</str<strong>on</strong>g> 1085 square metres, with 156 square metres used to provide11 car spaces. Part A (where <str<strong>on</strong>g>the</str<strong>on</strong>g> development and use is proposed) comprises seven (7)car spaces and is situated in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site fr<strong>on</strong>ting Albert Street andWestfield Street measuring 4.9m wide by 18.4m l<strong>on</strong>g by 3m high with comm<strong>on</strong> propertyabove and below and with an area <str<strong>on</strong>g>of</str<strong>on</strong>g> 90 square metres. Part B measures 995 square metresand is in <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land fr<strong>on</strong>ting Westfield Street and Heidelberg Roadcomprises four (4) car spaces and a two storey plus basement building with a fr<strong>on</strong>tage <str<strong>on</strong>g>of</str<strong>on</strong>g>Page 4


PLANNING COMMITTEE MINUTES 25 JULY 201139.5m to Heidelberg Road and 33.29m to Westfield Street. The self storage facility has anet floor area <str<strong>on</strong>g>of</str<strong>on</strong>g> 2325 square metres.As stated above, <str<strong>on</strong>g>the</str<strong>on</strong>g> site is part <str<strong>on</strong>g>of</str<strong>on</strong>g> a larger warehouse/industrial complex with two storeyindustrial premises c<strong>on</strong>structed to <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary to <str<strong>on</strong>g>the</str<strong>on</strong>g> west and south <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.The older industrial uses/building has been subdivided into smaller commercial and industrialuses with a number <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>fice studio / caretaker’s houses (see below for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong>).To <str<strong>on</strong>g>the</str<strong>on</strong>g> north is Albert Road, a 6m wide road with no footpath characterised by two storeycommercial / warehouse / c<strong>on</strong>verted dwellings c<strong>on</strong>structed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage with a functi<strong>on</strong>similar to a laneway.On <str<strong>on</strong>g>the</str<strong>on</strong>g> north side <str<strong>on</strong>g>of</str<strong>on</strong>g> Albert Street is <str<strong>on</strong>g>the</str<strong>on</strong>g> brick two storey dwellings at 5 Westfield Road and24 Albert Street, both <str<strong>on</strong>g>of</str<strong>on</strong>g> which are c<strong>on</strong>verted warehouses with windows facing <str<strong>on</strong>g>the</str<strong>on</strong>g> subjectsite located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> street fr<strong>on</strong>tage at ground floor and first floor (5 Westfield Street <strong>on</strong>ly).Directly to <str<strong>on</strong>g>the</str<strong>on</strong>g> west <str<strong>on</strong>g>of</str<strong>on</strong>g> Lot 3 Part A is Lot 13 / 7 Westfield Street fr<strong>on</strong>ting Albert Street adouble storey building (see below for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong>).To <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west is a double storey building at Lot 14 / 9 Westfield Street (see below forfur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong>).To <str<strong>on</strong>g>the</str<strong>on</strong>g> south is comm<strong>on</strong> property with seven (7) car spaces for Lots 9 to 15 accessed fromWestfield Street.Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r to <str<strong>on</strong>g>the</str<strong>on</strong>g> north and east (<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> opposite side <str<strong>on</strong>g>of</str<strong>on</strong>g> Westfield Street) are largely single anddouble storey scale buildings with 12 Albert Street and 181 Heidelberg Road in a heritageoverlay.Planning permits issued in <str<strong>on</strong>g>the</str<strong>on</strong>g> area since Council c<strong>on</strong>sidered <str<strong>on</strong>g>planning</str<strong>on</strong>g> applicati<strong>on</strong>D/164/2002 include:• Planning Permit D/912/2005 issued at 14 Albert Street <strong>on</strong> 5 May 2006 for 14 dwellings(16 required car spaces were provided).• Planning Permit D/366/2007 issued to Lot 16 / 159 Heidelberg Road <strong>on</strong> 22 October2007 for an art studio (<str<strong>on</strong>g>of</str<strong>on</strong>g>fice) (<strong>on</strong>e (1) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> eight (8) required car spaces provided). Ac<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> seven (7) car parking spaces was supported with this approval.• Planning permit D/495/2007 issued at Lot 10 / 23 Albert Street <strong>on</strong> 26 February 2008for a warehouse and associated car parking reducti<strong>on</strong> (<strong>on</strong>e (1) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two (2) requiredcar spaces provided). A c<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e (1) car parking space was supported withthis approval.• Planning Permit D/586/2007 issued at Lot 13 / 7 Westfield Street issued <strong>on</strong> 11 March2008 for use <str<strong>on</strong>g>of</str<strong>on</strong>g> land as a visual arts studio. The permit was amended in 5 May 2011 toallow a caretaker's residence, however <str<strong>on</strong>g>the</str<strong>on</strong>g> use has not yet commenced (<strong>on</strong>e (1) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>eight (8) required car spaces were provided).• Planning Permit D/825/2007 issued at Lot 11 / 21 Albert Street <strong>on</strong> 12 June 2008 for an<str<strong>on</strong>g>of</str<strong>on</strong>g>fice and reducti<strong>on</strong> in car parking (<strong>on</strong>e (1) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> six (6) required car spaces provided).A c<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> five (5) car parking spaces was supported with this approval.• Planning permit D/48/2008 issued to 32 Albert Street by VCAT <strong>on</strong> 17 March 2009 for 7dwellings (10 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 11 required car spaces provided). With no parking provided inAlbert Street with <strong>on</strong> street parking for visitors was relied up<strong>on</strong> in Westfield Street andHolmes Street. A c<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e (1) car parking space was supported with thisapproval.Page 5


PLANNING COMMITTEE MINUTES 25 JULY 2011• Planning Permit D/405/2009 issued to Lot 8 / 159 Heidelberg Road 15 December for aCaretaker's Residence and a private artist's Studio with 2 car spaces provided.• Planning Permit D/308/2010 issued at Lot 14 / 9 Westfield Street for use <str<strong>on</strong>g>of</str<strong>on</strong>g> land as astudio (photographic and interior design) and caretaker’s house (<strong>on</strong>e (1) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> eight(8) required car spaces provided). A c<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> seven (7) car parking spaces wassupported with this approval.• Planning Permit D/557/2010 issued at Lot 12 / 19 Albert Street <strong>on</strong> 18 January 2011 foran <str<strong>on</strong>g>of</str<strong>on</strong>g>fice (design studio) and caretaker’s house with a reducti<strong>on</strong> in car parking (<strong>on</strong>e (1)<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> four (4) required car spaces provided). A c<strong>on</strong>cessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) car parkingspaces was supported with this approval.Requirement for a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit and <str<strong>on</strong>g>planning</str<strong>on</strong>g> scheme c<strong>on</strong>trols• Pursuant to Clause 33.03-1 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit isrequired to use <str<strong>on</strong>g>the</str<strong>on</strong>g> land for a caretaker’s house.• Pursuant to Clause 33.03-4 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit isrequired to c<strong>on</strong>struct a building or c<strong>on</strong>struct or carry out works.• Pursuant to Clause 52.06-1 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit isrequired to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> standard car parking requirement.• Pursuant to Clause 52.06-2 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme before a new usecommences or before buildings and works associated with that use or an existing useis c<strong>on</strong>structed <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority is required for <str<strong>on</strong>g>the</str<strong>on</strong>g> car parklayout.• Pursuant to Clause 63.05 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit isrequired for buildings and works.PLANNING CONTROLSList all relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> scheme c<strong>on</strong>trolsState Planning Policy Framework: Clause 17.02.Local Planning Policy Framework: Clause 21.03 and Clause 21.05-5, Clause 22.07 Industrialand Commercial Activity.Z<strong>on</strong>e: Industrial 3 Z<strong>on</strong>e Clause 33.03.Overlay: Development C<strong>on</strong>tributi<strong>on</strong>s Plan (Clause 45.06).Particular Provisi<strong>on</strong>s: Clause 52.06 car parking.General Provisi<strong>on</strong>s: Decisi<strong>on</strong> Guidelines (Clause 63 and Clause 65.01).The land is not within 60 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> a major electricity transmissi<strong>on</strong> line (220 kilovolts ormore) or electricity transmissi<strong>on</strong> easement.A Cultural Heritage Management Plan (under <str<strong>on</strong>g>the</str<strong>on</strong>g> Aboriginal Heritage Act 2006) is notrequired.The land is not affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed SBO.The land is not affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed Heritage Overlay (HO).Page 6


PLANNING COMMITTEE MINUTES 25 JULY 2011INTERNAL REFERRALSTransport Branch• Car spaces adjacent to solid walls must be widened by 300mm as per AS2890.1. forpedestrian access. 2.4m wide car spaces are not acceptable.• A loading bay is to be shown inside <str<strong>on</strong>g>the</str<strong>on</strong>g> existing warehouse and no loading is to takeplace <strong>on</strong> comm<strong>on</strong> property.• The abutting area currently has a very high <strong>on</strong>-street parking occupancy rate. Anyfur<str<strong>on</strong>g>the</str<strong>on</strong>g>r reducti<strong>on</strong> in <str<strong>on</strong>g>of</str<strong>on</strong>g>f-street parking may be detrimental to <str<strong>on</strong>g>the</str<strong>on</strong>g> area and should not besupported unless <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant provides very good reas<strong>on</strong>s why.EXTERNAL REFERRALSMelbourne Water• No objecti<strong>on</strong> subject to c<strong>on</strong>diti<strong>on</strong>s.OBJECTIONS• 15 Objecti<strong>on</strong>s.Objecti<strong>on</strong>s summarised1. Overlooking to north (across Albert Street), to <str<strong>on</strong>g>the</str<strong>on</strong>g> east (across Westfield Street) and to<str<strong>on</strong>g>the</str<strong>on</strong>g> west.2. Impacts up<strong>on</strong> views <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sky.3. Height and scale inappropriate / impacts up<strong>on</strong> streetscape, neighbourhood andheritage character, and n<strong>on</strong>-compliance with Clause 22.04 Neighbourhood Characterpolicy. Inappropriate c<strong>on</strong>structi<strong>on</strong> materials, external finishes and colours. Balc<strong>on</strong>iesinc<strong>on</strong>sistent with Neighbourhood Character / n<strong>on</strong> compliance with Clause 15.01.4. Impacts up<strong>on</strong> property values / negative financial impacts.5. Inappropriate setbacks and pedestrian safety / visibility blocked into Albert Street.6. Illegal buildings and works <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land - Council should have no regard <str<strong>on</strong>g>the</str<strong>on</strong>g> existingstructures.7. The proposal is inc<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> areas demographic which has gentrified since <str<strong>on</strong>g>the</str<strong>on</strong>g>original caretaker’s house applicati<strong>on</strong> into a dynamic creative and cultural precinct withyoung artists and creative business people now residing and working in <str<strong>on</strong>g>the</str<strong>on</strong>g> area.8. Insufficient car parking for such a large dwelling, loss <str<strong>on</strong>g>of</str<strong>on</strong>g> car parking associated with<str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use with <str<strong>on</strong>g>the</str<strong>on</strong>g> building over Lot 3 and n<strong>on</strong>-compliance <str<strong>on</strong>g>planning</str<strong>on</strong>g> permitPD7741 and D/908/2003.9. Impacts <str<strong>on</strong>g>of</str<strong>on</strong>g> trucks loading and unloading in associati<strong>on</strong> with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing self storagebusiness / no loading facilities / c<strong>on</strong>traventi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> owners corporati<strong>on</strong> rules.10. Overdevelopment.11. The proposal is a prohibited family dwelling c<strong>on</strong>trary to Clause 22.07 and is not acaretaker’s house given its size, is separate from <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use, provides lesssecurity / m<strong>on</strong>itoring <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use (existing security cameras address this),Page 7


PLANNING COMMITTEE MINUTES 25 JULY 2011does not assist in <str<strong>on</strong>g>the</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use (loading and unloading / selfstorage not assisted storage) and is not integrated with <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use.12. The previous caretaker’s house (first floor south west corner) already met <str<strong>on</strong>g>the</str<strong>on</strong>g> minimalcaretaker needs and was more integrated with <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use / multiplecaretaker’s houses <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land / associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use.13. Landscaping will limit pedestrian access in Albert Street.14. Site c<strong>on</strong>text plan is inaccurate.15. Plumbing services cannot be provided.16. Loss <str<strong>on</strong>g>of</str<strong>on</strong>g> light to windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> west.17. Visual bulk impacts.18. The proposed use adversely impacts up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> primary use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> z<strong>on</strong>e.19. Noise impacts.20. Lack <str<strong>on</strong>g>of</str<strong>on</strong>g> shadow diagrams.21. Insufficient turning areas.22. Illegal <str<strong>on</strong>g>of</str<strong>on</strong>g>fice / dwelling premises at first floor in south-west corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site / n<strong>on</strong>compliancewith <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/908/2003 (balc<strong>on</strong>y c<strong>on</strong>structi<strong>on</strong>)23. Dish<strong>on</strong>est applicant24. Development located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> propertyOfficer comment <strong>on</strong> summarised objecti<strong>on</strong>s1. See assessment under overlooking.2. See assessment under landmarks views and vistas.3. See assessment under buildings and works / urban design below.4. Impact up<strong>on</strong> property value and financial impacts are not a valid <str<strong>on</strong>g>planning</str<strong>on</strong>g>c<strong>on</strong>siderati<strong>on</strong>.5. The proposal has been referred to Council’s Transport branch who have raised noc<strong>on</strong>cerns about <str<strong>on</strong>g>the</str<strong>on</strong>g> pedestrian access arrangements.6. It is acknowledged that <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> seeks to regularise <str<strong>on</strong>g>the</str<strong>on</strong>g> illegal buildings andworks. The applicati<strong>on</strong> must be assessed <strong>on</strong> its merits.7. The area is in an industrial z<strong>on</strong>e and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is a for a caretaker’s house inassociati<strong>on</strong> with an existing and legitimate self storage (warehouse) use. Councilcannot assess <str<strong>on</strong>g>the</str<strong>on</strong>g> existing use and any discriminati<strong>on</strong> against <str<strong>on</strong>g>the</str<strong>on</strong>g> type <str<strong>on</strong>g>of</str<strong>on</strong>g> residents ina caretaker’s house is not a valid <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>. The issue is whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>the</str<strong>on</strong>g>proposal is a caretaker’s house.8. See assessment under car parking below.9. See assessment under loading and unloading below.10. Having regard to <str<strong>on</strong>g>the</str<strong>on</strong>g> Industrial 3 Z<strong>on</strong>ing <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is not anoverdevelopment.11. See assessment under supervisory role and size <str<strong>on</strong>g>of</str<strong>on</strong>g> caretaker’s house below.12. See assessment under multiple caretaker’s house below.Page 8


PLANNING COMMITTEE MINUTES 25 JULY 201113. The lack <str<strong>on</strong>g>of</str<strong>on</strong>g> a footpath is an existing c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> street. There are no carriagewayrights available to <str<strong>on</strong>g>the</str<strong>on</strong>g> public over <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land and it is bey<strong>on</strong>d <str<strong>on</strong>g>the</str<strong>on</strong>g> scope <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>applicati<strong>on</strong> to require <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> public pedestrian access over <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land.14. The c<strong>on</strong>text plan has been revised to reflect existing surrounding uses anddevelopment.15. Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> plumbing services is not a relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>. This is abuilding permit matter.16. See assessment under overshadowing below.17. See assessment under urban design and visual bulk below.18. See assessment under use <str<strong>on</strong>g>of</str<strong>on</strong>g> land below.19. The proposal will not introduce inappropriate noise into <str<strong>on</strong>g>the</str<strong>on</strong>g> area. Traffic noiseassociated with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> will be negligible.20. There are no private open spaces in proximity to <str<strong>on</strong>g>the</str<strong>on</strong>g> site which will be overshadowedand shadow diagrams are not required.21. See assessment under car parking below.22. See site history. These matters are to be addressed as part <str<strong>on</strong>g>of</str<strong>on</strong>g> applicati<strong>on</strong> D/459/2011for <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>fice at first floor in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-west corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building.23. The character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant is not a relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>.24. It is understood that <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant has a 99 year lease over <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> property. Theapplicati<strong>on</strong> form identifies <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land. Council’s solicitors have advised that anapplicati<strong>on</strong> <strong>on</strong> comm<strong>on</strong> property is legitimate and should be assessed <strong>on</strong> its merits.PLANNING ASSESSMENTUse <str<strong>on</strong>g>of</str<strong>on</strong>g> landOff site impacts associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> useHaving regard to Clause 33.03-2 <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s use does not adversely affect <str<strong>on</strong>g>the</str<strong>on</strong>g>amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood through <str<strong>on</strong>g>the</str<strong>on</strong>g> transport <str<strong>on</strong>g>of</str<strong>on</strong>g> materials, <str<strong>on</strong>g>the</str<strong>on</strong>g> appearance <str<strong>on</strong>g>of</str<strong>on</strong>g> anystored goods or materials or through emissi<strong>on</strong>s. The proposal is not industrial in nature andwill not affect nearby residential areas which are sensitive to industrial <str<strong>on</strong>g>of</str<strong>on</strong>g>f-site effects. Thereare no nearby industries which will affect <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed use. The land can be drained andc<strong>on</strong>nected to services. The proposal is unlikely to generate significant traffic <strong>on</strong> surroundingroads.Multiple caretaker’s houses / dwellingsThe applicant has not provided evidence in support <str<strong>on</strong>g>of</str<strong>on</strong>g> existing use rights for a caretaker’shouse <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land and is not relying up<strong>on</strong> such rights. The proposal is for <strong>on</strong>e caretaker’shouse and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is required to be assessed <strong>on</strong> its merits. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> weresupported a c<strong>on</strong>diti<strong>on</strong> would be required to ensure that <strong>on</strong>ly <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>on</strong>e (1) approved caretaker’shouse can operate from <str<strong>on</strong>g>the</str<strong>on</strong>g> land.In <str<strong>on</strong>g>the</str<strong>on</strong>g> event that a <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit were to issue <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house could not be used byany<strong>on</strong>e o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than a supervisor. Should it be rented out to ano<str<strong>on</strong>g>the</str<strong>on</strong>g>r party not associated with<str<strong>on</strong>g>the</str<strong>on</strong>g> main use it would become a prohibited dwelling and Council would <str<strong>on</strong>g>the</str<strong>on</strong>g>n take acti<strong>on</strong> toensure <str<strong>on</strong>g>the</str<strong>on</strong>g> use ceased.Page 9


PLANNING COMMITTEE MINUTES 25 JULY 2011Future applicati<strong>on</strong>s for caretaker’s houses / buildings and works / multiple premises wouldneed to be assessed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>ir merits.Supervisory RoleUnder Clause 73 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme a caretaker’s house is nested underdwelling use and is defined as:A dwelling <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> same site as a building, operati<strong>on</strong>, or plant, and occupied by a supervisor<str<strong>on</strong>g>of</str<strong>on</strong>g> that building, operati<strong>on</strong>, or plant.In Applicati<strong>on</strong> for Review No. 2000/002033 Graphos Architects v Moreland <strong>City</strong> Council, <str<strong>on</strong>g>the</str<strong>on</strong>g>Tribunal noted that:In <str<strong>on</strong>g>the</str<strong>on</strong>g> new definiti<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> occupati<strong>on</strong> is required to be by <str<strong>on</strong>g>the</str<strong>on</strong>g> "supervisor". Does <str<strong>on</strong>g>the</str<strong>on</strong>g>supervisor have to take an active part in <str<strong>on</strong>g>the</str<strong>on</strong>g> supervisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> what occurs in <str<strong>on</strong>g>the</str<strong>on</strong>g> building or is itsufficient for a pers<strong>on</strong> to merely occupy <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling comp<strong>on</strong>ent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building to complywith <str<strong>on</strong>g>the</str<strong>on</strong>g> requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> supervisor? It is <str<strong>on</strong>g>the</str<strong>on</strong>g> Tribunal's view that <str<strong>on</strong>g>the</str<strong>on</strong>g> supervisor must take anactive role in <str<strong>on</strong>g>the</str<strong>on</strong>g> supervisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> activities to be carried out within <str<strong>on</strong>g>the</str<strong>on</strong>g> building. A caretakermight act in <str<strong>on</strong>g>the</str<strong>on</strong>g> capacity as a night watchman, it could <str<strong>on</strong>g>the</str<strong>on</strong>g>refore be said that by living abovecommercial premises that pers<strong>on</strong> is carrying out <str<strong>on</strong>g>the</str<strong>on</strong>g> functi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a caretaker.Clause 22.07 Industrial and Commercial Activity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme includes<str<strong>on</strong>g>the</str<strong>on</strong>g> objective to restrict caretakers’ houses to those that are properly planned andappropriately located for <str<strong>on</strong>g>the</str<strong>on</strong>g>ir supervisory role to associated industrial or commercial activity.The applicant has stated that <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house will be occupied by <str<strong>on</strong>g>the</str<strong>on</strong>g> supervisor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>self storage operati<strong>on</strong>s and that part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s role is to provide emergency accessoutside <str<strong>on</strong>g>of</str<strong>on</strong>g> business hours, provide security to property, and undertake regular m<strong>on</strong>itoring <str<strong>on</strong>g>of</str<strong>on</strong>g>plant and equipment associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> refrigerati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> specialised storage areas. Theapplicant has also stated that <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house affords an unobstructed view<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> facility grounds and access areas ensuring that it is appropriately located for itssupervisory role. It is understood that closed circuit televisi<strong>on</strong> is also provided within <str<strong>on</strong>g>the</str<strong>on</strong>g> site.It is c<strong>on</strong>tended by <str<strong>on</strong>g>of</str<strong>on</strong>g>ficers that <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building provides no real surveillance to <str<strong>on</strong>g>the</str<strong>on</strong>g>south, with access from Albert Street and fixed obscure glazed windows provided to <str<strong>on</strong>g>the</str<strong>on</strong>g>south at first floor level (via a corridor) with no o<str<strong>on</strong>g>the</str<strong>on</strong>g>r south facing windows. Upper levelbalc<strong>on</strong>ies would provide minimal surveillance opportunity given <str<strong>on</strong>g>the</str<strong>on</strong>g>ir limited use. This lack <str<strong>on</strong>g>of</str<strong>on</strong>g>interface with <str<strong>on</strong>g>the</str<strong>on</strong>g> commercial use is a fundamental failure <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development.It is noted that if <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported south facing windows (with low sill heightsand no obscure glazing) to all habitable rooms at first, sec<strong>on</strong>d and third floors (located toensure no overlooking to habitable room windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> west) would be required, as would ac<strong>on</strong>diti<strong>on</strong> to ensure that <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>tact details <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house are available to allcustomers for emergency access. Even so <str<strong>on</strong>g>the</str<strong>on</strong>g> physical separati<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> self storagefacility and <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house (located <strong>on</strong> predominantly <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> property) is <str<strong>on</strong>g>of</str<strong>on</strong>g>c<strong>on</strong>cern.Size <str<strong>on</strong>g>of</str<strong>on</strong>g> caretaker’s houseNumerous objectors have noted that <str<strong>on</strong>g>the</str<strong>on</strong>g> size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house is unusuallylarge with four bedrooms, three bathrooms and a generous living area over 227 squaremetres. In comparis<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility has a net floor area <str<strong>on</strong>g>of</str<strong>on</strong>g> 2325 square metres.Accommodati<strong>on</strong> (with <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a caretaker’s house) is a prohibited use in <str<strong>on</strong>g>the</str<strong>on</strong>g>Industrial 3 Z<strong>on</strong>e. Clause 17.02 Industrial Land Development, Clause 21.03, Clause 21.05-5Ec<strong>on</strong>omic development and Clause 33.03 Industrial 3 Z<strong>on</strong>e all generally identify <str<strong>on</strong>g>the</str<strong>on</strong>g> need toprotect existing industrial areas to facilitate fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r industrial development and avoid <str<strong>on</strong>g>the</str<strong>on</strong>g>Page 10


PLANNING COMMITTEE MINUTES 25 JULY 2011encroachment <str<strong>on</strong>g>of</str<strong>on</strong>g> sensitive residential uses which would adversely affect industry viability orprejudice <str<strong>on</strong>g>the</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> industrial land for future industrial requirements. Clause 22.07Industrial and Commercial activity includes <str<strong>on</strong>g>the</str<strong>on</strong>g> objectives:• To ensure caretakers’ dwellings do not adversely impact up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> primary use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>z<strong>on</strong>e.• To prevent caretakers’ residences being developed for general residential purposes.This is because accommodati<strong>on</strong> (and <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity associated with it) has <str<strong>on</strong>g>the</str<strong>on</strong>g> potential tocreate land use c<strong>on</strong>flicts with established and / or future industrial and commercial landuses. As a generalisati<strong>on</strong> accommodati<strong>on</strong> uses do not facilitate fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r industrialdevelopment, do not protect <str<strong>on</strong>g>the</str<strong>on</strong>g> industrial area from <str<strong>on</strong>g>the</str<strong>on</strong>g> encroachment <str<strong>on</strong>g>of</str<strong>on</strong>g> residential useswhich would affect industry viability and will prejudice <str<strong>on</strong>g>the</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> land for futureindustrial requirements. For <str<strong>on</strong>g>the</str<strong>on</strong>g>se same reas<strong>on</strong>s a caretaker’s house is not necessarilyappropriate in an Industrial 3 Z<strong>on</strong>e.It is noted that <str<strong>on</strong>g>the</str<strong>on</strong>g>re have been a significant number <str<strong>on</strong>g>of</str<strong>on</strong>g> caretaker’s houses approved at 159Heidelberg Road. Also <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding area does not include existing industries whichtypically create amenity impacts up<strong>on</strong> residential uses. Due to <str<strong>on</strong>g>the</str<strong>on</strong>g> small size <str<strong>on</strong>g>of</str<strong>on</strong>g> lots and <str<strong>on</strong>g>the</str<strong>on</strong>g>large number <str<strong>on</strong>g>of</str<strong>on</strong>g> caretaker houses <str<strong>on</strong>g>the</str<strong>on</strong>g> industrial nature <str<strong>on</strong>g>of</str<strong>on</strong>g> this area is unusual and it wouldlikely be difficult to establish a new industrial use in <str<strong>on</strong>g>the</str<strong>on</strong>g> area. This is evidenced by <str<strong>on</strong>g>the</str<strong>on</strong>g> str<strong>on</strong>gresidential amenity c<strong>on</strong>cerns raised by objectors (privacy / overlooking and overshadowing).Notwithstanding this it is noted that <str<strong>on</strong>g>the</str<strong>on</strong>g> caretakers houses approved <strong>on</strong> surroundingproperties have all been modest in size and are str<strong>on</strong>gly associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> a smallcommercial use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land.It is noted that Council is not currently undertaking a strategic review <str<strong>on</strong>g>of</str<strong>on</strong>g> this industrial pocket.The Industrial Land Use Strategy 2001 identifies <str<strong>on</strong>g>the</str<strong>on</strong>g> future strategic intent to rez<strong>on</strong>e area 16(Heidelberg Road and Westfield Street) from Industrial 3 Z<strong>on</strong>e to Business 3 Z<strong>on</strong>e (<strong>on</strong>Heidelberg Road) and Residential 1 (north <str<strong>on</strong>g>of</str<strong>on</strong>g> Albert St). Under <str<strong>on</strong>g>the</str<strong>on</strong>g> Business 3 Z<strong>on</strong>eaccommodati<strong>on</strong> use remains prohibited and a caretaker’s house c<strong>on</strong>tinues to require a<str<strong>on</strong>g>planning</str<strong>on</strong>g> permit.The self storage use is a large premises, however it does not follow that this should allow acomparatively large caretaker’s house. This matter has been discussed with Council’sSolicitors who have indicated that whilst it is not a determining issue, <str<strong>on</strong>g>the</str<strong>on</strong>g> size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>caretaker’s house could possibly be an appropriate ground <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal. Certainly o<str<strong>on</strong>g>the</str<strong>on</strong>g>r<str<strong>on</strong>g>planning</str<strong>on</strong>g> schemes (<strong>City</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Yarra) specify maximum caretaker’s house sizes (10% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> siteare or 100 square metres whichever is lesser) in order to prevent <str<strong>on</strong>g>the</str<strong>on</strong>g> fragmentati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>industrial land by residential uses. Whilst <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme does not specify aminimum or maximum size <str<strong>on</strong>g>of</str<strong>on</strong>g> a caretaker’s house it is reas<strong>on</strong>able to c<strong>on</strong>sider that a large(and intensive) caretaker’s house does not reflect <str<strong>on</strong>g>the</str<strong>on</strong>g> underlying objectives <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> z<strong>on</strong>e andincreases potential future c<strong>on</strong>flicts with commercial uses in <str<strong>on</strong>g>the</str<strong>on</strong>g> area. On <str<strong>on</strong>g>the</str<strong>on</strong>g> balance <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g>se matters it is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling is not appropriate.Buildings and Works / Urban DesignClause 15.01 and Clause 22.07 specify urban design matters to be c<strong>on</strong>sidered. Thecharacter <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area is clearly industrial. The design is c<strong>on</strong>temporary and industrial innature. It is <str<strong>on</strong>g>of</str<strong>on</strong>g> a scale c<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r factory warehouse buildings in <str<strong>on</strong>g>the</str<strong>on</strong>g> Industrial3 Z<strong>on</strong>e. The site is not located within a Heritage Overlay and subject to some changes toimprove <str<strong>on</strong>g>the</str<strong>on</strong>g> design would be sympa<str<strong>on</strong>g>the</str<strong>on</strong>g>tic to <str<strong>on</strong>g>the</str<strong>on</strong>g> industrial character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area. However as<str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is not supported <str<strong>on</strong>g>the</str<strong>on</strong>g> design forms part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal.Page 11


PLANNING COMMITTEE MINUTES 25 JULY 2011C<strong>on</strong>textClause 22.04 Neighbourhood Character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme applies <strong>on</strong>ly toresidentially z<strong>on</strong>ed land and is not applicable in <str<strong>on</strong>g>the</str<strong>on</strong>g> Industrial 3 Z<strong>on</strong>e / subject site.The Public Realm.The proposal provides a poor architectural resp<strong>on</strong>se to <str<strong>on</strong>g>the</str<strong>on</strong>g> area and detracts from <str<strong>on</strong>g>the</str<strong>on</strong>g> publicrealm.SafetyAlbert Street has no pedestrian footpath. The proposal has a pedestrian entrance <strong>on</strong>to AlbertStreet to <str<strong>on</strong>g>the</str<strong>on</strong>g> north and from <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> car park to <str<strong>on</strong>g>the</str<strong>on</strong>g> south. The access <strong>on</strong>to AlbertStreet is not an appropriate design resp<strong>on</strong>se raising pedestrian safety issues for thoseaccessing <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported a c<strong>on</strong>diti<strong>on</strong> would berequired deleting pedestrian access to <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house from Albert Street to improvepedestrian safety for <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house (and to streng<str<strong>on</strong>g>the</str<strong>on</strong>g>n its link to <str<strong>on</strong>g>the</str<strong>on</strong>g> self storageuse).The proposed balc<strong>on</strong>ies are an appropriate design element, providing passive surveillance<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> public realm. The development is not designed to provide good surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g> carparking and <str<strong>on</strong>g>the</str<strong>on</strong>g> internal accessway (or for that matter <str<strong>on</strong>g>the</str<strong>on</strong>g> business which it is suggested tobe attached to). The proposed caretaker’s car space is not an adequately secure form <str<strong>on</strong>g>of</str<strong>on</strong>g>parking.Landmarks, views and vistasPlanning policy does not identify any significant views in this locati<strong>on</strong>. There is no <str<strong>on</strong>g>planning</str<strong>on</strong>g>right to <str<strong>on</strong>g>the</str<strong>on</strong>g> protecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a view where policy does not identify and protect views.Pedestrian spacesThe proposal provides minimal interfaces with Albert Street / Westfield Street with carparking / no habitable rooms / windows at ground floor level.HeritageThe site is not located within a heritage overlay and does not propose <str<strong>on</strong>g>the</str<strong>on</strong>g> demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> anybuildings. It obscures views <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing eastern building façade <str<strong>on</strong>g>of</str<strong>on</strong>g> 7 Westfield Street,however this building is not <str<strong>on</strong>g>of</str<strong>on</strong>g> identified heritage significance.C<strong>on</strong>solidati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> sites and empty sitesThe proposal seeks to c<strong>on</strong>solidate <str<strong>on</strong>g>the</str<strong>on</strong>g> site, providing a building over an existing car parkarea. The design is quite simplistic, and does not c<strong>on</strong>tribute to <str<strong>on</strong>g>the</str<strong>on</strong>g> complexity and diversity<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> built envir<strong>on</strong>ment.The scale <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building is not out <str<strong>on</strong>g>of</str<strong>on</strong>g> keeping with <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding development.Light and shadeThe proposal will not overshadow <str<strong>on</strong>g>the</str<strong>on</strong>g> public realm.Energy and resource efficiencyThe proposal appears to be generally energy efficient. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported astandard sustainability c<strong>on</strong>diti<strong>on</strong> would be required.Page 12


PLANNING COMMITTEE MINUTES 25 JULY 2011Architectural qualityThe proposal generally provides natural finish c<strong>on</strong>crete slab c<strong>on</strong>structi<strong>on</strong> with ornameshcladding to <str<strong>on</strong>g>the</str<strong>on</strong>g> third floor facades and <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor north facade. The design alsoincludes sunshades <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north elevati<strong>on</strong> which extend outside <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site into <str<strong>on</strong>g>the</str<strong>on</strong>g> AlbertStreet.A building which extends into public street / outside <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site is not appropriate.The design is quite brutal and does not add visual interest to <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape, is notc<strong>on</strong>temporary, employs limited modern materials, does not appropriately address <str<strong>on</strong>g>the</str<strong>on</strong>g>streetscape and is not c<strong>on</strong>sistent with Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>the</str<strong>on</strong>g> design does not achieve high standards in architecture and urban design and isnot c<strong>on</strong>sistent with Clause 15.01 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported a c<strong>on</strong>diti<strong>on</strong> requiring a colours and materials schedulewould be required. More engaging materials such as metal, timber or st<strong>on</strong>e cladding areneeded to <str<strong>on</strong>g>the</str<strong>on</strong>g> north, south and east façades which are all highly visible from <str<strong>on</strong>g>the</str<strong>on</strong>g> publicrealm. Also if <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported all architectural features should be shownwithin <str<strong>on</strong>g>the</str<strong>on</strong>g> property boundaries.Landscape architectureClause 15.01 and Clause 22.07 place emphasis up<strong>on</strong> landscaping, with suitable lowmaintenance landscaping recommended to fr<strong>on</strong>t and side setbacks to improve <str<strong>on</strong>g>the</str<strong>on</strong>g>appearance <str<strong>on</strong>g>of</str<strong>on</strong>g> industrial and commercial areas. Landscaping comprising a 1.1m wide by5.2m l<strong>on</strong>g bed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> east boundary and 0.3m wide by 14m l<strong>on</strong>g bed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north boundaryare proposed. Landscaping is not a str<strong>on</strong>g part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area with <str<strong>on</strong>g>the</str<strong>on</strong>g>industrial and residential properties surrounding <str<strong>on</strong>g>the</str<strong>on</strong>g> site having limited landscaping, withbuildings generally having zero setbacks <strong>on</strong> fr<strong>on</strong>t and side boundaries and covering most <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> land. Notwithstanding <str<strong>on</strong>g>the</str<strong>on</strong>g> landscape character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area and <str<strong>on</strong>g>the</str<strong>on</strong>g> scale <str<strong>on</strong>g>of</str<strong>on</strong>g> surroundingdevelopment, having regard to <str<strong>on</strong>g>the</str<strong>on</strong>g> size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed landscaping bedsat ground floor are c<strong>on</strong>sidered insufficient. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported a landscapeplan would be required with climbing plants provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north and west elevati<strong>on</strong>s andpermanent planter boxes in <str<strong>on</strong>g>the</str<strong>on</strong>g> sec<strong>on</strong>d floor and third floor balc<strong>on</strong>ies. As <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> isnot being supported this will form part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal.Amenity ImpactsIt is a fundamental <str<strong>on</strong>g>planning</str<strong>on</strong>g> principle that residents living within, or closely abutting n<strong>on</strong>residentialz<strong>on</strong>es cannot expect <str<strong>on</strong>g>the</str<strong>on</strong>g> same level <str<strong>on</strong>g>of</str<strong>on</strong>g> residential amenity as residents living in<str<strong>on</strong>g>the</str<strong>on</strong>g> middle <str<strong>on</strong>g>of</str<strong>on</strong>g> pristine residential areas. This does not mean that issues <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity such asnoise, overshadowing or overlooking should be ignored but ra<str<strong>on</strong>g>the</str<strong>on</strong>g>r that lower standards areboth acceptable and realistic in such locati<strong>on</strong>s.Clause 22.07 notes that a high standard <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity within industrial and commercial areas isdesired, however <str<strong>on</strong>g>the</str<strong>on</strong>g> underlying policy focuses more <strong>on</strong> protecting <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g>residentially z<strong>on</strong>ed land surrounding <str<strong>on</strong>g>the</str<strong>on</strong>g> industrial z<strong>on</strong>e and limiting <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity impacts <str<strong>on</strong>g>of</str<strong>on</strong>g>industrial activity. A caretaker’s house will provide a more sensitive buffer to adjacentresidential (and commercial) uses than an industrial use.OverlookingTo <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east <str<strong>on</strong>g>the</str<strong>on</strong>g> habitable room windows <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling at 3/6 Westfield Street in <str<strong>on</strong>g>the</str<strong>on</strong>g>Residential 1 Z<strong>on</strong>e are more than 22m from <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site and face <str<strong>on</strong>g>the</str<strong>on</strong>g> public realm. Theproposal raises no unreas<strong>on</strong>able privacy issues and accordingly east facing balc<strong>on</strong>ies andwindows within <str<strong>on</strong>g>the</str<strong>on</strong>g> development do not need to be screened.Page 13


PLANNING COMMITTEE MINUTES 25 JULY 2011To <str<strong>on</strong>g>the</str<strong>on</strong>g> north <str<strong>on</strong>g>the</str<strong>on</strong>g>re are ground floor windows at 5 Westfield Street and 24 Albert Street in <str<strong>on</strong>g>the</str<strong>on</strong>g>Residential 1 Z<strong>on</strong>e located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> property boundary facing Albert Street. These arecurrently overlooked by pedestrians and vehicles from within Albert Street. The properties to<str<strong>on</strong>g>the</str<strong>on</strong>g> west at 7 Westfield and 9 Westfield Street are commercial uses with caretaker’s housesin Industrial 3 Z<strong>on</strong>e and include ground and first floor east facing windows.If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported c<strong>on</strong>diti<strong>on</strong>s would be recommended requiring that all westfacing windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> stairway landings be deleted (at all levels) and that all north facingwindows and balc<strong>on</strong>ies (at all levels) be screened to 1.7m above finished floor level. Havingregard to <str<strong>on</strong>g>the</str<strong>on</strong>g> need to provide surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> car park and self storage facility(see supervisory role above) if <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported windows would also need tobe provided at ground, first and sec<strong>on</strong>d floor and setback more than 5m from <str<strong>on</strong>g>the</str<strong>on</strong>g> westboundary <str<strong>on</strong>g>of</str<strong>on</strong>g> Lot 3 to ensure that <str<strong>on</strong>g>the</str<strong>on</strong>g>re are no views within 9m <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> studio windows to <str<strong>on</strong>g>the</str<strong>on</strong>g>west.As <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> is not supported overlooking shall form part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal.OvershadowingThe land is in an Industrial 3 Z<strong>on</strong>e where <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose is to ensure that uses do not affect <str<strong>on</strong>g>the</str<strong>on</strong>g>safety and amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> adjacent, more sensitive land uses. In an Industrial 3 Z<strong>on</strong>e residentialamenity expectati<strong>on</strong>s for caretaker’s houses are lower than for normal dwellings withinresidential areas. Also in an Industrial 3 Z<strong>on</strong>e commercial uses are not deemed to besensitive uses and protecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>ir amenity has limited relevance. It is noted that <str<strong>on</strong>g>the</str<strong>on</strong>g>proposed caretakers’ house is significantly more sympa<str<strong>on</strong>g>the</str<strong>on</strong>g>tic to surrounding uses thanindustrial uses which normally locate in this z<strong>on</strong>e. The proposal is setback 1m from <str<strong>on</strong>g>the</str<strong>on</strong>g> westadjacent windows at 7 Westfield Street, with <str<strong>on</strong>g>the</str<strong>on</strong>g> sec<strong>on</strong>d floor parapet 4m above <str<strong>on</strong>g>the</str<strong>on</strong>g> firstfloor level <str<strong>on</strong>g>of</str<strong>on</strong>g> 7 Westfield Street. Clause 55 is not applicable in an industrial z<strong>on</strong>e, howeverunder Clause 55.04-3 daylight to existing windows objective Standard B19 a 1m by 3m areaclear to <str<strong>on</strong>g>the</str<strong>on</strong>g> sky should be provided (it is) and a wall should be setback half its height above<str<strong>on</strong>g>the</str<strong>on</strong>g> floor level (2m setback) from a habitable room window (1m setback provided). Under <str<strong>on</strong>g>the</str<strong>on</strong>g>decisi<strong>on</strong> guidelines <str<strong>on</strong>g>the</str<strong>on</strong>g> impact up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing caretaker’s house should bec<strong>on</strong>sidered. It is noted that 7 Westfield Street includes two large north facing windows to itsupper floor area which is an open plan area. In an Industrial 3 Z<strong>on</strong>e <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal’s sec<strong>on</strong>dfloor setback is c<strong>on</strong>sidered to provide appropriate amenity to <str<strong>on</strong>g>the</str<strong>on</strong>g> adjacent business.However <str<strong>on</strong>g>the</str<strong>on</strong>g> 1m setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> third floor does limit light to this window. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong>were supported <str<strong>on</strong>g>the</str<strong>on</strong>g> third floor wall would need to be setback an additi<strong>on</strong>al 1m from <str<strong>on</strong>g>the</str<strong>on</strong>g> westadjacent windows to maintain light access.As <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> is not being supported this will be raised as a ground <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal.Visual BulkThe proposal is <str<strong>on</strong>g>of</str<strong>on</strong>g> a similar scale to <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding buildings and is generally acceptable.The 1m setback from 7 Westfield Street at sec<strong>on</strong>d floor and third floor raises bulk issues. If<str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported <str<strong>on</strong>g>the</str<strong>on</strong>g> third floor wall would need to be setback an additi<strong>on</strong>al 1mfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> west adjacent windows to minimise bulk impacts.As <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> is not being supported this will be raised as a ground <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal.Car ParkingCar Parking Provisi<strong>on</strong>The proposal will reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> number <str<strong>on</strong>g>of</str<strong>on</strong>g> car spaces provided <strong>on</strong>-site from 11 to nine (9), witha reducti<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> car spaces allocated to <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility from 11 to eight (8) and <strong>on</strong>e(1) car space allocated to <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house.Page 14


PLANNING COMMITTEE MINUTES 25 JULY 2011The self storage use was assessed under <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/908/03 by Council as awarehouse, which is defined as “land used to store or display goods. It may include <str<strong>on</strong>g>the</str<strong>on</strong>g>distributi<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> wholesale selling <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> goods”. Pursuant to Clause 52.06-5, 1.5 carspaces per 100 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> net floor area are required for a warehouse use. Havingregard to <str<strong>on</strong>g>the</str<strong>on</strong>g> floor area <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> premises <str<strong>on</strong>g>the</str<strong>on</strong>g> use has a car parking demand <str<strong>on</strong>g>of</str<strong>on</strong>g> 15 car spaces.The caretaker’s house requires <strong>on</strong>e (1) car space pursuant to Clause 52.06-5.It should be noted that car parking has never been specified for <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site as a selfstorage facility. Planning permit PD7741 allocated 12 car spaces to Lot 3 and <str<strong>on</strong>g>planning</str<strong>on</strong>g>permit D/908/03 reduced this number to 11. C<strong>on</strong>sequently <str<strong>on</strong>g>the</str<strong>on</strong>g> current provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> carspaces is lawful with <str<strong>on</strong>g>the</str<strong>on</strong>g> above menti<strong>on</strong>ed <str<strong>on</strong>g>planning</str<strong>on</strong>g> permits comprising a restricti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g>use pursuant to Clause 63. The proposal requires permissi<strong>on</strong> to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> number <str<strong>on</strong>g>of</str<strong>on</strong>g> carspaces provided <strong>on</strong> site as per Clause 52.06-1.Council must have regard to <str<strong>on</strong>g>the</str<strong>on</strong>g> decisi<strong>on</strong> guidelines as c<strong>on</strong>tained in Clause 52.06-1. Inc<strong>on</strong>siderati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> request to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> number <str<strong>on</strong>g>of</str<strong>on</strong>g> car spaces, <str<strong>on</strong>g>the</str<strong>on</strong>g> following is noted:• There is no parking precinct plan to which Council may assess <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal, <str<strong>on</strong>g>the</str<strong>on</strong>g>refore<str<strong>on</strong>g>the</str<strong>on</strong>g> assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> must be <strong>on</strong> its merits;• There has been a significant change in <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding area and <strong>on</strong> Lot 3 since <str<strong>on</strong>g>the</str<strong>on</strong>g>approval <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> permit D/164/02. As a c<strong>on</strong>sequence <str<strong>on</strong>g>the</str<strong>on</strong>g>re is minimal <strong>on</strong> streetparking available and this cannot be relied up<strong>on</strong> to support <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong>.• The caretaker’s house has a parking requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e (1) car space under Clause52.06. Having regard to its size <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling it is likely to have an empirical demand <str<strong>on</strong>g>of</str<strong>on</strong>g>two (2) car spaces (this cannot be required to be provided but is noted for assessmentpurposes). A review <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> applicati<strong>on</strong>s for self storage facilities at VCATindicated a peak empirical car parking demand <str<strong>on</strong>g>of</str<strong>on</strong>g> 0.2 spaces per 100 square metres(Moor Room Self Storage Pty Ltd v Frankst<strong>on</strong> CC [2008] P1541 2008). Applying thisrate to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing 2325 square metre self storage use yields a parking demand <str<strong>on</strong>g>of</str<strong>on</strong>g> five(5) car spaces. The applicant has indicated that <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage use is operated by<strong>on</strong>e (1) permanent employee, equating to <strong>on</strong>e (1) l<strong>on</strong>g term car space required forstaff. It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> total empirical demand <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility andcaretaker’s house is seven (7) car spaces, with three (3) l<strong>on</strong>g term car spaces requiredfor staff / residents and four (4) short term car spaces required for customers.• For completeness it is noted that a store, which is defined as “land used to storegoods, machinery, or vehicles” has a parking demand under Clause 52.06 <str<strong>on</strong>g>of</str<strong>on</strong>g> 10percent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site area (requiring 109 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 1085 square metres site tobe allocated to car parking (not including comm<strong>on</strong> property areas). The proposalreduces <str<strong>on</strong>g>the</str<strong>on</strong>g> area <str<strong>on</strong>g>of</str<strong>on</strong>g> car parking from 155 square metres to 115 square metres. It isnoted that <str<strong>on</strong>g>the</str<strong>on</strong>g> parking rate for a store does not reflect <str<strong>on</strong>g>the</str<strong>on</strong>g> multi-level nature <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>existing building and does not reflect <str<strong>on</strong>g>the</str<strong>on</strong>g> empirical demand associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> use.• There is public transport available in <str<strong>on</strong>g>the</str<strong>on</strong>g> area in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> buses al<strong>on</strong>g HeidelbergRoad and nearby Westgarth Street.• The layout <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> five (5) proposed car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> north east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site withwalls enclosing all car spaces does not allow c<strong>on</strong>venient pedestrian access to <str<strong>on</strong>g>the</str<strong>on</strong>g> carspaces (see below) and will result in <str<strong>on</strong>g>the</str<strong>on</strong>g> spaces being underutilised. See design andc<strong>on</strong>structi<strong>on</strong> below. At best <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal provides two (2) customer car spaces and noresident car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> north east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.Page 15


PLANNING COMMITTEE MINUTES 25 JULY 2011• The four (4) remaining car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site are notc<strong>on</strong>veniently located in relati<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> loading areas and, given that <str<strong>on</strong>g>planning</str<strong>on</strong>g> permitD/908/03 allowed <str<strong>on</strong>g>the</str<strong>on</strong>g>m to be enclosed for l<strong>on</strong>g term staff use <strong>on</strong>ly (not short termcustomer use), <str<strong>on</strong>g>the</str<strong>on</strong>g>y cannot be reas<strong>on</strong>ably c<strong>on</strong>sidered for customer use with thisapplicati<strong>on</strong>. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported <str<strong>on</strong>g>the</str<strong>on</strong>g> car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> south-west cornerwould need to be shown as unenclosed (to allow customer access). This would providea total <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) usable car spaces <strong>on</strong> site, insufficient to meet <str<strong>on</strong>g>the</str<strong>on</strong>g> empirical demandassociated with <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal. C<strong>on</strong>sequently <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is likely to result in additi<strong>on</strong>al<strong>on</strong> street parking and comm<strong>on</strong> property impacts.• <strong>City</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>Darebin</strong> Transport Management and Planning have stated that <str<strong>on</strong>g>the</str<strong>on</strong>g>y havec<strong>on</strong>cerns with <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed reducti<strong>on</strong> in car parking and that <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal cannot besupported without justificati<strong>on</strong> given limited availability <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong> street car parking. Anassessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> usage <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing <strong>on</strong> site parking is not feasible at this timehaving regard to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing building works in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site, <str<strong>on</strong>g>the</str<strong>on</strong>g>illegal <str<strong>on</strong>g>of</str<strong>on</strong>g>fice use occurring <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land and <str<strong>on</strong>g>the</str<strong>on</strong>g> n<strong>on</strong>-compliance with <str<strong>on</strong>g>planning</str<strong>on</strong>g> permitD/908/03.• The plans do not clearly allocate <str<strong>on</strong>g>the</str<strong>on</strong>g> “existing carpark retained” car spaces to <str<strong>on</strong>g>the</str<strong>on</strong>g> selfstorage use. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported <str<strong>on</strong>g>the</str<strong>on</strong>g> four (4) proposed “existing carparkretained” car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site would be required to bemarked and identified with signs as “self storage use”.The car parking reducti<strong>on</strong> will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding local streets andcomm<strong>on</strong> property and <str<strong>on</strong>g>the</str<strong>on</strong>g> waiving <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> car space is not acceptable.Design and c<strong>on</strong>structi<strong>on</strong>The car parking plan submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> does not provide for pedestrianmovement within and around <str<strong>on</strong>g>the</str<strong>on</strong>g> parking area in <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site (with all carspaces c<strong>on</strong>strained by walls) and is not to council’s satisfacti<strong>on</strong> under Clause 52.06-2 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><strong>Darebin</strong> Planning Scheme. Based up<strong>on</strong> AS/NZS 2890.1:2004 Off Street Car Parking if <str<strong>on</strong>g>the</str<strong>on</strong>g>applicati<strong>on</strong> were supported car spaces for <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house should be a minimum 3mwide and car spaces for <str<strong>on</strong>g>the</str<strong>on</strong>g> for <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility should be a minimum 2.8m wide toallow access by residents and customers / staff <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility. The proposed carspaces are insufficient in dimensi<strong>on</strong> and will result in <str<strong>on</strong>g>the</str<strong>on</strong>g> underutilisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed carparking.Existing Use RightsPursuant to Clause 63 an existing secti<strong>on</strong> 2 use may c<strong>on</strong>tinue provided:- No buildings or works are c<strong>on</strong>structed or carried out without a permit. A permit mustnot be granted unless <str<strong>on</strong>g>the</str<strong>on</strong>g> buildings and works complies with any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r building orworks requirement in this scheme.- Any c<strong>on</strong>diti<strong>on</strong> or restricti<strong>on</strong> to which <str<strong>on</strong>g>the</str<strong>on</strong>g> use was subject c<strong>on</strong>tinues to be met. Thisincludes an implied restricti<strong>on</strong> <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> extent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing use rightor <str<strong>on</strong>g>the</str<strong>on</strong>g> extent <str<strong>on</strong>g>of</str<strong>on</strong>g> activities within <str<strong>on</strong>g>the</str<strong>on</strong>g> use.- The amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area is not damaged or fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r damaged by a change in <str<strong>on</strong>g>the</str<strong>on</strong>g>activities bey<strong>on</strong>d <str<strong>on</strong>g>the</str<strong>on</strong>g> limited purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> use preserved by <str<strong>on</strong>g>the</str<strong>on</strong>g> existing use right.As noted under <str<strong>on</strong>g>the</str<strong>on</strong>g> car parking assessment <str<strong>on</strong>g>the</str<strong>on</strong>g> car parking provisi<strong>on</strong> associated with <str<strong>on</strong>g>the</str<strong>on</strong>g>self storage facility comprises a restricti<strong>on</strong> <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> use. The proposed reducti<strong>on</strong> in carparking by two (2) car spaces combined with <str<strong>on</strong>g>the</str<strong>on</strong>g> inadequate dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposedcar spaces will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> area. Also as outlined in <str<strong>on</strong>g>the</str<strong>on</strong>g> report above andPage 16


PLANNING COMMITTEE MINUTES 25 JULY 2011<str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal does not comply with all scheme requirements that canreas<strong>on</strong>ably be met. The proposal is not in accordance with Clause 63.05 and Clause 63.12<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning SchemeLoading and UnloadingThe land has existing use rights for a self storage facility and loading and unloading facilitieshave never been specified <strong>on</strong> Lot 3 / for <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site as a self storage facility as part <str<strong>on</strong>g>of</str<strong>on</strong>g>any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> permits issued previously to <str<strong>on</strong>g>the</str<strong>on</strong>g> land. Clause 52.07 Loading and Unloading OfVehicles <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme specifies that no building or works may bec<strong>on</strong>structed for <str<strong>on</strong>g>the</str<strong>on</strong>g> manufacture, servicing, storage or sale <str<strong>on</strong>g>of</str<strong>on</strong>g> goods or materials unlessspace is provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for loading and unloading vehicles in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> tableattached to Clause 52.07. The proposed buildings and works are a caretaker’s house andare not for <str<strong>on</strong>g>the</str<strong>on</strong>g> storage <str<strong>on</strong>g>of</str<strong>on</strong>g> goods or materials. C<strong>on</strong>sequently <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal cannot be requiredto provide loading and unloading facilities. Plans submitted informally <strong>on</strong> 18 May 2011 showa loading bay measuring 4.2m by 6.2m. This loading bay accords with <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer inspecti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> site. If <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported <str<strong>on</strong>g>the</str<strong>on</strong>g> loading bay should be shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsedplan.Amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed Caretaker’s HouseClause 55.05 On Site Amenities and Facilities does not apply to a caretaker’s house in anIndustrial 3 Z<strong>on</strong>e, however it provides appropriate assessment measures for <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’shouse.Standard B25: AccessibilityHaving regard to <str<strong>on</strong>g>the</str<strong>on</strong>g> stair access required to all parts <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house <str<strong>on</strong>g>the</str<strong>on</strong>g> proposedcaretaker’s house can not be made accessible for people with limited mobility byc<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a ramp, if required. This is not a significant issue.Standard B26: Dwelling EntryThe caretaker’s house entry is <str<strong>on</strong>g>of</str<strong>on</strong>g>f Albert Street which does not have a footpath (see safetyabove) and provides a poor sense <str<strong>on</strong>g>of</str<strong>on</strong>g> address.Standard B27: Daylight to New WindowsAdequate daylight will be available to <str<strong>on</strong>g>the</str<strong>on</strong>g> windows in <str<strong>on</strong>g>the</str<strong>on</strong>g> new development.All new habitable room windows within <str<strong>on</strong>g>the</str<strong>on</strong>g> development will be located to face an outdoorarea <str<strong>on</strong>g>of</str<strong>on</strong>g> at least 3.0 square metres with a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.0m clear to <str<strong>on</strong>g>the</str<strong>on</strong>g> sky.Standard B28: Private Open SpaceThe development provides adequate private open space (pos) for <str<strong>on</strong>g>the</str<strong>on</strong>g> reas<strong>on</strong>able recreati<strong>on</strong>and service needs <str<strong>on</strong>g>of</str<strong>on</strong>g> residents with 19.6 square metres private open space accessible fromliving areasAll secluded private open space areas have direct access to a living room.Standard B29: Solar Access to Open SpaceSolar access is provided into <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> new caretaker’s house.Page 17


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B30: StorageAdequate storage facilities are provided for <str<strong>on</strong>g>the</str<strong>on</strong>g> caretaker’s house.Standard B33: Comm<strong>on</strong> PropertyThe public, communal and private areas within <str<strong>on</strong>g>the</str<strong>on</strong>g> development are not clearly delineated.The comm<strong>on</strong> property is not functi<strong>on</strong>al and not capable <str<strong>on</strong>g>of</str<strong>on</strong>g> efficient management.Standard B34: Site ServicesSufficient area is provided to allow for <str<strong>on</strong>g>the</str<strong>on</strong>g> installati<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> maintenance <str<strong>on</strong>g>of</str<strong>on</strong>g> site services. If<str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> were supported a c<strong>on</strong>diti<strong>on</strong> would be required to provide a post box sharedwith <str<strong>on</strong>g>the</str<strong>on</strong>g> self storage facility.POLICY IMPLICATIONSEnvir<strong>on</strong>mental SustainabilityAll new dwellings are required to achieve a minimum six (6) star energy rating under <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant building c<strong>on</strong>trols.Social Inclusi<strong>on</strong> and DiversityNil.O<str<strong>on</strong>g>the</str<strong>on</strong>g>rNil.FINANCIAL AND RESOURCE IMPLICATIONSThere are no financial or resource implicati<strong>on</strong>s as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> determinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thisapplicati<strong>on</strong>.FUTURE ACTIONSNil.DISCLOSURE OF INTERESTSSecti<strong>on</strong> 80C <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Local Government Act 1989 requires members <str<strong>on</strong>g>of</str<strong>on</strong>g> Council staff andpers<strong>on</strong>s engaged under c<strong>on</strong>tract to provide advice to Council to disclose any direct orindirect interest in a matter to which <str<strong>on</strong>g>the</str<strong>on</strong>g> advice relates.The Manager authorising this report, having made enquiries with relevant members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,reports that no disclosable interests have been raised in relati<strong>on</strong> to this report.Page 18


PLANNING COMMITTEE MINUTES 25 JULY 2011RELATED DOCUMENTS<strong>Darebin</strong> Planning Scheme and <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act (1987) as amended.(Cr. Tsitas entered <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> during discussi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> above item – 5.35pm)COMMITTEE DECISIONMOVED:SECONDED:Cr. T. LaurenceCr. G. GrecoTHAT Planning Permit Applicati<strong>on</strong> D/194/2011 be refused and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g>Refusal be issued <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> following grounds:1. The proposed building's height and setbacks result in unreas<strong>on</strong>able levels<str<strong>on</strong>g>of</str<strong>on</strong>g> visual bulk and loss <str<strong>on</strong>g>of</str<strong>on</strong>g> daylight to <str<strong>on</strong>g>the</str<strong>on</strong>g> adjacent studio / caretaker’shouse at 7 Westfield Street (west), impacting detrimentally up<strong>on</strong> itsamenity.2. The proposed building will overlook <str<strong>on</strong>g>the</str<strong>on</strong>g> habitable room windows <str<strong>on</strong>g>of</str<strong>on</strong>g> itswestern and nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn residential abuttals, impacting detrimentally up<strong>on</strong><str<strong>on</strong>g>the</str<strong>on</strong>g>ir amenity.3. Pedestrian access from Albert Street provides a poor design resp<strong>on</strong>sefor pers<strong>on</strong>s accessing <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house c<strong>on</strong>trary to Clause15.01-4 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.4. The proposed building does not provide for effective pedestrianmovement in or around <str<strong>on</strong>g>the</str<strong>on</strong>g> parking area, with all car spaces in <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>astcorner c<strong>on</strong>strained by walls which will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> property and <strong>on</strong>-street car parking in<str<strong>on</strong>g>the</str<strong>on</strong>g> area, c<strong>on</strong>trary to Clause 52.06-2 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.5. The proposed caretaker’s house is not sufficiently integrated with<str<strong>on</strong>g>the</str<strong>on</strong>g> existing self storage use, as it will be separated from that use, will belocated partly <strong>on</strong> comm<strong>on</strong> property, provides little to no surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> existing use and is inc<strong>on</strong>sistent with Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme.6. The size <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house undermines <str<strong>on</strong>g>the</str<strong>on</strong>g> purposes<str<strong>on</strong>g>of</str<strong>on</strong>g> industrial z<strong>on</strong>ed land and is inc<strong>on</strong>sistent with Clause 17.02, Clause21.05-5, Clause 22.07 and Clause 33.03 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.7. The design, materials and articulati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed building isinc<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area and c<strong>on</strong>trary to Clause 15.01-1and Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.8. The proposed reducti<strong>on</strong> in car parking will impact detrimentally up<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> locality and is inc<strong>on</strong>sistent with Clause 52.06 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme, providing insufficient car parking for <str<strong>on</strong>g>the</str<strong>on</strong>g> existing selfstorage use and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed caretaker’s house.9. The proposal provides insufficient landscaping opportunities and isinc<strong>on</strong>sistent with Clause 15.01-5 and Clause 22.07 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> PlanningScheme.Page 19


PLANNING COMMITTEE MINUTES 25 JULY 201110. The proposal is not in accordance with Clause 63.05 and Clause 63.12 <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.CARRIEDPage 20


PLANNING COMMITTEE MINUTES 25 JULY 20115.2 APPLICATION FOR PLANNING PERMIT D/238/201112 Mihil Street, Prest<strong>on</strong>AUTHOR:DIRECTOR:Principal Planner – Gavin CrawfordDirector <strong>City</strong> Works and Development – Michael BallockOWNER/APPLICANT/CONSULTANT:Applicant:E Savag, c/o Ik<strong>on</strong>omidis Reid Pty Ltd663 Plenty RdRESERVOIR VIC 3073Owner:Kialla Investments Pty Ltd46A Roslyn StBRIGHTON VIC 3186C<strong>on</strong>sultant:Ik<strong>on</strong>omidis ReidSUMMARY:• It is proposed to c<strong>on</strong>struct a medium density housing development comprising four (4)two (2) bedroom dwellings. Dwellings 1 to 3 are three (3) two (2) storey with reverseliving and a first floor balc<strong>on</strong>y <str<strong>on</strong>g>of</str<strong>on</strong>g> 10.6 square metres to 12.7 square metres and aground floor service yard <str<strong>on</strong>g>of</str<strong>on</strong>g> 12 square metres to 12.5 square metres. Dwelling 4 issingle storey with 66.5 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space. Each dwellinghas <strong>on</strong>e covered car space.• A restrictive covenant is registered <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title. The covenant prohibits<str<strong>on</strong>g>the</str<strong>on</strong>g> carrying away or removal <str<strong>on</strong>g>of</str<strong>on</strong>g> earth, clay, gravel, or sand from <str<strong>on</strong>g>the</str<strong>on</strong>g> land except for <str<strong>on</strong>g>the</str<strong>on</strong>g>excavati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> foundati<strong>on</strong>s for any building or use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for manufacture or wining<str<strong>on</strong>g>of</str<strong>on</strong>g> bricks, tiles or pottery ware. The proposal does not c<strong>on</strong>travene <str<strong>on</strong>g>the</str<strong>on</strong>g> covenant.• Recommendati<strong>on</strong> – Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> to Grant a Planning Permit subject toc<strong>on</strong>diti<strong>on</strong>s.CONSULTATION:• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> was given by posting a sign <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land and mailing <str<strong>on</strong>g>of</str<strong>on</strong>g> noticesto affected properties. After amendment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> plans under S57A notice was given bymailing <str<strong>on</strong>g>of</str<strong>on</strong>g> notices to adjacent properties• Seven (7) objecti<strong>on</strong>s were received against <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong>.• A c<strong>on</strong>sultative <str<strong>on</strong>g>meeting</str<strong>on</strong>g> has not been <str<strong>on</strong>g>held</str<strong>on</strong>g>.• The applicati<strong>on</strong> has been referred internally to:- Capital works Branch – No objecti<strong>on</strong> subject to c<strong>on</strong>diti<strong>on</strong>s.- Council Arborist – Provide a 2m Tree Protecti<strong>on</strong> Z<strong>on</strong>e from <str<strong>on</strong>g>the</str<strong>on</strong>g> street tree.Page 21


PLANNING COMMITTEE MINUTES 25 JULY 2011RECOMMENDATIONTHAT Planning Permit Applicati<strong>on</strong> D/238/2011 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> toGrant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. Theplans must be drawn to scale with dimensi<strong>on</strong>s and must be generally in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> (identified as: TP03 C, TP04 C Job No005731 prepared by Ik<strong>on</strong>omidis Reid, dated June 2011) but modified to show:a) Wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile cladding incorporated to upper floor facades.b) All first floor balc<strong>on</strong>y screening a maximum 25% permeable to 1.7m abovefinished floor level.c) All first floor obscure glazing fixed to 1.7m above finished floor level.d) The Dwelling 2 first floor ro<str<strong>on</strong>g>of</str<strong>on</strong>g> with a hipped or skilli<strong>on</strong> form (to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> firstfloor south wall height) and <str<strong>on</strong>g>the</str<strong>on</strong>g> south boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Dwelling 1 balc<strong>on</strong>y setback from <str<strong>on</strong>g>the</str<strong>on</strong>g> first floor Dwelling 2 living room south wall in accordance withStandard B29 <str<strong>on</strong>g>of</str<strong>on</strong>g> Clause 55 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.e) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> all plant and equipment (including air c<strong>on</strong>diti<strong>on</strong>ers and <str<strong>on</strong>g>the</str<strong>on</strong>g> like).These are to be co-located where possible, screened to as not to be visible from<str<strong>on</strong>g>the</str<strong>on</strong>g> public realm and adjacent properties, located as far as practicable from siteboundaries and integrated into <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> buildings.f) Annotati<strong>on</strong>s detailing a Tree Protecti<strong>on</strong> Z<strong>on</strong>e and associated Tree Protecti<strong>on</strong>Fence with a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2 metres (measured from <str<strong>on</strong>g>the</str<strong>on</strong>g> outside edge <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk) <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip tree fr<strong>on</strong>ting Mihil Street, in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g>C<strong>on</strong>diti<strong>on</strong> 8 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. A notati<strong>on</strong> must be added to state that any works in<str<strong>on</strong>g>the</str<strong>on</strong>g> Tree Protecti<strong>on</strong> Z<strong>on</strong>e must be carried out without excavati<strong>on</strong>, no storage <str<strong>on</strong>g>of</str<strong>on</strong>g>materials and no access during c<strong>on</strong>structi<strong>on</strong>.g) A Landscape Plan in accordance with C<strong>on</strong>diti<strong>on</strong> No.2 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.2. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan is approved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>nform part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. The Landscape Plan must be prepared by a suitably qualifiedpers<strong>on</strong> and must incorporate:a) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to be removed,including overhanging trees <strong>on</strong> adjoining properties. The genus, species, heightand spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specified.b) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanical name,comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plants.c) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds and hard paving(such as asphalt, c<strong>on</strong>crete, brick or gravel).d) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> property.e) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbage binreceptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etc.Page 22


PLANNING COMMITTEE MINUTES 25 JULY 2011f) Edge treatment between grass (lawn) and garden beds.g) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings <strong>on</strong> adjoiningland, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows and doors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject sitemust also be shown.h) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead and underground services.C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed planting must beavoided.i) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbers.j) A scale, North Point and appropriate legend.k) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> tree protecti<strong>on</strong> measures for <str<strong>on</strong>g>the</str<strong>on</strong>g> street tree located adjacent <str<strong>on</strong>g>the</str<strong>on</strong>g>proposed vehicle crossing.l) Annotati<strong>on</strong>s detailing a Tree Protecti<strong>on</strong> Z<strong>on</strong>e and associated Tree Protecti<strong>on</strong>Fence with a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2 metres (measured from <str<strong>on</strong>g>the</str<strong>on</strong>g> outside edge <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk) <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip tree fr<strong>on</strong>ting Mihil Street, in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g>C<strong>on</strong>diti<strong>on</strong> 8 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. A notati<strong>on</strong> must be added to state that any works in<str<strong>on</strong>g>the</str<strong>on</strong>g> Tree Protecti<strong>on</strong> Z<strong>on</strong>e must be carried out without excavati<strong>on</strong>, no storage <str<strong>on</strong>g>of</str<strong>on</strong>g>materials and no access during c<strong>on</strong>structi<strong>on</strong>.The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.3. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be altered without <str<strong>on</strong>g>the</str<strong>on</strong>g>prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.4. This Permit will expire if:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> thisPermit; or• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request is made inwriting before this Permit expires or within three (3) m<strong>on</strong>ths after <str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.5. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any works authorised by thispermit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong> Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>development levy for each charge unit must be calculated in accordance with Schedule1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong> Plan Overlay.6. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be completed to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied and/or<str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as is approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority inwriting.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g> permit holdermust advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping has been completed.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be maintained, andany dead, diseased or damaged plant replaced in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsedLandscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Page 23


PLANNING COMMITTEE MINUTES 25 JULY 20118. Before buildings and works (including demoliti<strong>on</strong>) start, a tree protecti<strong>on</strong> fence must beerected around street tree <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip fr<strong>on</strong>ting Mihil Street, at a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.5metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> base <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk to define a ‘tree protecti<strong>on</strong> z<strong>on</strong>e’.This fence must be c<strong>on</strong>structed <str<strong>on</strong>g>of</str<strong>on</strong>g> star pickets and chain mesh (or similar) to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.The tree protecti<strong>on</strong> fence must remain in place until c<strong>on</strong>structi<strong>on</strong> is completed.No vehicular or pedestrian access, trenching or soil excavati<strong>on</strong> is to occur within <str<strong>on</strong>g>the</str<strong>on</strong>g>tree protecti<strong>on</strong> z<strong>on</strong>e.No storage or dumping <str<strong>on</strong>g>of</str<strong>on</strong>g> tools, equipment or waste is to occur within <str<strong>on</strong>g>the</str<strong>on</strong>g> treeprotecti<strong>on</strong> z<strong>on</strong>e.The ground surface <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> tree protecti<strong>on</strong> z<strong>on</strong>e must be covered by a protective100mm deep layer <str<strong>on</strong>g>of</str<strong>on</strong>g> mulch prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> development commencing and be wateredregularly to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.9. The c<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Act 1993and <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Regulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong> must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a reportfrom a licensed land surveyor and must be submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority nolater than 7 days from <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels mustbe c<strong>on</strong>firmed before a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensedland surveyor submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. All dwellings that share dividing walls and/or floors must be c<strong>on</strong>structed to limit noisetransmissi<strong>on</strong> in accordance with Part F(5) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.11. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting system capable <str<strong>on</strong>g>of</str<strong>on</strong>g>illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage and car parking space andall pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.The external lighting must be designed, baffled and/or located to ensure that no loss <str<strong>on</strong>g>of</str<strong>on</strong>g>amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority.12. Boundary walls facing adjoining properties must be cleaned and finished to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.14. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes, fixtures, fittingsand vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must be c<strong>on</strong>cealed in service ducts oro<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.15. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than those shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> priorwritten c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles for newspapers to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.17. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g> vehicles andaccess lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>plans;Page 24


PLANNING COMMITTEE MINUTES 25 JULY 2011c) Surfaced with an all wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r sealcoat; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not beused for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.REPORTINTRODUCTION AND BACKGROUNDNo relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> history.ISSUES AND DISCUSSIONSubject site and surrounding area• The land measures 15.85m wide by 45.72m deep with and area <str<strong>on</strong>g>of</str<strong>on</strong>g> 724 square metres.• The land is z<strong>on</strong>ed Residential 1 and affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> development c<strong>on</strong>tributi<strong>on</strong>s planoverlay.• The land is located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north side <str<strong>on</strong>g>of</str<strong>on</strong>g> Mihil Street.• The land is occupied by a single storey detached wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard and tile dwelling withan existing crossover to <str<strong>on</strong>g>the</str<strong>on</strong>g> east <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage and a carport and sundry outbuildingsto <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.• Dwellings in <str<strong>on</strong>g>the</str<strong>on</strong>g> street a typically single storey wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard and cream brick and tiledetached dwellings.• To <str<strong>on</strong>g>the</str<strong>on</strong>g> north are <str<strong>on</strong>g>the</str<strong>on</strong>g> rear yard areas <str<strong>on</strong>g>of</str<strong>on</strong>g> dwellings fr<strong>on</strong>ting Breffna Street.• To <str<strong>on</strong>g>the</str<strong>on</strong>g> south, <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> opposite side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> street, are a number <str<strong>on</strong>g>of</str<strong>on</strong>g> single storeywea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard and brick dwellings.• The adjoining property to <str<strong>on</strong>g>the</str<strong>on</strong>g> east is occupied by a single storey, wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboarddwelling with secluded private open space and outbuildings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.• To <str<strong>on</strong>g>the</str<strong>on</strong>g> west is a single storey wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard dwelling with vehicle and an outbuilding in<str<strong>on</strong>g>the</str<strong>on</strong>g> rear yard area, adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary. This site is used as a c<strong>on</strong>vent.• Bus Route 251 operates al<strong>on</strong>g Victoria Road 130m to <str<strong>on</strong>g>the</str<strong>on</strong>g> east. HLT Oult<strong>on</strong> Reserve islocated 400m to <str<strong>on</strong>g>the</str<strong>on</strong>g> east, with a smaller reserve 240m to <str<strong>on</strong>g>the</str<strong>on</strong>g> east.Proposal• It is proposed to c<strong>on</strong>struct a medium density housing development comprising four (4)two (2) bedroom dwellings.• Dwellings 1 to 3 are located to <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t and are two (2) storey with reverse living and afirst floor balc<strong>on</strong>y <str<strong>on</strong>g>of</str<strong>on</strong>g> 10.6 square metres to 12.7 square metres and a ground floorservice yard <str<strong>on</strong>g>of</str<strong>on</strong>g> 12 square metres to 12.5 square metres.• Dwelling 4 is located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear and is single storey with 66.5 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g>secluded private open space. Each dwelling has <strong>on</strong>e (1) covered car space.Page 25


PLANNING COMMITTEE MINUTES 25 JULY 2011Subsequent to <str<strong>on</strong>g>the</str<strong>on</strong>g> notificati<strong>on</strong> period, <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant formally submitted amending plans underS57A <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme, which increase <str<strong>on</strong>g>the</str<strong>on</strong>g> west side setbacks to Dwellings2 and 3 to 2m and relocate balc<strong>on</strong>ies to <str<strong>on</strong>g>the</str<strong>on</strong>g> north. These plans have been subject t<strong>on</strong>otificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> affected properties and are <str<strong>on</strong>g>the</str<strong>on</strong>g> plans up<strong>on</strong> which this assessment is made.OBJECTIONS• 7 Objecti<strong>on</strong>s received.Objecti<strong>on</strong>s summarised• Impacts up<strong>on</strong> streetscape character / medium density housing incompatible with area /Changed character <str<strong>on</strong>g>of</str<strong>on</strong>g> street for single dwellings.• Parking impacts.• Increased traffic and safety issues / narrow street will restrict vehicle movement.• Noise impacts.• Impacts up<strong>on</strong> operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>vent to <str<strong>on</strong>g>the</str<strong>on</strong>g> west.• Visual bulk impacts / loss <str<strong>on</strong>g>of</str<strong>on</strong>g> view.• Overshadowing.• Overlooking.• Poor quality design and materials inc<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area / cheapdwellings and poor quality materials.• Undesirable precedent.• Impact up<strong>on</strong> property values.• C<strong>on</strong>trary to landscape character.Officer comment <strong>on</strong> summarised objecti<strong>on</strong>s• Neighbourhood Character is assessed in <str<strong>on</strong>g>the</str<strong>on</strong>g> body <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> report under Clause 22.04and Clause 55. N<strong>on</strong>e<str<strong>on</strong>g>the</str<strong>on</strong>g>less it is noted that <str<strong>on</strong>g>the</str<strong>on</strong>g> State and Local Planning Policyencourages appropriate medium density housing in well serviced areas such as this.As a result <str<strong>on</strong>g>the</str<strong>on</strong>g> appearance <str<strong>on</strong>g>of</str<strong>on</strong>g> streets will change. Whilst <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> Mihil Streetis predominantly single storey dwellings, <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed two (2) storey dwellings havebeen designed to have minimal impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape with <str<strong>on</strong>g>the</str<strong>on</strong>g> upper floor <str<strong>on</strong>g>of</str<strong>on</strong>g>Dwelling 1 being recessed slightly from <str<strong>on</strong>g>the</str<strong>on</strong>g> street.• Car parking has been provided <strong>on</strong> site in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> Clause55.• The street is an adequate width to allow through traffic. The development will notimpact unreas<strong>on</strong>ably <strong>on</strong> through traffic and <str<strong>on</strong>g>the</str<strong>on</strong>g> traffic movements to and from <str<strong>on</strong>g>the</str<strong>on</strong>g> sitewill not be <str<strong>on</strong>g>of</str<strong>on</strong>g> a significant volume to impact <strong>on</strong> existing c<strong>on</strong>diti<strong>on</strong>s and should notcreate safety issues.• The proposed use is residential and will have noise impacts c<strong>on</strong>sistent with thosenormal to a residential z<strong>on</strong>e, unlike a commercial or an industrial use which wouldcreate noise impacts that are not normal to a residential z<strong>on</strong>e. Speech, laughter,music etc. are noises associated with residential uses and are generally not aPage 26


PLANNING COMMITTEE MINUTES 25 JULY 2011relevant c<strong>on</strong>siderati<strong>on</strong> in assessing medium density development. The developmentintensity will not lead to an unreas<strong>on</strong>able noise impact.• The use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for dwellings is as <str<strong>on</strong>g>of</str<strong>on</strong>g> right in <str<strong>on</strong>g>the</str<strong>on</strong>g> Residential 1 Z<strong>on</strong>e and cannotbe assessed. There is no indicati<strong>on</strong> that <str<strong>on</strong>g>the</str<strong>on</strong>g> development will impact unreas<strong>on</strong>ably <strong>on</strong><str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining c<strong>on</strong>vent (dwelling) use, any more than it would impact <strong>on</strong> any o<str<strong>on</strong>g>the</str<strong>on</strong>g>rdwelling use.• It is a well recognised <str<strong>on</strong>g>planning</str<strong>on</strong>g> principle that <str<strong>on</strong>g>the</str<strong>on</strong>g>re is no right to a view and that overtime views change. However it is recognised that bulk and heights may have anadverse effect <strong>on</strong> aspect and amenity. These are assessed below.• Although amenity may be affected (overlooking, overshadowing, noise, etc) by <str<strong>on</strong>g>the</str<strong>on</strong>g>development, an assessment under Clause 55 provides an indicator as to whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r<str<strong>on</strong>g>the</str<strong>on</strong>g>se effects are unreas<strong>on</strong>able or not. In this instance <str<strong>on</strong>g>the</str<strong>on</strong>g> development will not havean unreas<strong>on</strong>able impact and is <str<strong>on</strong>g>the</str<strong>on</strong>g>refore acceptable.• The materials and design are assessed in <str<strong>on</strong>g>the</str<strong>on</strong>g> body <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> report under Clause 22.04and Clause 55. The proposal provides smaller dwellings <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site, which providessome dwelling diversity and affordability in an area able to accommodate an increasein density. In this respect it complies with urban c<strong>on</strong>solidati<strong>on</strong> policy.• It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> development will not create an undesirable precedent, aseach proposal is assessed <strong>on</strong> its merits in <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>text <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhoodcharacter.• Impacts up<strong>on</strong> property values are speculative and are not a relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g>c<strong>on</strong>siderati<strong>on</strong>.PLANNING ASSESSMENTCLAUSE 22.04 NEIGHBOURHOOD CHARACTER POLICY ASSESSMENTVEGETATIONCommentNo significant trees are located <strong>on</strong> site. It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an open fr<strong>on</strong>tgarden and a comprehensive landscape design will maintain <str<strong>on</strong>g>the</str<strong>on</strong>g> garden character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>site. There are opportunities for landscaping through <str<strong>on</strong>g>the</str<strong>on</strong>g> site. A landscape plan is requestedas a c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> approval.Complies subject to a c<strong>on</strong>diti<strong>on</strong>SITINGCommentThe proposal provides appropriate landscaping opportunities through <str<strong>on</strong>g>the</str<strong>on</strong>g> site, includingwithin <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t setback, to respect <str<strong>on</strong>g>the</str<strong>on</strong>g> garden setting <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site and adjacent propertiesparticularly with increased side setbacks to Dwellings 2 and 3.Dwelling 1 is setback from both side boundaries to present a detached dwelling to <str<strong>on</strong>g>the</str<strong>on</strong>g> streetreflecting <str<strong>on</strong>g>the</str<strong>on</strong>g> rhythm <str<strong>on</strong>g>of</str<strong>on</strong>g> dwelling spacing in <str<strong>on</strong>g>the</str<strong>on</strong>g> area. The fr<strong>on</strong>t dwelling provides a fr<strong>on</strong>tsetback <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.6m which represents an appropriate transiti<strong>on</strong> between neighbouring fr<strong>on</strong>tsetbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.6m and 7.7m. Car parking structures are located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> dwellings andPage 27


PLANNING COMMITTEE MINUTES 25 JULY 2011will not dominate <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape. The proposal allows sufficient side and rear garden spacefor landscapingAlthough Dwelling 4 is c<strong>on</strong>structed to <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary, this is acceptable as it is at <str<strong>on</strong>g>the</str<strong>on</strong>g> rear anddoes not impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape view. Therefore <str<strong>on</strong>g>the</str<strong>on</strong>g> side setbacks accord with <str<strong>on</strong>g>the</str<strong>on</strong>g>predominant setbacks in <str<strong>on</strong>g>the</str<strong>on</strong>g> area, maintaining <str<strong>on</strong>g>the</str<strong>on</strong>g> rhythm <str<strong>on</strong>g>of</str<strong>on</strong>g> dwelling spacing within <str<strong>on</strong>g>the</str<strong>on</strong>g>streetscape.The garages are located behind <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t dwelling line. Only <strong>on</strong>e (1) crossover is provided,which minimises paving in fr<strong>on</strong>t garden areas. Car parking structures do not dominate <str<strong>on</strong>g>the</str<strong>on</strong>g>façade or view <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling.CompliesHEIGHT AND BUILDING FORM / FRONTAGE WIDTHCommentThe predominant height <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings in <str<strong>on</strong>g>the</str<strong>on</strong>g> street is single storey. The proposeddevelopment includes two (2) storey dwellings. The dwellings have been largely designed tominimise bulk, with first floors smaller than <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor envelope and setting <str<strong>on</strong>g>the</str<strong>on</strong>g> upperfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> Dwelling 1 back from <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling. Although <str<strong>on</strong>g>the</str<strong>on</strong>g> upper floor is not setback <strong>on</strong>e (1) room from <str<strong>on</strong>g>the</str<strong>on</strong>g> façade, it is set back adequately from <str<strong>on</strong>g>the</str<strong>on</strong>g> façade and fr<strong>on</strong>tporch, so that <str<strong>on</strong>g>the</str<strong>on</strong>g> single storey streetscape façade is maintained. The design includessetbacks at <str<strong>on</strong>g>the</str<strong>on</strong>g> upper floor levels to provide articulati<strong>on</strong> and separati<strong>on</strong>. It is also noted that<str<strong>on</strong>g>the</str<strong>on</strong>g> rear dwelling is single storey, thus appropriately addressing <str<strong>on</strong>g>the</str<strong>on</strong>g> lower scale rear yardgarden character.The maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is approximately 7.1m (Dwellings 1 and 2 <strong>on</strong>ly) andis acceptable. Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rmore <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is adequately articulated through variable setbacksand a mix <str<strong>on</strong>g>of</str<strong>on</strong>g> materials to provide a transiti<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> site and adjacent single storeydwellings.The development is not out <str<strong>on</strong>g>of</str<strong>on</strong>g> scale with <str<strong>on</strong>g>the</str<strong>on</strong>g> nearby buildings and does not dominate <str<strong>on</strong>g>the</str<strong>on</strong>g>streetscape, as it presents a graduated increase in height over adjoining single storeybuildings.CompliesFRONT BOUNDARY TREATMENTCommentNo fr<strong>on</strong>t fence is proposed which is c<strong>on</strong>sistent with neighbouring <str<strong>on</strong>g>the</str<strong>on</strong>g>mes.CompliesCLAUSE 55 ASSESSMENTStandard B1 Neighbourhood Character• This element has been c<strong>on</strong>sidered above in <str<strong>on</strong>g>the</str<strong>on</strong>g> Neighbourhood Character PolicyAssessment. Although <str<strong>on</strong>g>the</str<strong>on</strong>g> development provides two (2) storey dwellings extendinginto <str<strong>on</strong>g>the</str<strong>on</strong>g> site, <str<strong>on</strong>g>the</str<strong>on</strong>g> rear dwelling is single storey, thus providing an appropriate transiti<strong>on</strong>to <str<strong>on</strong>g>the</str<strong>on</strong>g> lower scale rear yard character. Additi<strong>on</strong>ally, it is important to note that <str<strong>on</strong>g>the</str<strong>on</strong>g>design provides significant breaks between buildings at upper floor level, as well asample setbacks to <str<strong>on</strong>g>the</str<strong>on</strong>g> side boundaries to address visual bulk.Page 28


PLANNING COMMITTEE MINUTES 25 JULY 2011Complies subject to c<strong>on</strong>diti<strong>on</strong>sStandard B2 Residential Policy• The proposal is accompanied by an acceptable written statement and designresp<strong>on</strong>se.• The proposal generally complies with <str<strong>on</strong>g>the</str<strong>on</strong>g> State Planning Policy Framework, <str<strong>on</strong>g>the</str<strong>on</strong>g> LocalPlanning Policy Framework including Council’s Municipal Strategic Statement and local<str<strong>on</strong>g>planning</str<strong>on</strong>g> policies.• The development fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rs <strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> key objectives <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Residential 1 Z<strong>on</strong>e - toprovide for residential development at a range <str<strong>on</strong>g>of</str<strong>on</strong>g> densities with a variety <str<strong>on</strong>g>of</str<strong>on</strong>g> dwellings tomeet <str<strong>on</strong>g>the</str<strong>on</strong>g> housing needs <str<strong>on</strong>g>of</str<strong>on</strong>g> all households.CompliesStandard B3 Dwelling diversity• N/A (This standard applies to developments <str<strong>on</strong>g>of</str<strong>on</strong>g> 10 or more dwellings and is notapplicable to <str<strong>on</strong>g>the</str<strong>on</strong>g> subject applicati<strong>on</strong>).Standard B4 Infrastructure• The development is to be located in an established area where <str<strong>on</strong>g>the</str<strong>on</strong>g>re is adequateinfrastructure. The proposal will not exceed <str<strong>on</strong>g>the</str<strong>on</strong>g> capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> local infrastructure.• Council’s Capital Works Unit has commented that drainage is available to <str<strong>on</strong>g>the</str<strong>on</strong>g> siteand is subject to c<strong>on</strong>diti<strong>on</strong>s.Complies subject to a c<strong>on</strong>diti<strong>on</strong>Standard B5 Integrati<strong>on</strong> with <str<strong>on</strong>g>the</str<strong>on</strong>g> street• Dwelling 1 fr<strong>on</strong>ts Mihil Street.• No fr<strong>on</strong>t fence is proposed which maintains open views <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t garden.• The site does not adjoin any public land.CompliesStandard B6 Street setback• The standard <str<strong>on</strong>g>the</str<strong>on</strong>g>refore requires a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.65m (average distance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> abuttingallotments). The proposed fr<strong>on</strong>t setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.65m meets <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.CompliesStandard B7 Building height• The maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings is approximately 7.1m (Dwellings 1and 2 <strong>on</strong>ly) where a maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 9m is allowed under this standard.CompliesStandard B8 Site coverage• Site coverage is 43% where 60% site coverage is allowed this standardCompliesPage 29


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B9 Permeability• Permeability is 29% where a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 20% is required under this standard.CompliesStandard B10 Energy efficiency• The proposal is c<strong>on</strong>sidered to be generally energy efficient due to <str<strong>on</strong>g>the</str<strong>on</strong>g> following:• Cross ventilati<strong>on</strong> is available in <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> units.• The development does not unreas<strong>on</strong>ably affect <str<strong>on</strong>g>the</str<strong>on</strong>g> solar access and energy efficiency<str<strong>on</strong>g>of</str<strong>on</strong>g> neighbouring dwellings.• Open space and/or living areas with access to north light.• Space for outdoor clo<str<strong>on</strong>g>the</str<strong>on</strong>g>s drying facilities are provided.• It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> development is broadly energy efficient. The development willalso be required to achieve a 5 star energy rating pursuant to building c<strong>on</strong>trols.CompliesStandard B11 Open space• N/A (The site is not adjacent to any areas <str<strong>on</strong>g>of</str<strong>on</strong>g> public or communal open space).Standard B12 Safety• The entrances to <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings are adequately visible from Mihil Street and<str<strong>on</strong>g>the</str<strong>on</strong>g> internal access way. The private open space areas are unable to be used aspublic thoroughfares.CompliesStandard B13 Landscaping• The surrounding landscape character is generally semi mature and informal withlarge open spaces and spacious setbacks.• The open spaces and setbacks are generally large enough to provide sufficientlandscaping.• A landscape plan is requested as a c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> approval.Complies subject to c<strong>on</strong>diti<strong>on</strong>Standard B14 Access• The internal access way is 3m wide and provides sufficient space for parking andmanoeuvring. Vehicles can enter and exit <str<strong>on</strong>g>the</str<strong>on</strong>g> site in a forwards directi<strong>on</strong>.CompliesStandard B15 Parking locati<strong>on</strong>• Parking facilities are in proximity to dwellings.• The proposed garages are an adequately secure form <str<strong>on</strong>g>of</str<strong>on</strong>g> parking.• The access is observable.CompliesPage 30


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B16 Parking provisi<strong>on</strong>• The dwellings provide two (2) bedrooms and access to <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>on</strong>e (1) car space.Dwelling 1 has a study with dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.5m x 2.1m, and is <str<strong>on</strong>g>the</str<strong>on</strong>g>refore unlikely tobe used as a bedroom, given its minimal size.• The garage dimensi<strong>on</strong>s comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.• Access to <str<strong>on</strong>g>the</str<strong>on</strong>g> car spaces is acceptable.CompliesStandard B 17 Side and rear setbacksGround floorBoundary Wall height Required Setback Proposed setbackUnit 1 – East 3.6m 1m 4mUnit 1 – West 2.7m 1m 1mUnit 2 – East 3.3m 1m 4.6mUnit 2 – West 3.3m 1m 2mUnit 3 - East 3.4m 1m 4.6mUnit 3 - West 3.4m 0m 2mUnit 4 – East 3.7m 1.03m 3.2mUnit 4 – West 2.98m 1m 150mm (see walls<strong>on</strong> boundaryassessment)Unit 4 – North 2.8m 1m 3.06mFirst FloorBoundary Wall height Required Setback Proposed setbackUnit 1 – East 5.4m 1.54m 4.7mUnit 1 – West 5.3m 1.51m 1.85mUnit 2 – East 5.4m 1.54m 5.386mUnit 2 – West 5.3m 1.51m 3.7mUnit 3 - East 5.5m 1.57m 5.386mUnit 3 - West 5.4m 1.54m 3.7m• Walls built to boundary are c<strong>on</strong>sidered under <str<strong>on</strong>g>the</str<strong>on</strong>g> walls <strong>on</strong> boundaries standard below.CompliesPage 31


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B18 Walls <strong>on</strong> boundaries• The proposal provides a 7.67m l<strong>on</strong>g wall al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> west boundary where a maximumboundary wall length <str<strong>on</strong>g>of</str<strong>on</strong>g> 10m + 25% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remaining boundary wall is allowed al<strong>on</strong>g<str<strong>on</strong>g>the</str<strong>on</strong>g> boundary under this standard. The wall provides a maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3m wherean average wall height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3m is recommended under Clause 55.CompliesStandard B19 Daylight to existing windows• All existing windows located opposite <str<strong>on</strong>g>the</str<strong>on</strong>g> development have a light court with an area<str<strong>on</strong>g>of</str<strong>on</strong>g> at least 3 square metres and minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 1m clear to <str<strong>on</strong>g>the</str<strong>on</strong>g> sky. Upperfloor walls are set back more than half <str<strong>on</strong>g>the</str<strong>on</strong>g>ir wall height where opposite habitable roomwindows.CompliesStandard B20 North facing windows• NA (There are no north facing windows within 3m <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development).CompliesStandard B21 Overshadowing open space• The submitted shadow diagrams indicate that <str<strong>on</strong>g>the</str<strong>on</strong>g> development does not significantlyovershadow <str<strong>on</strong>g>the</str<strong>on</strong>g> existing secluded private open space <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining properties andcomplies with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard (at least 75 per cent, or 40 square metres with a minimumdimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres, whichever is <str<strong>on</strong>g>the</str<strong>on</strong>g> lesser area, <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private openspace <strong>on</strong> adjoining lots will receive a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> five hours <str<strong>on</strong>g>of</str<strong>on</strong>g> sunlight between 9amand 3pm <strong>on</strong> 22 September).CompliesStandard B22 Overlooking• The proposed ground floor levels have finished floor levels less than 0.8m abovenatural ground level at <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary. The proposed 1.8m high boundary fences willsufficiently limit overlooking to comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.• The upper floor balc<strong>on</strong>ies will have screens to <str<strong>on</strong>g>the</str<strong>on</strong>g>ir perimeter to a height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7m.These screens should be a maximum 25% transparency, in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>standard requirement.• There are no windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> west elevati<strong>on</strong> and all upper floor windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> east areto have fixed obscure glass to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7m above floor level. All upperfloor windows to <str<strong>on</strong>g>the</str<strong>on</strong>g> internal north and south elevati<strong>on</strong>s will have obscure glass or sillsto 1.7m and thus meet <str<strong>on</strong>g>the</str<strong>on</strong>g> standard. All first floor obscure glass should be fixed to1.7m above finished floor level.Complies subject to c<strong>on</strong>diti<strong>on</strong>sStandard B23 Internal views• N/A (There are no opportunities for internal overlooking).Standard B24 Noise impacts• There are no obvious noise sources within <str<strong>on</strong>g>the</str<strong>on</strong>g> development that would not normally beexpected in a residential area.CompliesPage 32


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B25 Accessibility• The proposed dwellings can be made accessible for people with limited mobility byc<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a ramp, if required.CompliesStandard B26 Dwelling entry• The entries are visible and easily identifiable. A sense <str<strong>on</strong>g>of</str<strong>on</strong>g> address and shelter is alsoprovided adjacent each entrance.CompliesStandard B27 Daylight to new windows• Adequate daylight will be available to <str<strong>on</strong>g>the</str<strong>on</strong>g> windows in <str<strong>on</strong>g>the</str<strong>on</strong>g> new development.Habitable room windows face an outdoor space clear to <str<strong>on</strong>g>the</str<strong>on</strong>g> sky or a light court with aminimum area <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 square metres and minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 1m clear to <str<strong>on</strong>g>the</str<strong>on</strong>g> sky.CompliesStandard B28Private open space• The development provides adequate private open space for <str<strong>on</strong>g>the</str<strong>on</strong>g> reas<strong>on</strong>ablerecreati<strong>on</strong> and service needs <str<strong>on</strong>g>of</str<strong>on</strong>g> residents. To ensure adequate solar access to <str<strong>on</strong>g>the</str<strong>on</strong>g>balc<strong>on</strong>y <str<strong>on</strong>g>of</str<strong>on</strong>g> Dwelling 1 changes are recommended (see solar access to open spacebelow). The assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Dwelling 1 balc<strong>on</strong>y is based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> originallyadvertised plans.• The standard specifies that a balc<strong>on</strong>y <str<strong>on</strong>g>of</str<strong>on</strong>g> 8 square metres with a minimum width <str<strong>on</strong>g>of</str<strong>on</strong>g>1.6 metres with c<strong>on</strong>venient access from a living room is an acceptable amount <str<strong>on</strong>g>of</str<strong>on</strong>g>open space for <str<strong>on</strong>g>the</str<strong>on</strong>g> recreati<strong>on</strong> needs <str<strong>on</strong>g>of</str<strong>on</strong>g> a dwelling. Dwellings 1, 2 and 3 will have firstfloor balc<strong>on</strong>ies <str<strong>on</strong>g>of</str<strong>on</strong>g> 12.7 square metres (see solar access to open space c<strong>on</strong>diti<strong>on</strong>below), 15 square metres and 9.7 square metres respectively with a minimum width<str<strong>on</strong>g>of</str<strong>on</strong>g> 2.3m, 3m and 1.6m respectively. The balc<strong>on</strong>ies comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard andc<strong>on</strong>sequently are an acceptable method <str<strong>on</strong>g>of</str<strong>on</strong>g> providing private open space. It is als<strong>on</strong>oted that Dwellings 1, 2 and 3 also have ground level secluded private open spaces<str<strong>on</strong>g>of</str<strong>on</strong>g> 12 square metres, 20 square metres and 20 square metres respectively. Theseground level open spaces provide additi<strong>on</strong>al recreati<strong>on</strong> area and landscapingopportunities (to maintain <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area)• Dwelling 4 will have 66.5 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space, with adimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> greater than 3m.• All secluded private open space areas have direct access to a living room.CompliesStandard B29 Solar access to open space• All balc<strong>on</strong>ies are north facing. There is no wall to <str<strong>on</strong>g>the</str<strong>on</strong>g> north <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Dwelling 3 balc<strong>on</strong>y.The Dwellings 1 and 2 balc<strong>on</strong>ies have a 2.6m to 4.2m high wall setback 3.67m and6.4m from <str<strong>on</strong>g>the</str<strong>on</strong>g> south boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>ir balc<strong>on</strong>ies. Dwelling 2 is in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>standard. Dwelling 1 is not in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard. It is recommended that<str<strong>on</strong>g>the</str<strong>on</strong>g> Dwelling 1 first floor balc<strong>on</strong>y be relocated to <str<strong>on</strong>g>the</str<strong>on</strong>g> west <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling generally inaccordance with Plan TP03 and TP04 Rev A as submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> andadvertised. This provides a 12.7 square metre balc<strong>on</strong>y.Complies subject to c<strong>on</strong>diti<strong>on</strong>Page 33


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B30 Storage• Six (6) cubic metres <str<strong>on</strong>g>of</str<strong>on</strong>g> storage facilities are provided to each dwelling.CompliesStandard B31 Design detail• Brick and wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard dominate <str<strong>on</strong>g>the</str<strong>on</strong>g> street and it is recommended that <str<strong>on</strong>g>the</str<strong>on</strong>g> upperfloor facades (which comprise polystyrene cladding) incorporate wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ilecladding to respect <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape character. Subject to this change it is c<strong>on</strong>sideredthat <str<strong>on</strong>g>the</str<strong>on</strong>g> design, siting and scale <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development resp<strong>on</strong>ds to <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>streetscape by providing a matching ro<str<strong>on</strong>g>of</str<strong>on</strong>g> form and materials to those prevailing in <str<strong>on</strong>g>the</str<strong>on</strong>g>immediate area. It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> development represents a reas<strong>on</strong>ablevisual transiti<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> adjacent properties and no significant visual impactup<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> pattern <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape and neighbourhood character arises as a result<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> siting <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal.Complies subject to c<strong>on</strong>diti<strong>on</strong>sStandard B32 Fr<strong>on</strong>t fences• No fr<strong>on</strong>t fence is proposed which is c<strong>on</strong>sistent with neighbouring properties.CompliesStandard B33 Comm<strong>on</strong> property• The development has been designed so that <str<strong>on</strong>g>the</str<strong>on</strong>g> land may be subdivided with <strong>on</strong>ly<str<strong>on</strong>g>the</str<strong>on</strong>g> driveway area as comm<strong>on</strong> property. This is an acceptable arrangement whichcould be easily managed by a body corporate.CompliesStandard B34 Site services• Each dwelling has sufficient area to locate site services without impacting <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>o<str<strong>on</strong>g>the</str<strong>on</strong>g>r lots or <strong>on</strong> adjoining properties. Site services should be shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> plans inappropriate locati<strong>on</strong>s.Complies subject to c<strong>on</strong>diti<strong>on</strong>sCONCLUSIONThe proposal complies with all relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> policies and <str<strong>on</strong>g>planning</str<strong>on</strong>g> scheme requirements.It is recommended that <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> be approved. Subject to c<strong>on</strong>diti<strong>on</strong>s, <str<strong>on</strong>g>the</str<strong>on</strong>g> proposalcomplies with all relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> policies and <str<strong>on</strong>g>planning</str<strong>on</strong>g> scheme requirements. It isrecommended that <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> be approved.POLICY IMPLICATIONSEnvir<strong>on</strong>mental SustainabilityAll new dwellings are required to achieve a minimum six (6) star energy rating under <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant building c<strong>on</strong>trols.Page 34


PLANNING COMMITTEE MINUTES 25 JULY 2011Social Inclusi<strong>on</strong> and DiversityNil.O<str<strong>on</strong>g>the</str<strong>on</strong>g>rNil.FINANCIAL AND RESOURCE IMPLICATIONSThere are no financial or resource implicati<strong>on</strong>s as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> determinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thisapplicati<strong>on</strong>.FUTURE ACTIONSNil.DISCLOSURE OF INTERESTSSecti<strong>on</strong> 80C <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Local Government Act 1989 requires members <str<strong>on</strong>g>of</str<strong>on</strong>g> Council staff andpers<strong>on</strong>s engaged under c<strong>on</strong>tract to provide advice to Council to disclose any direct orindirect interest in a matter to which <str<strong>on</strong>g>the</str<strong>on</strong>g> advice relates.The Manager authorising this report, having made enquiries with relevant members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,reports that no disclosable interests have been raised in relati<strong>on</strong> to this report.RELATED DOCUMENTSNote relevant legislati<strong>on</strong>. However, <str<strong>on</strong>g>the</str<strong>on</strong>g> following would be applicable to <str<strong>on</strong>g>the</str<strong>on</strong>g> majority <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>planning</str<strong>on</strong>g> applicati<strong>on</strong>s: <strong>Darebin</strong> Planning Scheme and <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act(1987) as amended.COMMITTEE DECISIONMOVED:SECONDED:Cr. T. LaurenceCr. N. KatsisTHAT Planning Permit Applicati<strong>on</strong> D/238/2011 be refused and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g>Refusal be issued <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> following grounds:(1) The proposal provides insufficient landscaping opportunities and is c<strong>on</strong>traryto <str<strong>on</strong>g>the</str<strong>on</strong>g> backyard character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area and Clauses 22.04, 55.01-2 and55.03-8 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.(2) The two storey scale <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is c<strong>on</strong>trary to <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>streetscape and Clause 22.04 and 55.01-2 and 55.06-1 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme.Page 35


PLANNING COMMITTEE MINUTES 25 JULY 2011(3) The reverse living arrangement <str<strong>on</strong>g>of</str<strong>on</strong>g> Dwellings 1, 2 and 3 provides insufficientopen space for <str<strong>on</strong>g>the</str<strong>on</strong>g> likely user needs, poor amenity for residents and isc<strong>on</strong>trary to Clause 55.05-4 if <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.(4) The proposal is an overdevelopment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.CARRIEDPage 36


PLANNING COMMITTEE MINUTES 25 JULY 20115.3 APPLICATION FOR PLANNING PERMIT D/227/200928-30 Hutt<strong>on</strong> Street, ThornburyAUTHOR:DIRECTOR:Senior Planner – Deniz Yener-KorematsuDirector <strong>City</strong> Works and Development – Michael BallockOWNER/APPLICANT/CONSULTANT:Applicant:Peter Rujanoski C/- Architectural Plans & PermitsShop 2 387 Stati<strong>on</strong> StTHORNBURY VIC 3071Owner:Xiao Ling Wu28 Hutt<strong>on</strong> StTHORNBURY VIC 3071SUMMARY:• The proposal is for a medium density housing development comprising six (6) doublestoreydwellings. The dwellings generally provide two (2) and three (3) bedroomaccommodati<strong>on</strong> and commensurate <strong>on</strong>-site car parking for <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings, including two(2) visitor parking spaces.• A restrictive covenant is registered <strong>on</strong> each <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Certificates <str<strong>on</strong>g>of</str<strong>on</strong>g> Title and relate to‘mining rights’ over <str<strong>on</strong>g>the</str<strong>on</strong>g> land under <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant Mining Act as referred to within <str<strong>on</strong>g>the</str<strong>on</strong>g>body <str<strong>on</strong>g>of</str<strong>on</strong>g> Covenant. The proposal to c<strong>on</strong>struct dwellings is not c<strong>on</strong>sidered to breach <str<strong>on</strong>g>the</str<strong>on</strong>g>covenant.• Recommendati<strong>on</strong> - supportCONSULTATION:• Letters were sent to adjoining and surrounding owners and occupiers and a sign waserected <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.• Seven (7) objecti<strong>on</strong>s have been received, including <strong>on</strong>e (1) objecti<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> apetiti<strong>on</strong> with four (4) signatures.• A c<strong>on</strong>sultati<strong>on</strong> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> was not <str<strong>on</strong>g>held</str<strong>on</strong>g> as <str<strong>on</strong>g>the</str<strong>on</strong>g> objecti<strong>on</strong>s raised were not c<strong>on</strong>sidered tobe able to be mediated.• The applicati<strong>on</strong> has not been referred externally• The applicati<strong>on</strong> has been referred internally to <str<strong>on</strong>g>the</str<strong>on</strong>g> following Council Units:- Capital Works Unit – <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> is supported subject to c<strong>on</strong>diti<strong>on</strong>s.- Transport Management and Planning Unit – <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> is supported subjectto c<strong>on</strong>diti<strong>on</strong>s.Page 37


PLANNING COMMITTEE MINUTES 25 JULY 2011RECOMMENDATIONTHAT Planning Permit Applicati<strong>on</strong> D/227/2009 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> toGrant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. Theplans must be drawn to scale with dimensi<strong>on</strong>s and must be generally in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> (identified as Ground Floor Plan A-1, FirstFloor Plan A-2, Elevati<strong>on</strong>s A-3 revised 26.11.2010, prepared by Architectural Plansand Permits and received by Council <strong>on</strong> 10 December 2010) but modified to show:a) The visitor parking space between Unit 2 and Unit 3 increased in width to 3.5metres by a relocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2’s nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall or Unit 3’s sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall, or arelocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both walls as necessary but without increasing <str<strong>on</strong>g>the</str<strong>on</strong>g> building footprintor reducing any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remaining setbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r dwelling.b) The eastern kitchen wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 relocated to align with <str<strong>on</strong>g>the</str<strong>on</strong>g> eastern entry andstaircase wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 to allow sufficient manoeuvrability for <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining visitorcar parking space and a <strong>on</strong>e (1) metre wide landscape buffer in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>relocated eastern wall.c) The existing western crossover servicing Unit 1 realigned to match <str<strong>on</strong>g>the</str<strong>on</strong>g>accessway locati<strong>on</strong>.d) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pedestrian visibility splays measuring 2.0 metres (width across<str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage) by 2.5 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to <str<strong>on</strong>g>the</str<strong>on</strong>g> eastern and western sides<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed and existing crossovers to Hutt<strong>on</strong> Street. Where within <str<strong>on</strong>g>the</str<strong>on</strong>g>subject site, any structures or vegetati<strong>on</strong> within <str<strong>on</strong>g>the</str<strong>on</strong>g>se splays must be not morethan 1.15 metres in height.e) A notati<strong>on</strong> indicating <str<strong>on</strong>g>the</str<strong>on</strong>g> extent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> rear right <str<strong>on</strong>g>of</str<strong>on</strong>g> way (referto C<strong>on</strong>diti<strong>on</strong> No.19 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).f) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> high quality garage doors to Unit 1 and Unit 6, including fullspecificati<strong>on</strong>s, that blend in with <str<strong>on</strong>g>the</str<strong>on</strong>g> colour and materials scheme <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 andUnit 6.g) The specificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> timber cladding to <str<strong>on</strong>g>the</str<strong>on</strong>g> first floor walls <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 6.h) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> permeable paving to <str<strong>on</strong>g>the</str<strong>on</strong>g> driveways <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 6; and <str<strong>on</strong>g>the</str<strong>on</strong>g>visitor car parking space hardstands <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.i) A setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 metre between <str<strong>on</strong>g>the</str<strong>on</strong>g> shared accessway and <str<strong>on</strong>g>the</str<strong>on</strong>g> western wall <str<strong>on</strong>g>of</str<strong>on</strong>g>Unit 5.j) The western kitchen windows <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 with a minimum sill height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.4 metresabove <str<strong>on</strong>g>the</str<strong>on</strong>g> accessway.k) The setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Bedroom 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 4 from <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rnboundary corrected to show approximately 4.8 metres.l) The setback <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3’s first floor walls from <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary increased to 3metres for <str<strong>on</strong>g>the</str<strong>on</strong>g> bathroom and 3.5 metres for Bedroom 2, without an increase in<str<strong>on</strong>g>the</str<strong>on</strong>g> footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling and without a reducti<strong>on</strong> to any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r setbacksfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> boundaries.m) The finished first floor levels <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings, to Australian Height Datum (AHD).Page 38


PLANNING COMMITTEE MINUTES 25 JULY 2011n) The western ground floor wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 (meals and laundry) reduced in height to3 metres maximum average, with no part exceeding a height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.6 metres abovenatural ground level.o) The windows listed below provided with ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:- A sill with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floor level,- A fixed screen with a maximum permeability <str<strong>on</strong>g>of</str<strong>on</strong>g> 25% to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g>1.7 metres above finished floor level or- Fixed obscure glazing (not film) to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres abovefinished floor level.Where fixed screens are being utilised a secti<strong>on</strong> diagram must be included todem<strong>on</strong>strate how <str<strong>on</strong>g>the</str<strong>on</strong>g> screens minimise overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining properties:• Unit 1 – west facing Bedroom 1 window• Unit 2 – west facing Bedroom 2 window• Unit 3 – north-facing (both) Bedroom 2 windows• Unit 4 – north-facing Bedroom 1 & Bedroom 2 windows• Unit 5 – east facing Bedroom 2 windowp) The width <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 increased by from3.7 metres to 4.2 metres, providing a secluded private open space area 25square metres minimum, measuring 4.20 metres x 5.99 metres.q) The secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6 modified to provide an areameasuring 5 metre x 5 metre as measured from <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6,resulting in a partial deleti<strong>on</strong>/modificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> south-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5.r) The eastern wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Bedroom 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 with a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 5 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g>eastern boundary to provide solar access to <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open spacearea <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6 in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> Clause 55.05-5 (StandardB29) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.s) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space area to Unit 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> 25 square metreswith a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres; and an overall private open space area<str<strong>on</strong>g>of</str<strong>on</strong>g> 40 square metres minimum.t) The height <str<strong>on</strong>g>of</str<strong>on</strong>g> fences <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn, eastern and western boundaries (exceptwithin 6.5 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land) to be a minimum height<str<strong>on</strong>g>of</str<strong>on</strong>g> 1.8 metres as measured above natural ground level.Where necessary, <str<strong>on</strong>g>the</str<strong>on</strong>g> fence height may be increased by raising <str<strong>on</strong>g>the</str<strong>on</strong>g> height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>fence or by <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> free-standing, self supporting trellis adjacent <str<strong>on</strong>g>the</str<strong>on</strong>g>fence to <str<strong>on</strong>g>the</str<strong>on</strong>g> required height. If utilised, such trellis must be a maximum <str<strong>on</strong>g>of</str<strong>on</strong>g> 25%open and be fixed, permanent, durable and coloured or painted to blend with <str<strong>on</strong>g>the</str<strong>on</strong>g>development.u) A landscape plan in accordance with C<strong>on</strong>diti<strong>on</strong> No. 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.v) Modificati<strong>on</strong>s in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> Sustainable Design Statement (refer toC<strong>on</strong>diti<strong>on</strong> No. 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).w) A comprehensive schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> materials, external finishes andcolours (including colour samples).When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.Page 39


PLANNING COMMITTEE MINUTES 25 JULY 20112. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be altered without <str<strong>on</strong>g>the</str<strong>on</strong>g>prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.3. This Permit will expire if ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> thisPermit; or• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request is made inwriting before this Permit expires or within three (3) m<strong>on</strong>ths after <str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.4. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any works authorised by thispermit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong> Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>development levy for each charge unit must be calculated in accordance with Schedule1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong> Plan Overlay.5. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan is approved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>nform part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. The Landscape Plan must be prepared by a suitably qualifiedpers<strong>on</strong> and must incorporate:a) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e (1) medium canopy tree within <str<strong>on</strong>g>the</str<strong>on</strong>g> secludedprivate open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> each dwelling, with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2)metres and <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5 metres atmaturityb) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) medium canopy trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tsetback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2) metres and <str<strong>on</strong>g>the</str<strong>on</strong>g>time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5 metres at maturityc) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to be removed,including overhanging trees <strong>on</strong> adjoining properties. The genus, species, heightand spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specifiedd) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanical name,comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plantse) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds and hard paving(such as asphalt, c<strong>on</strong>crete, brick or gravel)f) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyg) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbage binreceptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etch) Edge treatment between grass (lawn) and garden bedsi) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings <strong>on</strong> adjoiningland, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows and doors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject sitemust also be shownj) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead and underground services.C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed planting must beavoidedk) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbersPage 40


PLANNING COMMITTEE MINUTES 25 JULY 2011l) A scale, North Point and appropriate legend.The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.6. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, a Sustainable Design Statement detailing sustainabledesign strategies to be incorporated into <str<strong>on</strong>g>the</str<strong>on</strong>g> development to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved in writing by <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority. The sustainable design statement must outline proposedsustainable design initiatives within <str<strong>on</strong>g>the</str<strong>on</strong>g> development such as (but not limited to) energyefficiency, water c<strong>on</strong>servati<strong>on</strong>, stormwater quality, waste management and materialselecti<strong>on</strong>.The development must be c<strong>on</strong>structed in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements/recommendati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Sustainable Design Statement to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be completed to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied and/or<str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as is approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority inwriting.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g> permit holdermust advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping has been completed.8. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be maintained, andany dead, diseased or damaged plant replaced in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsedLandscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.9. Floor levels shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must be c<strong>on</strong>firmed. The c<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Act 1993 and <str<strong>on</strong>g>the</str<strong>on</strong>g> BuildingRegulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong> must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a report from a licensedland surveyor and must be submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority no later than 7 daysfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels must be c<strong>on</strong>firmedbefore a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensed land surveyorsubmitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. All dwellings that share dividing walls and/or floors must be c<strong>on</strong>structed to limit noisetransmissi<strong>on</strong> in accordance with Part F(5) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.11. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting system capable <str<strong>on</strong>g>of</str<strong>on</strong>g>illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage and car parking space andall pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.The external lighting must be designed, baffled and/or located to ensure that no loss <str<strong>on</strong>g>of</str<strong>on</strong>g>amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority.12. Boundary walls facing adjoining properties must be cleaned and finished to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.14. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes, fixtures, fittingsand vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must be c<strong>on</strong>cealed in service ducts oro<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Page 41


PLANNING COMMITTEE MINUTES 25 JULY 201115. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than those shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> priorwritten c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles for newspapers to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.17. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g> vehicles andaccess lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>plans;c) Surfaced with an all wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r sealcoat; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not beused for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.18. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied, vehicular crossing(s) must be c<strong>on</strong>structed to alignwith approved driveways to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. All redundantcrossing(s) or crossing opening(s) must be removed and replaced with footpath,naturestrip and kerb and channel to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.19. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development:a) Plans detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> and surfacing including drainage <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> right <str<strong>on</strong>g>of</str<strong>on</strong>g>way abutting <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property, commencing from <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>astcorner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property at No.26 Hutt<strong>on</strong> Street and c<strong>on</strong>tinuing west to <str<strong>on</strong>g>the</str<strong>on</strong>g>north-west corner alignment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land (30 Hutt<strong>on</strong> Street), must besubmitted to and approved by Council.b) The right <str<strong>on</strong>g>of</str<strong>on</strong>g> way to abutting <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property and No.26Hutt<strong>on</strong> Street, commencing from <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property at No.26Hutt<strong>on</strong> Street and c<strong>on</strong>tinuing west to <str<strong>on</strong>g>the</str<strong>on</strong>g> north-west corner alignment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>subject land (30 Hutt<strong>on</strong> Street) must be c<strong>on</strong>structed and surfaced in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> approved plans.All works must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> resp<strong>on</strong>sible authority.REPORTINTRODUCTION AND BACKGROUND• Planning Permit applicati<strong>on</strong> D/227/2009 was lodged <strong>on</strong> 9 April 2009. At that time, acovenant as it appeared <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title for No.28 Hutt<strong>on</strong> Street restricted <str<strong>on</strong>g>the</str<strong>on</strong>g>use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> land to not more than <strong>on</strong>e residence or not more than <strong>on</strong>e residence and<strong>on</strong>e building for business purposes. The applicati<strong>on</strong> comprised <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>four (4) new dwellings and <str<strong>on</strong>g>the</str<strong>on</strong>g> retenti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling at No.28 Hutt<strong>on</strong> Street.• On 27 January 2011, <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> was amended under Secti<strong>on</strong> 50A <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planningand Envir<strong>on</strong>ment Act 1987 and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal with this applicati<strong>on</strong> comprised <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) double-storey dwellings. The Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title submitted withPage 42


PLANNING COMMITTEE MINUTES 25 JULY 2011this applicati<strong>on</strong> showed that <str<strong>on</strong>g>the</str<strong>on</strong>g> part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> covenant previously restricting <str<strong>on</strong>g>the</str<strong>on</strong>g>c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> more than <strong>on</strong>e residence <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land had been removed from <str<strong>on</strong>g>the</str<strong>on</strong>g> Title.ISSUES AND DISCUSSIONSubject site and surrounding area• The subject site is comprised <str<strong>on</strong>g>of</str<strong>on</strong>g> two allotments providing a combined fr<strong>on</strong>tage <str<strong>on</strong>g>of</str<strong>on</strong>g> 28.66metres to Hutt<strong>on</strong> Street, a depth <str<strong>on</strong>g>of</str<strong>on</strong>g> 46.02 metres and a total site area <str<strong>on</strong>g>of</str<strong>on</strong>g> 1322.8 squaremetres.• The site is relatively flat.• The subject land is z<strong>on</strong>ed Residential 1 (R1Z) and is affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> DevelopmentC<strong>on</strong>tributi<strong>on</strong>s Plan Overlay (DCPO1)• The subject land is situated <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn side <str<strong>on</strong>g>of</str<strong>on</strong>g> Hutt<strong>on</strong> Street and has a Right <str<strong>on</strong>g>of</str<strong>on</strong>g>Way abuttal to its north boundary.• Two (2) single-storey dwellings exist <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site.• Thornbury Primary School is to <str<strong>on</strong>g>the</str<strong>on</strong>g> east, adjoining No.26 Hutt<strong>on</strong> Street.• Single-storey dwellings occupy <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining sites to <str<strong>on</strong>g>the</str<strong>on</strong>g> east and west.• A twelve (12) unit development (single-storey) occupies <str<strong>on</strong>g>the</str<strong>on</strong>g> site <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> south side <str<strong>on</strong>g>of</str<strong>on</strong>g>Hutt<strong>on</strong> Street, opposite <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site.• Bey<strong>on</strong>d <str<strong>on</strong>g>the</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way to <str<strong>on</strong>g>the</str<strong>on</strong>g> north, are <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space areas <str<strong>on</strong>g>of</str<strong>on</strong>g>detached dwellings facing Murray Street.• The site is located 120 metres east <str<strong>on</strong>g>of</str<strong>on</strong>g> St Georges Road and approximately 400 metreswest <str<strong>on</strong>g>of</str<strong>on</strong>g> High Street. The Miller <strong>on</strong> Gilbert, South Prest<strong>on</strong> and Thornbury Village activitycentres are all within a 600 metre radius <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site. The site has c<strong>on</strong>venientaccess to Tram Routes 11 and 125 al<strong>on</strong>g St Georges Road; is 200 metres fromThornbury Railway Stati<strong>on</strong> and 450 metres from Tram Route 86 al<strong>on</strong>g High Street.Proposal• Six (6) double-storey dwellings are proposed.• The dwellings provide two (2) and three (3) bedroom accommodati<strong>on</strong>.• Each dwelling with two (2) bedrooms has access to a covered parking space; and eachdwelling with three (3) or more bedrooms has access to two (2) parking spaces.• Two (2) visitor parking spaces are available <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.• The two (2) existing crossovers to Hutt<strong>on</strong> Street will be retained and <strong>on</strong>e (1) newcentrally located crossover is proposed.• Vehicular access to <str<strong>on</strong>g>the</str<strong>on</strong>g> garages <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> rear dwellings will be gained via <str<strong>on</strong>g>the</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way.• Each dwelling is provided in excess <str<strong>on</strong>g>of</str<strong>on</strong>g> 40 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> private open space.Page 43


PLANNING COMMITTEE MINUTES 25 JULY 2011OBJECTIONS• Seven (7) objecti<strong>on</strong>s have been received.Objecti<strong>on</strong>s summarised1. Window locati<strong>on</strong> <strong>on</strong> adjoining site incorrectly shown2. Secluded private open space areas and fences <strong>on</strong> adjoining site not shown3. Wall <strong>on</strong> boundary too high4. Removal or retenti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> boundary fences not clear5. Visitor parking space not workable6. Loss <str<strong>on</strong>g>of</str<strong>on</strong>g> street parking due to additi<strong>on</strong>al crossover7. Overlooking8. Due to <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> and width <str<strong>on</strong>g>of</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way, access to garages via <str<strong>on</strong>g>the</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way is not appropriate9. Owner <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining property is not willing to c<strong>on</strong>tribute financially to <str<strong>on</strong>g>the</str<strong>on</strong>g> upgrade <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way10. Overdevelopment11. Insufficient public notificati<strong>on</strong> period12. Public Notices <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site not erected for full advertising period13. Neighbourhood character14. Two-storey height into <str<strong>on</strong>g>the</str<strong>on</strong>g> site inappropriate15. Property devaluati<strong>on</strong>16. Traffic noise al<strong>on</strong>g Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way17. Insufficient parking for <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings which have a study as well as three (3) bedrooms18. Insufficient parking in <str<strong>on</strong>g>the</str<strong>on</strong>g> street due to school and tram/train users19. Traffic c<strong>on</strong>gesti<strong>on</strong>20. Inc<strong>on</strong>venience to surrounding area during c<strong>on</strong>structi<strong>on</strong> period (parking and security)21. Insufficient area <strong>on</strong> street for twelve (12) bins <strong>on</strong> waste collecti<strong>on</strong> days22. Increased vehicles a safety risk to pedestrians and school children23. Overshadowing <str<strong>on</strong>g>of</str<strong>on</strong>g> windows24. Reduced energy efficiency due to reduced daylight to adjoining habitable roomwindows25. Densely built-up areas linked to increased crime26. Loss <str<strong>on</strong>g>of</str<strong>on</strong>g> food security and urban food producti<strong>on</strong> (loss <str<strong>on</strong>g>of</str<strong>on</strong>g> vegetable and fruit gardens)27. Driveways and car parks create heat islands28. Older dwellings provide affordable shared accommodati<strong>on</strong>; new dwellings are lessaffordable.Page 44


PLANNING COMMITTEE MINUTES 25 JULY 2011Officer comment <strong>on</strong> summarised objecti<strong>on</strong>s1. A site inspecti<strong>on</strong> has been carried out by <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer and any discrepanciesin <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining windows as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> plans has been taken intoc<strong>on</strong>siderati<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong>.2. A site inspecti<strong>on</strong> has been carried out by <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer and any informati<strong>on</strong> left<str<strong>on</strong>g>of</str<strong>on</strong>g>f <str<strong>on</strong>g>the</str<strong>on</strong>g> development drawings in relati<strong>on</strong> to fences and private open space areas <strong>on</strong>adjoining sites has been taken into c<strong>on</strong>siderati<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>applicati<strong>on</strong>.3. The wall height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.4 metres to <str<strong>on</strong>g>the</str<strong>on</strong>g> western wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 is n<strong>on</strong>-compliant with <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant standard and will need to be reduced via c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval.The eastern Unit 4 wall is c<strong>on</strong>structed against a simultaneously c<strong>on</strong>structed wall <strong>on</strong><str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary and is proposed to have a height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.375 metres. As this wallis to be c<strong>on</strong>structed against a simultaneously c<strong>on</strong>structed wall <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoiningproperty, <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant standard in Clause 55 allows <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed height.4. All fences al<strong>on</strong>g boundaries, existing or new, are required to achieve a minimumheight <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.8 metres and this can be addressed as part <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval (seediscussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g> this report).5. The visitor parking space between Units 2 and 3 is not able to manoeuvre to exit <str<strong>on</strong>g>the</str<strong>on</strong>g>site in a forwards directi<strong>on</strong>. This can be rectified via c<strong>on</strong>diti<strong>on</strong>s modifying <str<strong>on</strong>g>the</str<strong>on</strong>g> easternwall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g> this report).6. There is no net loss in street car parking as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development. Council’sTransport Management and Planning Unit have advised that three (3) vehicles arecurrently able to be accommodated in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site; three (3) vehicles can beaccommodated in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site with <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed crossovers, provided <str<strong>on</strong>g>the</str<strong>on</strong>g> existingwestern crossover is relocated to align with <str<strong>on</strong>g>the</str<strong>on</strong>g> driveway <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1.7. Overlooking from first floor areas <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development can be addressed viac<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g> this report).8. Council’s Transport engineer and <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer have inspected <str<strong>on</strong>g>the</str<strong>on</strong>g> subject siteand <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way. Despite <str<strong>on</strong>g>the</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way having a width <str<strong>on</strong>g>of</str<strong>on</strong>g> less than3 metres, vehicular access to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear garages can still be managed from <str<strong>on</strong>g>the</str<strong>on</strong>g>laneway as <str<strong>on</strong>g>the</str<strong>on</strong>g> garages are sufficiently set back into <str<strong>on</strong>g>the</str<strong>on</strong>g> site and <str<strong>on</strong>g>the</str<strong>on</strong>g> fences adjacentto <str<strong>on</strong>g>the</str<strong>on</strong>g> garages provide appropriate splays.9. The full cost <str<strong>on</strong>g>of</str<strong>on</strong>g> sealing and upgrading <str<strong>on</strong>g>the</str<strong>on</strong>g> laneway will be borne by <str<strong>on</strong>g>the</str<strong>on</strong>g>developer/owner; development c<strong>on</strong>tributi<strong>on</strong> from adjoining properties will not berequested for <str<strong>on</strong>g>the</str<strong>on</strong>g>se works. This requirement will be covered by c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> anyapproval.10. The site is suitably located within proximity to services and public transportinfrastructure. The design is appropriate in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> resp<strong>on</strong>se to <str<strong>on</strong>g>the</str<strong>on</strong>g> opportunitiesand c<strong>on</strong>straints <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site and compliance with overall residential policy in terms <str<strong>on</strong>g>of</str<strong>on</strong>g>neighbourhood character and site resp<strong>on</strong>sive design. The proposed intensity <str<strong>on</strong>g>of</str<strong>on</strong>g>development is <str<strong>on</strong>g>the</str<strong>on</strong>g>refore c<strong>on</strong>sidered to be acceptable.11. Public notificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> has been undertaken in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act 1987. The applicant has provided aStatutory Declarati<strong>on</strong> declaring that public notificati<strong>on</strong> signs remained <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site fora 14 day period. A decisi<strong>on</strong> <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> has not been made prior to advertisingbeing completed. It is c<strong>on</strong>sidered that affected properties have been providedsufficient time to submit c<strong>on</strong>cerns in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Act.Page 45


PLANNING COMMITTEE MINUTES 25 JULY 201112. See resp<strong>on</strong>se in item 11 above.13. The development is not c<strong>on</strong>sidered to be out <str<strong>on</strong>g>of</str<strong>on</strong>g> character with <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding areaas sufficient fr<strong>on</strong>t and side setbacks are made available for landscaping purposes,<str<strong>on</strong>g>the</str<strong>on</strong>g> two-storey form is an appropriate height transiti<strong>on</strong> to existing single-storey andtwo-storey dwellings and residential buildings in <str<strong>on</strong>g>the</str<strong>on</strong>g> area; <str<strong>on</strong>g>the</str<strong>on</strong>g> development has adomestic character which is generally in keeping with neighbourhood character, and<str<strong>on</strong>g>the</str<strong>on</strong>g> immediately surrounding area is sufficiently varied in scale and architectural formto accommodate <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal . These matters are fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r covered in <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer’sreport.14. Two-storey height into <str<strong>on</strong>g>the</str<strong>on</strong>g> site can be appropriate provided amenity impacts <strong>on</strong>adjoining properties are sensitively managed. See fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g>this report.15. Property values are speculative and not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> issue.16. The primary purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> a Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way is to enable vehicular access to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g>properties and is an existing arrangement for properties abutting <str<strong>on</strong>g>the</str<strong>on</strong>g> Right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-Way.Any traffic noise resulting from this use will be intermittent and should notsubstantially affect <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> surrounding properties.17. Sufficient car parking is provided for <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings which have a study, in accordancewith relevant <str<strong>on</strong>g>planning</str<strong>on</strong>g> policy (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g> this report).18. Council’s Transport Management and Planning Unit have advised that a traffic studyfor Hutt<strong>on</strong> Street has been carried out. Based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> study, any additi<strong>on</strong>al traffic andparking demand associated with <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed development should not place unduestrain <strong>on</strong> Hutt<strong>on</strong> Street and surrounding street networks.19. See comments under Item 18 above.20. Any loss <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity resulting from <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> phase <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is not a<str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>.21. The applicati<strong>on</strong> has been referred to Council’s Waste Services Unit who advised that<str<strong>on</strong>g>the</str<strong>on</strong>g>y do not foresee any issues with <str<strong>on</strong>g>the</str<strong>on</strong>g> placement <str<strong>on</strong>g>of</str<strong>on</strong>g> bins in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site. Thesize and number <str<strong>on</strong>g>of</str<strong>on</strong>g> bins to be placed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> available nature-strip area meet <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant Council specificati<strong>on</strong>s.22. Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> visibility splays at <str<strong>on</strong>g>the</str<strong>on</strong>g> crossover interface with <str<strong>on</strong>g>the</str<strong>on</strong>g> footpath <strong>on</strong> Hutt<strong>on</strong>Street will ensure that appropriate safety standards for any pedestrian/vehicularc<strong>on</strong>flict are observed. This can be requested via c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval.23. Overshadowing standard within Clause 55 refers to private open space. There is no<str<strong>on</strong>g>planning</str<strong>on</strong>g> provisi<strong>on</strong> which c<strong>on</strong>trols overshadowing <str<strong>on</strong>g>of</str<strong>on</strong>g> windows. However, appropriatedaylight provisi<strong>on</strong> to existing habitable room windows is covered by <str<strong>on</strong>g>the</str<strong>on</strong>g> standards;<str<strong>on</strong>g>the</str<strong>on</strong>g> proposed development will not unreas<strong>on</strong>ably reduce daylight to adjoiningwindows (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> in later parts <str<strong>on</strong>g>of</str<strong>on</strong>g> this report).24. The proposed development will not impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> energy efficiency <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoiningdwellings as <str<strong>on</strong>g>the</str<strong>on</strong>g> development does not impact <strong>on</strong> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn solar access to anydwelling. Reduced energy efficiency to adjoining dwellings as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> reducedambient daylight to habitable room windows is not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>.25. This is not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>; however it is an accepted principle thatincreased housing density provides increased opportunity for surveillance and<str<strong>on</strong>g>the</str<strong>on</strong>g>refore increased security.26. This is not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>.Page 46


PLANNING COMMITTEE MINUTES 25 JULY 201127. This is not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> c<strong>on</strong>siderati<strong>on</strong>.28. Sufficient housing diversity is c<strong>on</strong>sidered to be made available within <str<strong>on</strong>g>the</str<strong>on</strong>g>development.PLANNING ASSESSMENTNEIGHBOURHOOD CHARACTER PRECINCT GUIDELINE ASSESSMENTThe subject site is located in an area with an inc<strong>on</strong>sistent subdivisi<strong>on</strong> pattern and diversity <str<strong>on</strong>g>of</str<strong>on</strong>g>architecture and housing styles including two-storey walk-up flats. The proposeddevelopment c<strong>on</strong>solidating <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> two sites is not c<strong>on</strong>sidered to present built-form whichis out <str<strong>on</strong>g>of</str<strong>on</strong>g> character with <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape and is comparable with existing density <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) -dwellings per site <strong>on</strong> similar sized allotments.C<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval can request <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> timber cladding in place <str<strong>on</strong>g>of</str<strong>on</strong>g> render to firstfloor walls, permeable driveway materials, high quality garage doors and appropriate level <str<strong>on</strong>g>of</str<strong>on</strong>g>canopy planting to ensure that <str<strong>on</strong>g>the</str<strong>on</strong>g> development presents well to <str<strong>on</strong>g>the</str<strong>on</strong>g> street and visuallyintegrates with some <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> period dwellings.CLAUSE 55 ASSESSMENTThe proposed development is generally compliant, or can be made to comply with Clause 55standards via c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval. The following aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development will besubject to c<strong>on</strong>diti<strong>on</strong>s to achieve compliance:• Improve manoeuvrability for <str<strong>on</strong>g>the</str<strong>on</strong>g> visitor car parking space (<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> west side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>accessway);• Habitable room windows facing <str<strong>on</strong>g>the</str<strong>on</strong>g> shared accessway provided with appropriate sillheights and landscape buffers;• Increasing <str<strong>on</strong>g>the</str<strong>on</strong>g> upper floor setback <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 from <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary to protect <str<strong>on</strong>g>the</str<strong>on</strong>g>amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining dwelling to <str<strong>on</strong>g>the</str<strong>on</strong>g> west;• Reducti<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> wall <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary associated with Unit 3 to 3metres maximum average;• Screening <str<strong>on</strong>g>of</str<strong>on</strong>g> windows <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> upper floors to prevent overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining secludedprivate open space areas and habitable room windows;• Redesign <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space areas <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 and 6 to ensure thatadequate sunlight for 25 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area is available to Unit 6; and increasein <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 5 (see table and discussi<strong>on</strong>below).Variati<strong>on</strong>s Sought• The street setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is 200mm less than <str<strong>on</strong>g>the</str<strong>on</strong>g> required setbackhowever this is c<strong>on</strong>sidered to be acceptable as <str<strong>on</strong>g>the</str<strong>on</strong>g>re is sufficient variati<strong>on</strong> in fr<strong>on</strong>tsetbacks in <str<strong>on</strong>g>the</str<strong>on</strong>g> street and <str<strong>on</strong>g>the</str<strong>on</strong>g> n<strong>on</strong>-compliance is minor.• The porch heights <str<strong>on</strong>g>of</str<strong>on</strong>g> Units 1 and 6 are slightly higher than <str<strong>on</strong>g>the</str<strong>on</strong>g> maximum <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.6 metresallowed under <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant standard; however <str<strong>on</strong>g>the</str<strong>on</strong>g> porches are proporti<strong>on</strong>al to <str<strong>on</strong>g>the</str<strong>on</strong>g>height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings and visually c<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> facades.Page 47


PLANNING COMMITTEE MINUTES 25 JULY 2011The objectives <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>se standards are c<strong>on</strong>sidered to be met.Standard B16 – Parking provisi<strong>on</strong>One car parking space is provided for each <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two bedroom dwellings.Two car parking spaces are provided for each <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> three or more bedroom dwellings with<strong>on</strong>e space under cover.One visitor car parking space is provided for every five dwellings. Manouvreability anddimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> visitor parking spaces require adjustment and can be addressed viac<strong>on</strong>diti<strong>on</strong>s.Standard B28 - Private open space provisi<strong>on</strong>Total POS Secluded POS Minimum dimensi<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> secluded POSUnit 1 105 squaremetres22 square metres 3.7 metresUnit 2 52 square metres 52 square metres 3.0 metresUnit 3 42 square metres 35 square metres 3.0 metresUnit 4 56 square metres 42 square metres 4.5 metresUnit 5 36 square metres 29 square metres 4.0 metresUnit 6 126 squaremetres45 square metres 3.0 metresAll secluded private open space areas have direct access to a living room.However, as italicised in <str<strong>on</strong>g>the</str<strong>on</strong>g> table above, Unit 1 does not achieve a secluded private openspace area <str<strong>on</strong>g>of</str<strong>on</strong>g> 25 square metres with a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres. Accordingly, <str<strong>on</strong>g>the</str<strong>on</strong>g>western wall to <str<strong>on</strong>g>the</str<strong>on</strong>g> kitchen <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 will need to be set back 4.2 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> westernboundary to achieve <str<strong>on</strong>g>the</str<strong>on</strong>g> required area.Unit 5 does not provide 40 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> private open space. The area will need to beincreased accordingly. This can be addressed via c<strong>on</strong>diti<strong>on</strong>s (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> underStandard B29).Page 48


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B29 – Solar access to open spaceSolar access is provided into <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> new dwellings asfollows:Wall Height to North Required Depth Proposed DepthUnit 1 3.3 metres 4.97 metres 5.99 metresUnit 2 5.8 metres 7.22 metres 12.2 metresUnit 3 No obstructi<strong>on</strong> N/A N/AUnit 4 No obstructi<strong>on</strong> N/A N/AUnit 5 3.4 metres 5.06 metres 7.27 metres*Unit 614 square metres hasno obstructi<strong>on</strong>; 6.2metre high wall for <str<strong>on</strong>g>the</str<strong>on</strong>g>remainder7.58 metres 3 metres* Requires modificati<strong>on</strong> to assist compliance with Unit 6’s access to north sunlight (see assessmentbelow)The depths outlined above for Units 1-5 apply to an area <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space <str<strong>on</strong>g>of</str<strong>on</strong>g>no less than 25 square metres with a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.0 square metres and complywith <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.However, <strong>on</strong>ly 14 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6’s secluded private open space area complies with<str<strong>on</strong>g>the</str<strong>on</strong>g> standard, and this area needs to be increased to 25 square metres. This can beachieved if a 5 metre x 5 metre area to <str<strong>on</strong>g>the</str<strong>on</strong>g> north side <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6’s garage is created. This willrequire <str<strong>on</strong>g>the</str<strong>on</strong>g> following changes to Unit 5:• The south-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 (at ground floor) set back 5 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> easternboundary, and 5 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> north wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6;• The internal boundary fence between <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space areas <str<strong>on</strong>g>of</str<strong>on</strong>g> Units 5and 6 repositi<strong>on</strong>ed to reflect <str<strong>on</strong>g>the</str<strong>on</strong>g> above.• Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 25 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space for Unit 5 (4 metres x6.25 metres) achieved through setting <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> laundry fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r northand a reducti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> laundry area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5.• The first floor eastern wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Bedroom 2 in Unit 5 set back 5 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> easternboundary to allow <str<strong>on</strong>g>the</str<strong>on</strong>g> required solar access to <str<strong>on</strong>g>the</str<strong>on</strong>g> modified secluded private openspace area for Unit 6.POLICY IMPLICATIONSEnvir<strong>on</strong>mental SustainabilityAll new dwellings are required to achieve a minimum six (6) star energy rating under <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant building c<strong>on</strong>trols.Social Inclusi<strong>on</strong> and DiversityNil.Page 49


PLANNING COMMITTEE MINUTES 25 JULY 2011O<str<strong>on</strong>g>the</str<strong>on</strong>g>rNil.FINANCIAL AND RESOURCE IMPLICATIONSThere are no financial or resource implicati<strong>on</strong>s as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> determinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thisapplicati<strong>on</strong>.FUTURE ACTIONSNil.DISCLOSURE OF INTERESTSSecti<strong>on</strong> 80C <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Local Government Act 1989 requires members <str<strong>on</strong>g>of</str<strong>on</strong>g> Council staff andpers<strong>on</strong>s engaged under c<strong>on</strong>tract to provide advice to Council to disclose any direct orindirect interest in a matter to which <str<strong>on</strong>g>the</str<strong>on</strong>g> advice relates.The Manager authorising this report, having made enquiries with relevant members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,reports that no disclosable interests have been raised in relati<strong>on</strong> to this report.RELATED DOCUMENTS<strong>Darebin</strong> Planning Scheme and <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act (1987) as amended.COMMITTEE DECISIONMOVED:SECONDED:Cr. N. KatsisCr. T. LaurenceTHAT Planning Permit Applicati<strong>on</strong> D/227/2009 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong> to Grant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority. The plans must be drawn to scale with dimensi<strong>on</strong>sand must be generally in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g>applicati<strong>on</strong> (identified as Ground Floor Plan A-1, First Floor Plan A-2,Elevati<strong>on</strong>s A-3 revised 26.11.2010, prepared by Architectural Plans andPermits and received by Council <strong>on</strong> 10 December 2010) but modified toshow:a) The visitor parking space between Unit 2 and Unit 3 increased inwidth to 3.5 metres by a relocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2’s nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall or Unit 3’ssou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall, or a relocati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both walls as necessary but withoutPage 50


PLANNING COMMITTEE MINUTES 25 JULY 2011increasing <str<strong>on</strong>g>the</str<strong>on</strong>g> building footprint or reducing any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remainingsetbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r dwelling.b) The eastern kitchen wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 relocated to align with <str<strong>on</strong>g>the</str<strong>on</strong>g> easternentry and staircase wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 to allow sufficient manoeuvrabilityfor <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining visitor car parking space and a <strong>on</strong>e (1) metre widelandscape buffer in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> relocated eastern wall.c) The existing western crossover servicing Unit 1 realigned to match<str<strong>on</strong>g>the</str<strong>on</strong>g> accessway locati<strong>on</strong>.d) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pedestrian visibility splays measuring 2.0 metres(width across <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage) by 2.5 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to <str<strong>on</strong>g>the</str<strong>on</strong>g>eastern and western sides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed and existing crossovers toHutt<strong>on</strong> Street. Where within <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site, any structures orvegetati<strong>on</strong> within <str<strong>on</strong>g>the</str<strong>on</strong>g>se splays must be not more than 1.15 metres inheight.e) A notati<strong>on</strong> indicating <str<strong>on</strong>g>the</str<strong>on</strong>g> extent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> rear right <str<strong>on</strong>g>of</str<strong>on</strong>g>way (refer to C<strong>on</strong>diti<strong>on</strong> No.19 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).f) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> high quality garage doors to Unit 1 and Unit 6,including full specificati<strong>on</strong>s, that blend in with <str<strong>on</strong>g>the</str<strong>on</strong>g> colour and materialsscheme <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 6.g) The specificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> timber cladding to <str<strong>on</strong>g>the</str<strong>on</strong>g> first floor walls <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1and Unit 6.h) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> permeable paving to <str<strong>on</strong>g>the</str<strong>on</strong>g> driveways <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 6;and <str<strong>on</strong>g>the</str<strong>on</strong>g> visitor car parking space hardstands <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.i) A setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 metre between <str<strong>on</strong>g>the</str<strong>on</strong>g> shared accessway and <str<strong>on</strong>g>the</str<strong>on</strong>g> westernwall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5.j) The western kitchen windows <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 with a minimum sill height <str<strong>on</strong>g>of</str<strong>on</strong>g>1.4 metres above <str<strong>on</strong>g>the</str<strong>on</strong>g> accessway.k) The setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Bedroom 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 4 from <str<strong>on</strong>g>the</str<strong>on</strong>g>nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary corrected to show approximately 4.8 metres.l) The setback <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3’s first floor walls from <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundaryincreased to 3 metres for <str<strong>on</strong>g>the</str<strong>on</strong>g> bathroom and 3.5 metres for Bedroom2, without an increase in <str<strong>on</strong>g>the</str<strong>on</strong>g> footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling and without areducti<strong>on</strong> to any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r setbacks from <str<strong>on</strong>g>the</str<strong>on</strong>g> boundaries.m) The finished first floor levels <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings, to Australian HeightDatum (AHD).n) The western ground floor wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 (meals and laundry) reducedin height to 3 metres maximum average, with no part exceeding aheight <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.6 metres above natural ground level.o) The windows listed below provided with ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:- A sill with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floorlevel,- A fixed screen with a maximum permeability <str<strong>on</strong>g>of</str<strong>on</strong>g> 25% to aminimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floor level or- Fixed obscure glazing (not film) to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7metres above finished floor level.Page 51


PLANNING COMMITTEE MINUTES 25 JULY 2011Where fixed screens are being utilised a secti<strong>on</strong> diagram must beincluded to dem<strong>on</strong>strate how <str<strong>on</strong>g>the</str<strong>on</strong>g> screens minimise overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g>adjoining properties:• Unit 1 – west facing Bedroom 1 window• Unit 2 – west facing Bedroom 2 window• Unit 3 – north-facing (both) Bedroom 2 windows• Unit 4 – north-facing Bedroom 1 & Bedroom 2 windows• Unit 5 – east facing Bedroom 2 windowp) The width <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1increased by from 3.7 metres to 4.2 metres, providing a secludedprivate open space area 25 square metres minimum, measuring 4.20metres x 5.99 metres.q) The secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6 modified to providean area measuring 5 metre x 5 metre as measured from <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>astcorner <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6, resulting in a partial deleti<strong>on</strong>/modificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>south-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5.r) The eastern wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Bedroom 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 5 with a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 5 metresfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> eastern boundary to provide solar access to <str<strong>on</strong>g>the</str<strong>on</strong>g> secludedprivate open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 6 in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong>s<str<strong>on</strong>g>of</str<strong>on</strong>g> Clause 55.05-5 (Standard B29) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.s) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space area to Unit 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> 25square metres with a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres; and an overallprivate open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> 40 square metres minimum.t) The height <str<strong>on</strong>g>of</str<strong>on</strong>g> fences <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn, eastern and westernboundaries (except within 6.5 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>land) to be a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.8 metres as measured abovenatural ground level.Where necessary, <str<strong>on</strong>g>the</str<strong>on</strong>g> fence height may be increased by raising <str<strong>on</strong>g>the</str<strong>on</strong>g>height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fence or by <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> free-standing, selfsupporting trellis adjacent <str<strong>on</strong>g>the</str<strong>on</strong>g> fence to <str<strong>on</strong>g>the</str<strong>on</strong>g> required height. If utilised,such trellis must be a maximum <str<strong>on</strong>g>of</str<strong>on</strong>g> 25% open and be fixed,permanent, durable and coloured or painted to blend with <str<strong>on</strong>g>the</str<strong>on</strong>g>development.u) A landscape plan in accordance with C<strong>on</strong>diti<strong>on</strong> No. 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.v) Modificati<strong>on</strong>s in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> Sustainable Design Statement(refer to C<strong>on</strong>diti<strong>on</strong> No. 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).w) A comprehensive schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> materials, externalfinishes and colours (including colour samples).When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.2. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be alteredwithout <str<strong>on</strong>g>the</str<strong>on</strong>g> prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.3. This Permit will expire if ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date<str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit; orPage 52


PLANNING COMMITTEE MINUTES 25 JULY 2011• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g>this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request ismade in writing before this Permit expires or within three (3) m<strong>on</strong>ths after<str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.4. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any worksauthorised by this permit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong>Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development levy for each charge unit must becalculated in accordance with Schedule 1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong>Plan Overlay.5. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority must be submitted to, andapproved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan isapproved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>n form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. TheLandscape Plan must be prepared by a suitably qualified pers<strong>on</strong> and mustincorporate:a) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e (1) medium canopy tree within <str<strong>on</strong>g>the</str<strong>on</strong>g>secluded private open space area <str<strong>on</strong>g>of</str<strong>on</strong>g> each dwelling, with a minimumheight <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2) metres and <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimumheight <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5 metres at maturityb) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) medium canopy trees within <str<strong>on</strong>g>the</str<strong>on</strong>g>fr<strong>on</strong>t setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2)metres and <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5metres at maturityc) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to beremoved, including overhanging trees <strong>on</strong> adjoining properties. Thegenus, species, height and spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specifiedd) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanicalname, comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plantse) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds andhard paving (such as asphalt, c<strong>on</strong>crete, brick or gravel)f) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyg) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbagebin receptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etch) Edge treatment between grass (lawn) and garden bedsi) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g>locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g>buildings <strong>on</strong> adjoining land, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows anddoors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site must also be shownj) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead andunderground services. C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existingand proposed planting must be avoidedk) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbersl) A scale, North Point and appropriate legend.Page 53


PLANNING COMMITTEE MINUTES 25 JULY 2011The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.6. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, a Sustainable Design Statement detailingsustainable design strategies to be incorporated into <str<strong>on</strong>g>the</str<strong>on</strong>g> development to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority must be submitted to, andapproved in writing by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. The sustainable designstatement must outline proposed sustainable design initiatives within <str<strong>on</strong>g>the</str<strong>on</strong>g>development such as (but not limited to) energy efficiency, waterc<strong>on</strong>servati<strong>on</strong>, stormwater quality, waste management and materialselecti<strong>on</strong>.The development must be c<strong>on</strong>structed in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>requirements/ recommendati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Sustainable Design Statement to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must becompleted to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g>development is occupied and/or <str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as isapproved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority in writing.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g>permit holder must advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping hasbeen completed.8. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must bemaintained, and any dead, diseased or damaged plant replaced inaccordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.9. Floor levels shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must be c<strong>on</strong>firmed. Thec<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g>time <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g>Building Act 1993 and <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Regulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong>must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a report from a licensed land surveyor and must besubmitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority no later than 7 days from <str<strong>on</strong>g>the</str<strong>on</strong>g> date<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels must be c<strong>on</strong>firmedbefore a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensedland surveyor submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. All dwellings that share dividing walls and/or floors must be c<strong>on</strong>structed tolimit noise transmissi<strong>on</strong> in accordance with Part F(5) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Code<str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.11. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting systemcapable <str<strong>on</strong>g>of</str<strong>on</strong>g> illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage andcar parking space and all pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.The external lighting must be designed, baffled and/or located to ensurethat no loss <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.12. Boundary walls facing adjoining properties must be cleaned and finished to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Page 54


PLANNING COMMITTEE MINUTES 25 JULY 201114. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes,fixtures, fittings and vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must bec<strong>on</strong>cealed in service ducts or o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.15. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than thoseshown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles fornewspapers to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.17. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g>vehicles and access lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> plans;c) Surfaced with an all wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r sealcoat; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plansmust not be used for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.18. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied, vehicular crossing(s) must bec<strong>on</strong>structed to align with approved driveways to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority. All redundant crossing(s) or crossing opening(s)must be removed and replaced with footpath, naturestrip and kerb andchannel to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.19. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development:a) Plans detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> and surfacing including drainage <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> right <str<strong>on</strong>g>of</str<strong>on</strong>g> way abutting <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property,commencing from <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> property at No.26Hutt<strong>on</strong> Street and c<strong>on</strong>tinuing west to <str<strong>on</strong>g>the</str<strong>on</strong>g> north-west corner alignment<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land (30 Hutt<strong>on</strong> Street), must be submitted to andapproved by Council.b) The right <str<strong>on</strong>g>of</str<strong>on</strong>g> way to abutting <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyand No.26 Hutt<strong>on</strong> Street, commencing from <str<strong>on</strong>g>the</str<strong>on</strong>g> north-east corner <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> property at No.26 Hutt<strong>on</strong> Street and c<strong>on</strong>tinuing west to <str<strong>on</strong>g>the</str<strong>on</strong>g> northwestcorner alignment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject land (30 Hutt<strong>on</strong> Street) must bec<strong>on</strong>structed and surfaced in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> approved plans.All works must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> resp<strong>on</strong>sible authority.CARRIEDPage 55


PLANNING COMMITTEE MINUTES 25 JULY 20115.4 APPLICATION FOR PLANNING PERMIT D/791/201050 Arthurt<strong>on</strong> Road, NorthcoteAUTHOR:DIRECTOR:Principal Statutory Planner – John LimbachDirector <strong>City</strong> Works and Development – Michael BallockOWNER/APPLICANT/CONSULTANT:Applicant:Eco-Urban Design StudioSuite 2 - Level 1, 28 Young StMOONEE PONDS VIC 3039Owner:Sue Heng Chhor84 Woolnough DrMILL PARK VIC 3082SUMMARY:• The proposal is for a medium density housing development comprising <str<strong>on</strong>g>the</str<strong>on</strong>g>c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) double storey dwellings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> an existing dwelling andpartial demoliti<strong>on</strong> and a single storey extensi<strong>on</strong> to an existing dwelling <strong>on</strong> land affectedby a Heritage Overlay (HO166) and a Special Building Overlay (SBO).• The maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is 6.45 metres above natural ground level.• The proposed dwellings are two (2) bedroom dwellings with <strong>on</strong>e (1) car parking spaceeach and <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling is to have three (3) bedrooms with two (2) car parkingspaces.• All vehicular access is proposed to be from <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-way (ROW).• There is no covenant registered <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title.• Recommendati<strong>on</strong> – that Planning Permit Applicati<strong>on</strong> D/791/2010 be approved and aNotice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> to Grant a Permit be issued subject to c<strong>on</strong>diti<strong>on</strong>s.CONSULTATION:• Notificati<strong>on</strong> occurred via letter to adjoining and surrounding owners and occupiers and<str<strong>on</strong>g>the</str<strong>on</strong>g> posting <str<strong>on</strong>g>of</str<strong>on</strong>g> a notice <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.• Notificati<strong>on</strong> occurred via letter to adjoining and surrounding owners and occupiers after<str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> was amended under Secti<strong>on</strong> 57(A) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>mentAct.• Seven (7) objecti<strong>on</strong>s were received.• A c<strong>on</strong>sultati<strong>on</strong> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> has not been <str<strong>on</strong>g>held</str<strong>on</strong>g> as it was not c<strong>on</strong>sidered likely that aresoluti<strong>on</strong> would be reached.Page 56


PLANNING COMMITTEE MINUTES 25 JULY 2011• The applicati<strong>on</strong> has been referred to <str<strong>on</strong>g>the</str<strong>on</strong>g> following Council units:- ESD Officer.- Heritage Adviser.- Transport Management Unit.- Capital Works Units.• The applicati<strong>on</strong> has been referred to <str<strong>on</strong>g>the</str<strong>on</strong>g> following referral authorities:- Melbourne Water.RECOMMENDATIONTHAT Planning Permit Applicati<strong>on</strong> D/791/2010 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> toGrant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. Theplans must be drawn to scale with dimensi<strong>on</strong>s and must be generally in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> (identified as drawing numbers TP03 andTP04, prepared by eo-urban and dated 18.10.2010) but modified to show:a) Access to <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaped light court to Unit 4.b) Modificati<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> plan to detail a hipped ro<str<strong>on</strong>g>of</str<strong>on</strong>g> form over <str<strong>on</strong>g>the</str<strong>on</strong>g> proposedensuites to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling to accord with <str<strong>on</strong>g>the</str<strong>on</strong>g> floor plan and elevati<strong>on</strong>.c) The south wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ensuite to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling to be set back a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g>2 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall <str<strong>on</strong>g>of</str<strong>on</strong>g> that dwelling (not including <str<strong>on</strong>g>the</str<strong>on</strong>g> porch).d) The visible secti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> chimney breast, to <str<strong>on</strong>g>the</str<strong>on</strong>g> west <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling,are to have <str<strong>on</strong>g>the</str<strong>on</strong>g> paint removed.e) Modificati<strong>on</strong>s in accordance with recommendati<strong>on</strong>s included within <str<strong>on</strong>g>the</str<strong>on</strong>g>Arboricultural report (refer to C<strong>on</strong>diti<strong>on</strong> No. 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).f) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pedestrian visibility splays measuring 2 metres (width across <str<strong>on</strong>g>the</str<strong>on</strong>g>fr<strong>on</strong>tage) by 2.50 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to both sides <str<strong>on</strong>g>of</str<strong>on</strong>g> each driveway to<str<strong>on</strong>g>the</str<strong>on</strong>g> right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-way (ROW), excluding <str<strong>on</strong>g>the</str<strong>on</strong>g> south side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> driveway to <str<strong>on</strong>g>the</str<strong>on</strong>g> existingdwelling. A notati<strong>on</strong> must state that where within <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site, any structuresor vegetati<strong>on</strong> within this splay must be not more than 1.15 metres in height.g) Bin storage areas must be removed from within <str<strong>on</strong>g>the</str<strong>on</strong>g> car parking areas <str<strong>on</strong>g>of</str<strong>on</strong>g> allgarages and carports.h) The pedestrian doors to Unit 2, Unit 3 and Unit 4 to be modified so as not toopen into <str<strong>on</strong>g>the</str<strong>on</strong>g> car parking areas or each garage.i) Removal <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 1.80 metre high fence between <str<strong>on</strong>g>the</str<strong>on</strong>g> driveways <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit2.j) Replacement <str<strong>on</strong>g>of</str<strong>on</strong>g> landscaping with paved vehicle access splays measuring 1metres (width across <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage) by 1.50 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to <str<strong>on</strong>g>the</str<strong>on</strong>g>nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn sides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> driveways to Unit 1 and Unit 4 and both sides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>driveways to Unit 2 and Unit 3.Page 57


PLANNING COMMITTEE MINUTES 25 JULY 2011k) Locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> water tanks and a notati<strong>on</strong> that <str<strong>on</strong>g>the</str<strong>on</strong>g>y are to be permanently c<strong>on</strong>nectedto toilets for flushing.l) A Landscape Plan in accordance with C<strong>on</strong>diti<strong>on</strong> No. 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.m) A comprehensive schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> external materials, colours and finishes (includingcolour samples). C<strong>on</strong>structi<strong>on</strong> materials are to be low maintenance. Externalmaterials and finishes (including glazing) are to be <str<strong>on</strong>g>of</str<strong>on</strong>g> a low reflectivity level. Theuse <str<strong>on</strong>g>of</str<strong>on</strong>g> painted surfaces, such as render, must be minimised.n) Elevati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed letter boxes.o) Re-locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> external storage to Unit 1, <str<strong>on</strong>g>the</str<strong>on</strong>g> storage is to set back aminimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 500mm from <str<strong>on</strong>g>the</str<strong>on</strong>g> car port <str<strong>on</strong>g>of</str<strong>on</strong>g> that dwelling.p) The dividing fence between <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor private open space <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 andUnit 3 to have a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.80 metres.q) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> all plant and equipment (including air c<strong>on</strong>diti<strong>on</strong>ers and <str<strong>on</strong>g>the</str<strong>on</strong>g> like).These are to be co-located where possible, screened to as not to be visible from<str<strong>on</strong>g>the</str<strong>on</strong>g> public realm and adjacent properties, located as far as practicable from siteboundaries, baffled to prevent noise transmissi<strong>on</strong> to adjacent properties andintegrated into <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building.When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.2. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be altered without <str<strong>on</strong>g>the</str<strong>on</strong>g>prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.3. This Permit will expire if ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> thisPermit; or• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request is made inwriting before this Permit expires or within three (3) m<strong>on</strong>ths after <str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.4. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any works authorised by thispermit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong> Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>development levy for each charge unit must be calculated in accordance with Schedule1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong> Plan Overlay.5. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan is approved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>nform part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. The Landscape Plan must be prepared by a suitably qualifiedpers<strong>on</strong> and must incorporate:a) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to be removed,including overhanging trees <strong>on</strong> adjoining properties. The genus, species, heightand spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specifiedb) Modificati<strong>on</strong>s in accordance with recommendati<strong>on</strong>s included within <str<strong>on</strong>g>the</str<strong>on</strong>g>Arboricultural report (refer to C<strong>on</strong>diti<strong>on</strong> No. 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit).c) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanical name,comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plantsd) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds and hard paving(such as asphalt, c<strong>on</strong>crete, brick or gravel)Page 58


PLANNING COMMITTEE MINUTES 25 JULY 2011e) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyf) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbage binreceptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etcg) Edge treatment between grass (lawn) and garden bedsh) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings <strong>on</strong> adjoiningland, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows and doors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject sitemust also be showni) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead and underground services.C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed planting must beavoidedj) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbersk) A scale, North Point and appropriate legend.The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.6. Before buildings and works start, an Arboricultural report prepared by a qualifiedarborist to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority must be submitted to, andapproved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. The Arboricultural report must detail existingtrees <strong>on</strong> adjoining properties, <str<strong>on</strong>g>the</str<strong>on</strong>g> impact <str<strong>on</strong>g>the</str<strong>on</strong>g> development is likely to have <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>setrees and tree protecti<strong>on</strong> measures, including tree protecti<strong>on</strong> z<strong>on</strong>es if required.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be completed to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied and/or<str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as is approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority inwriting.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g> permit holdermust advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping has been completed.8. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be maintained, andany dead, diseased or damaged plant replaced in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsedLandscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.9. Floor levels shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must be c<strong>on</strong>firmed. The c<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Act 1993 and <str<strong>on</strong>g>the</str<strong>on</strong>g> BuildingRegulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong> must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a report from a licensedland surveyor and must be submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority no later than 7 daysfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels must be c<strong>on</strong>firmedbefore a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensed land surveyorsubmitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting system capable <str<strong>on</strong>g>of</str<strong>on</strong>g>illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage and car parking space andall pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.The external lighting must be designed, baffled and/or located to ensure that no loss <str<strong>on</strong>g>of</str<strong>on</strong>g>amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority.Page 59


PLANNING COMMITTEE MINUTES 25 JULY 201111. Boundary walls facing adjoining properties must be cleaned and finished to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.12. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes, fixtures, fittingsand vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must be c<strong>on</strong>cealed in service ducts oro<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.14. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than those shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> priorwritten c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.15. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles for newspapers to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g> vehicles andaccess lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>plans;c) Surfaced; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not beused for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.17. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied, vehicular crossing(s) must be c<strong>on</strong>structed to alignwith approved driveways to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. All redundantcrossing(s) or crossing opening(s) must be removed and replaced with footpath,naturestrip and kerb and channel to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Melbourne Water C<strong>on</strong>diti<strong>on</strong>s (C<strong>on</strong>diti<strong>on</strong> No. 18 – 22)18. No polluted and/or sediment laden run<str<strong>on</strong>g>of</str<strong>on</strong>g>f is to be discharged directly or indirectly in toMelbourne Water’s drains or watercourses.19. The dwellings must be c<strong>on</strong>structed with finished floor levels a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 300mmabove <str<strong>on</strong>g>the</str<strong>on</strong>g> applicable flood level.20. The garages must be c<strong>on</strong>structed with finished surface levels a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 150mmabove <str<strong>on</strong>g>the</str<strong>on</strong>g> applicable flood level.21. The extended ground floor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling must be c<strong>on</strong>structed no lower than<str<strong>on</strong>g>the</str<strong>on</strong>g> existing ground floor level.22. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy, a certified survey plan, showingfinished floor levels (as c<strong>on</strong>structed) reduced to <str<strong>on</strong>g>the</str<strong>on</strong>g> Australian Height Datum, must besubmitted to Melbourne Water to dem<strong>on</strong>strate that <str<strong>on</strong>g>the</str<strong>on</strong>g> floor levels have beenc<strong>on</strong>structed in accordance with Melbourne Water’s requirements.Page 60


PLANNING COMMITTEE MINUTES 25 JULY 2011REPORTINTRODUCTION AND BACKGROUNDApplicati<strong>on</strong> for Planning Permit D791/10 was received by Council <strong>on</strong> 29 October 2010.The applicati<strong>on</strong> was amended under Secti<strong>on</strong> 57(A) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act.The amendments include:- Modificati<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> design and footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> alterati<strong>on</strong>s and additi<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> existingdwelling.- Redesign <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings.- An increase in <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary setbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings.- A reducti<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> eastern boundary setbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings.ISSUES AND DISCUSSIONSubject site and surrounding area• The site is irregular in shape and made up <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2) lots with a combined fr<strong>on</strong>tage <str<strong>on</strong>g>of</str<strong>on</strong>g>15.24 metres, a depth <str<strong>on</strong>g>of</str<strong>on</strong>g> 44.19 metres and an area <str<strong>on</strong>g>of</str<strong>on</strong>g> 671 square metres. The sitehas a splay in <str<strong>on</strong>g>the</str<strong>on</strong>g> north eastern corner.• The site is located in <str<strong>on</strong>g>the</str<strong>on</strong>g> Residential 1 Z<strong>on</strong>e and is affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> Heritage Overlay(HO166) and <str<strong>on</strong>g>the</str<strong>on</strong>g> Special Building Overlay (SBO).• The site is located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> north side <str<strong>on</strong>g>of</str<strong>on</strong>g> Arthurt<strong>on</strong> road, to <str<strong>on</strong>g>the</str<strong>on</strong>g> west <str<strong>on</strong>g>of</str<strong>on</strong>g> Latham Street,Northcote.• The site is occupied by a single storey, wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard, Edwardian style dwelling withsecluded private open space and outbuildings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.• The adjoining property to <str<strong>on</strong>g>the</str<strong>on</strong>g> west is occupied by a single storey, brick dwelling withsecluded private open space and outbuildings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.• The site adjoins a ROW to <str<strong>on</strong>g>the</str<strong>on</strong>g> north and east.• To <str<strong>on</strong>g>the</str<strong>on</strong>g> north <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site, <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> opposite side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW, are a number <str<strong>on</strong>g>of</str<strong>on</strong>g> residentialproperties occupied by single storey dwellings that fr<strong>on</strong>t Elm Street.• To <str<strong>on</strong>g>the</str<strong>on</strong>g> east <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site, <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> opposite side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW, are a number <str<strong>on</strong>g>of</str<strong>on</strong>g> residentialproperties occupied by single storey and double storey dwellings that fr<strong>on</strong>t LathamStreet.• The area is characterised by single and double storey dwellings, with many Victorianand Edwardian style dwellings present, as well as Post-War style infill.• The site is located adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> Northcote Major Activity Centre.• The site is located adjacent to a bus stop (Route 508), approximately 100 metres toNorthcote Train Stati<strong>on</strong>, 380 metres to <str<strong>on</strong>g>the</str<strong>on</strong>g> tram line <strong>on</strong> High Street (Route 96), 450metres to <str<strong>on</strong>g>the</str<strong>on</strong>g> tram line <strong>on</strong> St Georges Road (Routes 112 and 11) and approximately250 metres to Batman Park.Page 61


PLANNING COMMITTEE MINUTES 25 JULY 2011Proposal• The proposal is for a medium density housing development comprising <str<strong>on</strong>g>the</str<strong>on</strong>g>c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) double storey dwellings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> an existing dwelling andpartial demoliti<strong>on</strong> and a single storey extensi<strong>on</strong> to an existing dwelling <strong>on</strong> land affectedby a Heritage Overlay (HO166) and a Special Building Overlay (SBO).• The maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is 6.45 metres above natural ground level.• The proposed dwellings are all two (2) bedroom dwellings with <strong>on</strong>e (1) car parkingspace each and <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling is to have three (3) bedrooms with two (2) carparking spaces.• All vehicular access is proposed to be from <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining right-<str<strong>on</strong>g>of</str<strong>on</strong>g>-way (ROW).• The dwellings have access to <str<strong>on</strong>g>the</str<strong>on</strong>g> following areas <str<strong>on</strong>g>of</str<strong>on</strong>g> private open space:Private open space Secluded POS No <str<strong>on</strong>g>of</str<strong>on</strong>g> bedrooms(POS)Unit 1 (existing) 188.37m² 35.34m² 3Unit 2 25.57m² 9m² 2Unit 3 25.62m² 9m² 2Unit 4 8.30m² 8.30m² 2OBJECTIONS• Seven (7) objecti<strong>on</strong>s have been received.Objecti<strong>on</strong>s summarised• Density• Neighbourhood character• Height and form• Traffic and car parking• Impact <strong>on</strong> heritage overlay• Site coverage• Permeability• Energy efficiency• Side and rear setbacks• Walls <strong>on</strong> boundaries• North facing windows• Safety• Overlooking• Overshadowing• Noise• Accessibility• Dwelling entryPage 62


PLANNING COMMITTEE MINUTES 25 JULY 2011• Private open space• Solar access to open space• Storage• Design detail• Site services• Property value• C<strong>on</strong>structi<strong>on</strong>• Use <str<strong>on</strong>g>of</str<strong>on</strong>g> laneway as access for vehicles• Impact <strong>on</strong> trees.Officer comment <strong>on</strong> summarised objecti<strong>on</strong>s• The development accords with acknowledged policy for urban c<strong>on</strong>solidati<strong>on</strong> andincreased densities.• Neighbourhood character, height and form and design detail are addressed within <str<strong>on</strong>g>the</str<strong>on</strong>g>assessment secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> this report with particular focus <strong>on</strong> Clause 55 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong>Planning Scheme and <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant Neighbourhood Character Precinct Guidelines.• Council’s Heritage Advisor has no objecti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal, subject to a c<strong>on</strong>diti<strong>on</strong>requiring <str<strong>on</strong>g>the</str<strong>on</strong>g> south wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ensuite to be a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 2 metres north <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> southwestcorner <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> house (<str<strong>on</strong>g>the</str<strong>on</strong>g> wall not <str<strong>on</strong>g>the</str<strong>on</strong>g> porch) and <str<strong>on</strong>g>the</str<strong>on</strong>g> paint removed from <str<strong>on</strong>g>the</str<strong>on</strong>g>visible secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing chimney breast.• It is not c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> increase in traffic from <str<strong>on</strong>g>the</str<strong>on</strong>g> subject development wouldplace an unreas<strong>on</strong>able load <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding street network. Additi<strong>on</strong>ally, noobjecti<strong>on</strong>s have been raised from <str<strong>on</strong>g>the</str<strong>on</strong>g> Transport Management and Planning Unitregarding traffic <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> local street network.• Although amenity may be affected (overlooking, overshadowing, side and rearsetbacks, walls <strong>on</strong> boundaries, north facing windows) by <str<strong>on</strong>g>the</str<strong>on</strong>g> development, anassessment under Clause 55 provides an indicator as to whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>the</str<strong>on</strong>g>se effects areunreas<strong>on</strong>able or not. In this instance <str<strong>on</strong>g>the</str<strong>on</strong>g> development will not create an unreas<strong>on</strong>ableeffect and is <str<strong>on</strong>g>the</str<strong>on</strong>g>refore acceptable.• Site coverage, permeability, energy efficiency, safety, accessibility, car parking andaccess, dwelling entry, private open space, solar access to private open space,storage and site services will be discussed in <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment secti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> this report,with a particular focus <strong>on</strong> Clause 55 <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme.• The proposed residential use will have noise impacts c<strong>on</strong>sistent with those normal to aresidential z<strong>on</strong>e. Speech, laughter, music etc. are noises associated with people living<str<strong>on</strong>g>the</str<strong>on</strong>g>ir lives and are all part <str<strong>on</strong>g>of</str<strong>on</strong>g> life in an urban area.• Property values are speculative and not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> matter.• The c<strong>on</strong>structi<strong>on</strong> process is not a <str<strong>on</strong>g>planning</str<strong>on</strong>g> matter and is subject to relevant Council,industry and Envir<strong>on</strong>mental Protecti<strong>on</strong> Authority (EPA) regulati<strong>on</strong>s.• The Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title shows that <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site has a legal right <str<strong>on</strong>g>of</str<strong>on</strong>g> carriageway over<str<strong>on</strong>g>the</str<strong>on</strong>g> ROW. Council’s Transport Management Unit has no objecti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> proposalsubject to c<strong>on</strong>diti<strong>on</strong>s requiring modificati<strong>on</strong>s to improve manoeuvrability.Page 63


PLANNING COMMITTEE MINUTES 25 JULY 2011• C<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require an arborist report and modificati<strong>on</strong>s inaccordance with recommendati<strong>on</strong>s c<strong>on</strong>tained within <str<strong>on</strong>g>the</str<strong>on</strong>g> report, in order to protect trees<strong>on</strong> adjoining properties.PLANNING ASSESSMENTActivity Centres – Clause 22.03Whilst not within a precinct, <str<strong>on</strong>g>the</str<strong>on</strong>g> site is located directly adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> Northcote MajorActivity Centre. The proposal is c<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> objectives <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Northcote Major ActivityCentre as follows:• To encourage increased residential development throughout <str<strong>on</strong>g>the</str<strong>on</strong>g> Activity Centre.• To encourage a range <str<strong>on</strong>g>of</str<strong>on</strong>g> housing types and forms.Heritage Overlay – Clause 43.01The site is affected by a Heritage Overlay (HO166) and is c<strong>on</strong>sidered a Significant HeritagePlace in <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Heritage Review 2000, Volume 1. The site is located within <str<strong>on</strong>g>the</str<strong>on</strong>g>Northcote-Croxt<strong>on</strong> Heritage Precinct.Statement <str<strong>on</strong>g>of</str<strong>on</strong>g> SignificanceThe Northcote-Croxt<strong>on</strong> Area was sold <str<strong>on</strong>g>of</str<strong>on</strong>g>f by <str<strong>on</strong>g>the</str<strong>on</strong>g> Crown in 1839-40 and occupied in smallrural holdings until <str<strong>on</strong>g>the</str<strong>on</strong>g> Land Boom with <str<strong>on</strong>g>the</str<strong>on</strong>g> sale <str<strong>on</strong>g>of</str<strong>on</strong>g> blocks commencing in 1885. Thec<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> houses, however, lagged behind with <str<strong>on</strong>g>the</str<strong>on</strong>g> greatest number <str<strong>on</strong>g>of</str<strong>on</strong>g> survivingc<strong>on</strong>tributory houses being built during <str<strong>on</strong>g>the</str<strong>on</strong>g> first two decades <str<strong>on</strong>g>of</str<strong>on</strong>g> this century. The Area ishistorically and aes<str<strong>on</strong>g>the</str<strong>on</strong>g>tically important.It is historically important (Criteri<strong>on</strong> A4) for its capacity to dem<strong>on</strong>strate <str<strong>on</strong>g>the</str<strong>on</strong>g> growth <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>locale during <str<strong>on</strong>g>the</str<strong>on</strong>g> late Victorian Land Boom and more particularly during <str<strong>on</strong>g>the</str<strong>on</strong>g> period <str<strong>on</strong>g>of</str<strong>on</strong>g>ec<strong>on</strong>omic recovery following Federati<strong>on</strong> in 1901. It is aes<str<strong>on</strong>g>the</str<strong>on</strong>g>tically important (Criteri<strong>on</strong> E1) asa predominantly Post-Federati<strong>on</strong> period residential area, having some representati<strong>on</strong> from<str<strong>on</strong>g>the</str<strong>on</strong>g> late Victorian Land Boom and <str<strong>on</strong>g>the</str<strong>on</strong>g> Inter-War years. This importance is enhanced by <str<strong>on</strong>g>the</str<strong>on</strong>g>range <str<strong>on</strong>g>of</str<strong>on</strong>g> dwellings including artisans’ cottages to <str<strong>on</strong>g>the</str<strong>on</strong>g> north and more opulent andaes<str<strong>on</strong>g>the</str<strong>on</strong>g>tically diverse timber houses to <str<strong>on</strong>g>the</str<strong>on</strong>g> south especially in Hawthorn Road and Harringt<strong>on</strong>Street, facing <str<strong>on</strong>g>the</str<strong>on</strong>g> railway reserve and Croxt<strong>on</strong> stati<strong>on</strong> buildings. Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rmore, <str<strong>on</strong>g>the</str<strong>on</strong>g> high levels<str<strong>on</strong>g>of</str<strong>on</strong>g> integrity shore up <str<strong>on</strong>g>the</str<strong>on</strong>g> Area’s cultural values and are especially apparent in Elm Street andArthurt<strong>on</strong> Road facing Batman Park and al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> St. Georges Road fr<strong>on</strong>tage.It is c<strong>on</strong>sidered that <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal respects <str<strong>on</strong>g>the</str<strong>on</strong>g> significance and character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Northcote-Croxt<strong>on</strong> Heritage Precinct. The existing dwelling is to be largely retained and <str<strong>on</strong>g>the</str<strong>on</strong>g> proposedextensi<strong>on</strong>s are sympa<str<strong>on</strong>g>the</str<strong>on</strong>g>tic to its significant heritage character.The proposed dwellings are located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling and so will havelimited impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape and <str<strong>on</strong>g>the</str<strong>on</strong>g> significance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> heritage place. Thec<strong>on</strong>temporary appearance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings is c<strong>on</strong>sidered an acceptable designresp<strong>on</strong>se as it does not mimic <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> existing dwelling and provides a cleardelineati<strong>on</strong> between new and old. Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rmore, Council’s Heritage Adviser has no objecti<strong>on</strong>to <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal, subject to c<strong>on</strong>diti<strong>on</strong>.Page 64


PLANNING COMMITTEE MINUTES 25 JULY 2011Special Building Overlay – Clause 44.05The proposal is c<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose and decisi<strong>on</strong> guidelines <str<strong>on</strong>g>of</str<strong>on</strong>g> Clause 44.05 (SpecialBuilding Overlay) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>Darebin</strong> Planning Scheme:• The proposal is c<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> State Planning Policy Framework and <str<strong>on</strong>g>the</str<strong>on</strong>g> LocalPlanning Policy Framework, including <str<strong>on</strong>g>the</str<strong>on</strong>g> Municipal Strategic Statement and local<str<strong>on</strong>g>planning</str<strong>on</strong>g> policies.• The proposal has been assessed by Melbourne Water, <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant floodplainmanagement authority, and written c<strong>on</strong>sent has been provided pursuant to Secti<strong>on</strong> 55<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Act, subject to c<strong>on</strong>diti<strong>on</strong>.• The proposed development cannot be located <strong>on</strong> any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site thatis flood-free or has a lesser flood hazard, as determined by Melbourne Water.• The proposed development will not unreas<strong>on</strong>ably redirect or obstruct floodwater,stormwater or drainage water, adversely reduce flood storage or unreas<strong>on</strong>ablyincrease flood levels or flow velocities, as determined by Melbourne Water.NEIGHBOURHOOD CHARACTER PRECINCT GUIDELINE ASSESSMENT:EXISTING BUILDINGSThe existing dwelling is to be largely retained, with <strong>on</strong>ly partial demoliti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.The Council’s Heritage Advisor has no objecti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed extensi<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> existingdwelling, subject to c<strong>on</strong>diti<strong>on</strong>.Complies subject to c<strong>on</strong>diti<strong>on</strong>VEGETATIONA c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require a detailed landscaping plan. The indicative gardenlayout allows adequate space for substantial landscaping.Complies subject to c<strong>on</strong>diti<strong>on</strong>SITINGThe existing fr<strong>on</strong>t setback is to be retained, with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling largely remaining.The proposal retains side setbacks to most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site to both <str<strong>on</strong>g>the</str<strong>on</strong>g> east and west boundaries,which respects <str<strong>on</strong>g>the</str<strong>on</strong>g> rhythm and spacing <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood.All vehicle storage is located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling and all vehicle access isachieved from <str<strong>on</strong>g>the</str<strong>on</strong>g> existing ROW.CompliesPage 65


PLANNING COMMITTEE MINUTES 25 JULY 2011HEIGHT AND BUILDING FORMThe existing single storey dwelling is to remain, which respects <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area.The two storey form <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings is set back substantially from <str<strong>on</strong>g>the</str<strong>on</strong>g> street andbehind <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling and will <str<strong>on</strong>g>the</str<strong>on</strong>g>refore have little impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area.CompliesMATERIALS AND DESIGN DETAILThe materials proposed for <str<strong>on</strong>g>the</str<strong>on</strong>g> extensi<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling are c<strong>on</strong>sidered acceptable.The materials for <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings are varied and allow for visual articulati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>proposal. A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require a revised materials and colour schedulethat includes a reducti<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> renderComplies subject to c<strong>on</strong>diti<strong>on</strong>FRONT BOUNDARY TREATMENTNo fr<strong>on</strong>t fence is proposed, which allows an unrestricted view <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping anddwellings behind.A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require elevati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed letter boxes.Complies subject to c<strong>on</strong>diti<strong>on</strong>CLAUSE 55 ASSESSMENTStandard B1 - Neighbourhood CharacterThis element has been c<strong>on</strong>sidered above in <str<strong>on</strong>g>the</str<strong>on</strong>g> Neighbourhood Character GuidelinesAssessment.Complies subject to c<strong>on</strong>diti<strong>on</strong>Standard B4: InfrastructureThe development is to be located in an established area where <str<strong>on</strong>g>the</str<strong>on</strong>g>re is adequateinfrastructure. The proposal will not exceed <str<strong>on</strong>g>the</str<strong>on</strong>g> capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> local infrastructure.Council’s Capital Works Unit has commented that drainage is available to <str<strong>on</strong>g>the</str<strong>on</strong>g> site subject toc<strong>on</strong>diti<strong>on</strong>s.Complies subject to c<strong>on</strong>diti<strong>on</strong>Standard B7: Building HeightThe proposed dwellings are to have a maximum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 6.45 metres which complies with<str<strong>on</strong>g>the</str<strong>on</strong>g> standard requiring a maximum height not exceeding 9 metres.CompliesPage 66


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B8: Site CoverageThe area covered by buildings should not exceed a site coverage <str<strong>on</strong>g>of</str<strong>on</strong>g> 60%. The site coverageis 54%.CompliesStandard B9: PermeabilityTo reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> impact <str<strong>on</strong>g>of</str<strong>on</strong>g> increased stormwater run-<str<strong>on</strong>g>of</str<strong>on</strong>g>f <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> drainage system and t<str<strong>on</strong>g>of</str<strong>on</strong>g>acilitate <strong>on</strong>-site stormwater infiltrati<strong>on</strong>, at least 20% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site should be permeable. Thesite permeability is 30%.CompliesStandard B10: Energy EfficiencyThe proposal is c<strong>on</strong>sidered to be generally energy efficient due to <str<strong>on</strong>g>the</str<strong>on</strong>g> following:• Attached c<strong>on</strong>structi<strong>on</strong>.• Cross ventilati<strong>on</strong> is available in <str<strong>on</strong>g>the</str<strong>on</strong>g> design.• The development does not unreas<strong>on</strong>ably affect <str<strong>on</strong>g>the</str<strong>on</strong>g> solar access and energy efficiency<str<strong>on</strong>g>of</str<strong>on</strong>g> neighbouring dwellings.• Open space and living areas with access to north light.• Space for outdoor clo<str<strong>on</strong>g>the</str<strong>on</strong>g>s drying facilities.The applicati<strong>on</strong> includes a Sustainable Design Statement that detail sustainable designinitiatives.C<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require locati<strong>on</strong> and details <str<strong>on</strong>g>of</str<strong>on</strong>g> water tanks.Complies subject to c<strong>on</strong>diti<strong>on</strong>Standard B12: SafetyThe entrances to <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are adequately visible from <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW and/or <str<strong>on</strong>g>the</str<strong>on</strong>g> street.The development is designed to provide good lighting, visibility and surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g> carparking and <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW.The private open space within <str<strong>on</strong>g>the</str<strong>on</strong>g> development is protected from inappropriate use as apublic thoroughfare.CompliesStandard B13: LandscapingThe open spaces and setbacks are generally large enough to provide sufficient landscaping.A detailed landscape plan will be required as a c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval.Complies subject to c<strong>on</strong>diti<strong>on</strong>Page 67


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B14: AccessVehicle access to and from <str<strong>on</strong>g>the</str<strong>on</strong>g> site is safe, manageable and c<strong>on</strong>venient. The lack <str<strong>on</strong>g>of</str<strong>on</strong>g> vehiclecrossover(s) respects <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood character, with all access from <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW.A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require removal <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 1.8 metre high fence between Units 1and 2 and some landscaping to Units 1, 2, 3 and 4 to improve manoeuvrability.Complies subject to c<strong>on</strong>diti<strong>on</strong>Standard B15: Parking Locati<strong>on</strong>Parking facilities will be proximate to <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings <str<strong>on</strong>g>the</str<strong>on</strong>g>y serve.The proposed garages are an adequately secure form <str<strong>on</strong>g>of</str<strong>on</strong>g> parking.The access is observable.There are no habitable room windows within 1.5 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> a vehicle accessway.CompliesStandard B16: Parking Provisi<strong>on</strong>One (1) car parking space is provided for each <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two (2) bedroom dwellings.Two (2) car parking spaces are provided for <str<strong>on</strong>g>the</str<strong>on</strong>g> existing three (3) bedroom dwelling withboth spaces under cover.There is no requirement for visitor car parking spaces as <str<strong>on</strong>g>the</str<strong>on</strong>g>re are less than five (5)dwellings. The site is also located close to public transport in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> trains (NorthcoteTrain Stati<strong>on</strong>), busses and trams.A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require pedestrian doors to be reversed so that <str<strong>on</strong>g>the</str<strong>on</strong>g>y do notopen into <str<strong>on</strong>g>the</str<strong>on</strong>g> car parking area.A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require <str<strong>on</strong>g>the</str<strong>on</strong>g> bin storage areas to be removed from within <str<strong>on</strong>g>the</str<strong>on</strong>g>car parking area.The car parking facilities are designed, surfaced and graded to reduce run-<str<strong>on</strong>g>of</str<strong>on</strong>g>f and allowstormwater to drain into <str<strong>on</strong>g>the</str<strong>on</strong>g> ROW.Unit 4’s open study cannot reas<strong>on</strong>ably be used as a bedroom.Single garage dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 metres length x 3.50 metres width comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> minimumrequirements <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.The double carport depth <str<strong>on</strong>g>of</str<strong>on</strong>g> 5.50 metres does not comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard that requires aminimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 metres; however, <str<strong>on</strong>g>the</str<strong>on</strong>g> design is c<strong>on</strong>sidered to be acceptable given that <str<strong>on</strong>g>the</str<strong>on</strong>g>west end <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> carport is open to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling’s private open space. A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>any approval will require <str<strong>on</strong>g>the</str<strong>on</strong>g> external storage area to be repositi<strong>on</strong>ed so that it is not within500mm <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> car port.Complies with objective subject to c<strong>on</strong>diti<strong>on</strong>Page 68


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B17: Side and Rear SetbacksGround floorBoundary Wall height RequiredSetbackProposedsetbackWestern – U1 2.95 metres 1 metre 1.20 metresWestern – U2 3.30 metres 1 metre 2.40 metresWestern – U3 3.30 metres 1 metre 2.40 metresEastern – U1 3.15 metres 1 metre 3.10 metresEastern – U2 3.10 metres 1 metre 3.10 metresEastern – U3 3.10 metres 1 metre 3.10 metresEastern – U4 3.10 metres 1 metre 3.10 metresFirst FloorBoundary Wall height RequiredSetbackProposedsetbackWestern – U2 6.45 metres 1.86 metres 4.04 metresWestern – U3 6.45 metres 1.86 metres 4.04 metresWestern – U4 6.45 metres 1.86 metres 1.65 metresEastern – U2 4.90 metres 1.39 metres 700mmEastern – U3 4.90 metres 1.39 metres 700mmEastern – U4 4.90 metres 1.39 metres 700mm* n<strong>on</strong> compliant setbacks shown in boldAll ground floor side setbacks are compliant with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.The first floor, western boundary setback <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 4 is 1.65 metres, where <str<strong>on</strong>g>the</str<strong>on</strong>g> standardrequires a 1.86 metre setback, this is c<strong>on</strong>sidered acceptable as Unit 4 is adjacent to a largegarage <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining property to <str<strong>on</strong>g>the</str<strong>on</strong>g> west and will <str<strong>on</strong>g>the</str<strong>on</strong>g>refore have limited impact <strong>on</strong>residential amenity.The first floor, eastern boundary setbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2, Unit 3 and Unit 4 are 700mm, where <str<strong>on</strong>g>the</str<strong>on</strong>g>standard requires a 1.39 metre setback. The eastern boundary is shared with a ROW and<str<strong>on</strong>g>the</str<strong>on</strong>g> eastern walls <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> units are set back 2.25 metres (standard requires 1.86 metres) from<str<strong>on</strong>g>the</str<strong>on</strong>g> eastern boundary, with <strong>on</strong>ly balc<strong>on</strong>ies having a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 700mm. The ROW and <str<strong>on</strong>g>the</str<strong>on</strong>g>screening to <str<strong>on</strong>g>the</str<strong>on</strong>g> balc<strong>on</strong>ies, which will let light through, will reduce any impact <strong>on</strong> surroundingresidential amenity and <str<strong>on</strong>g>the</str<strong>on</strong>g> setbacks are <str<strong>on</strong>g>the</str<strong>on</strong>g>refore c<strong>on</strong>sidered acceptable.Complies with objectivePage 69


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B18: Walls <strong>on</strong> BoundariesThe standard requires that a wall be <str<strong>on</strong>g>of</str<strong>on</strong>g> a length <str<strong>on</strong>g>of</str<strong>on</strong>g> no more than 10 metres plus 25% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>remaining length <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary <str<strong>on</strong>g>of</str<strong>on</strong>g> an adjoining lot, and a height not exceeding an average<str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres.Boundary and lengthMaximum lengthallowableNor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn: 13.10 metres 10.78 metresProposed length13.10 metresWestern: 44.19 metres 18.55 metres 6 metres*n<strong>on</strong> compliant walls shown in boldThe western boundary wall height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres average complies with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard.The nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary wall height <str<strong>on</strong>g>of</str<strong>on</strong>g> 6.45 metres and <str<strong>on</strong>g>the</str<strong>on</strong>g> 13.10 metre length do not complywith <str<strong>on</strong>g>the</str<strong>on</strong>g> standard. The nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary is shared with a ROW with a width <str<strong>on</strong>g>of</str<strong>on</strong>g> 5.10 metres,which will reduce any impact <strong>on</strong> surrounding residential amenity and <str<strong>on</strong>g>the</str<strong>on</strong>g> wall is <str<strong>on</strong>g>the</str<strong>on</strong>g>reforec<strong>on</strong>sidered acceptable.Complies with objectiveStandard B20: North Facing WindowsThere are no north-facing habitable room windows <strong>on</strong> adjoining properties which would beaffected by <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed development in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> this standard.CompliesStandard B21: OvershadowingOvershadowing <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining open space meets <str<strong>on</strong>g>the</str<strong>on</strong>g> standard and objective.Overshadowing <str<strong>on</strong>g>of</str<strong>on</strong>g> neighbouring properties to <str<strong>on</strong>g>the</str<strong>on</strong>g> east and west by <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings isminimal, with at least 40 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> neighbouring dwellings’ secluded private openspace with a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3.0 metres, or 75% (whichever is <str<strong>on</strong>g>the</str<strong>on</strong>g> lesser) receiving aminimum <str<strong>on</strong>g>of</str<strong>on</strong>g> five (5) hours sunlight between 9am and 3pm <strong>on</strong> 22 September.CompliesStandard B22: OverlookingThe ground floors <str<strong>on</strong>g>of</str<strong>on</strong>g> all dwellings have finished floor levels less than 800mm above naturalground level at <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary. An existing 1.80 metre high boundary fence <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> westernboundary will sufficiently limit overlooking.There are no habitable room windows <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor, eastern elevati<strong>on</strong>.The first floor, west facing habitable room windows are screened to 1.70 metres fromfinished floor level.The first floor, east facing habitable room windows and balc<strong>on</strong>ies are screened to 1.70metres to prevent overlooking to <str<strong>on</strong>g>the</str<strong>on</strong>g> east.CompliesPage 70


PLANNING COMMITTEE MINUTES 25 JULY 2011Standard B24: Noise ImpactsThere are no obvious noise sources to or from <str<strong>on</strong>g>the</str<strong>on</strong>g> development.CompliesStandard B25: AccessibilityThe proposed dwellings can be made accessible for people with limited mobility byc<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a ramp, if required.Whilst <str<strong>on</strong>g>the</str<strong>on</strong>g> living areas <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed dwellings are located <strong>on</strong> first floor level, each dwellinghas a bathroom and bedroom at ground floor level.CompliesStandard B26: Dwelling EntryThe entries are visible and easily identifiable. A sense <str<strong>on</strong>g>of</str<strong>on</strong>g> address and shelter is alsoprovided.CompliesStandard B28: Private Open SpaceThe development provides adequate private open space (pos) for <str<strong>on</strong>g>the</str<strong>on</strong>g> reas<strong>on</strong>able recreati<strong>on</strong>and service needs <str<strong>on</strong>g>of</str<strong>on</strong>g> residents.The existing dwelling achieves more than 40 square metres <str<strong>on</strong>g>of</str<strong>on</strong>g> private open space with aminimum area <str<strong>on</strong>g>of</str<strong>on</strong>g> 25 square metres, a minimum dimensi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres and c<strong>on</strong>venientaccess from a living room.Unit 2, Unit 3 and Unit 4 achieve a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 8 square metre balc<strong>on</strong>ies with a minimumwidth <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.6 metres and c<strong>on</strong>venient access from a living room.A summary <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> provided private open space is shown in <str<strong>on</strong>g>the</str<strong>on</strong>g> table below.Total POS Secluded POS Minimum dimensi<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> secluded POSUnit 1 188.37m² 35.34m² 3 metres(existing)Unit 2 25.57m² 9m² 1.60 metresUnit 3 25.62m² 9m² 1.60 metresUnit 4 8.30m² 8.30m² 1.60 metresAll secluded private open space areas have direct access to a living room.CompliesStandard B29: Solar Access to Open SpaceThe secluded private open space <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling (Unit 1) has direct nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn solaraccess.Whilst not compliant with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard, <str<strong>on</strong>g>the</str<strong>on</strong>g> balc<strong>on</strong>y to Unit 4 will receive a sufficient amount<str<strong>on</strong>g>of</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn solar access for <str<strong>on</strong>g>the</str<strong>on</strong>g> first half <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> day and is <str<strong>on</strong>g>the</str<strong>on</strong>g>refore c<strong>on</strong>sidered acceptable.The balc<strong>on</strong>y is a usable area and is located directly <str<strong>on</strong>g>of</str<strong>on</strong>g>f an internal living area.Page 71


PLANNING COMMITTEE MINUTES 25 JULY 2011The balc<strong>on</strong>ies <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 2 and Unit 3 do not comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard; however <str<strong>on</strong>g>the</str<strong>on</strong>g>y provideuseable space located directly <str<strong>on</strong>g>of</str<strong>on</strong>g>f internal living areas and this, coupled with <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floorsec<strong>on</strong>dary private open spaces that have direct nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn solar access, provide anacceptable outcome.Complies with objectiveStandard B30: StorageUnit 1, Unit 2 and Unit 3 all have 6m³ <str<strong>on</strong>g>of</str<strong>on</strong>g> external storage.Due to <str<strong>on</strong>g>the</str<strong>on</strong>g> design resp<strong>on</strong>se <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 4, it is c<strong>on</strong>sidered acceptable for it to have 6m³ <str<strong>on</strong>g>of</str<strong>on</strong>g>internal storage as shown.Complies with objectiveStandard B31: Design DetailThe design detail <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development respects <str<strong>on</strong>g>the</str<strong>on</strong>g> existing or preferred neighbourhoodcharacter through: façade articulati<strong>on</strong>; window and door proporti<strong>on</strong>s; verandah treatment;parapets.In additi<strong>on</strong>, carports and garages are located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling so as toreduce <str<strong>on</strong>g>the</str<strong>on</strong>g>ir impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing or preferred neighbourhood character.CompliesStandard B34: Site ServicesSufficient area is provided to allow for <str<strong>on</strong>g>the</str<strong>on</strong>g> installati<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> maintenance <str<strong>on</strong>g>of</str<strong>on</strong>g> site services.A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval will require that site services and plant are shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> plans.Complies subject to c<strong>on</strong>diti<strong>on</strong>POLICY IMPLICATIONSEnvir<strong>on</strong>mental SustainabilityAll new dwellings are required to achieve a minimum six (6) star energy rating under <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant building c<strong>on</strong>trols.Social Inclusi<strong>on</strong> and DiversityNil.O<str<strong>on</strong>g>the</str<strong>on</strong>g>rNil.Page 72


PLANNING COMMITTEE MINUTES 25 JULY 2011FINANCIAL AND RESOURCE IMPLICATIONSThere are no financial or resource implicati<strong>on</strong>s as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> determinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thisapplicati<strong>on</strong>.FUTURE ACTIONSNil.DISCLOSURE OF INTERESTSSecti<strong>on</strong> 80C <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Local Government Act 1989 requires members <str<strong>on</strong>g>of</str<strong>on</strong>g> Council staff andpers<strong>on</strong>s engaged under c<strong>on</strong>tract to provide advice to Council to disclose any direct orindirect interest in a matter to which <str<strong>on</strong>g>the</str<strong>on</strong>g> advice relates.The Manager authorising this report, having made enquiries with relevant members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,reports that no disclosable interests have been raised in relati<strong>on</strong> to this report.RELATED DOCUMENTS<strong>Darebin</strong> Planning SchemePlanning and Envir<strong>on</strong>ment Act (1987) as amended.Heritage ReviewCOMMITTEE DECISIONMOVED:SECONDED:Cr. N. KatsisCr. S. TsitasTHAT Planning Permit Applicati<strong>on</strong> D/791/2010 be refused and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g>Refusal be issued <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> following grounds:(1) The proposal does not respect <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area or<str<strong>on</strong>g>the</str<strong>on</strong>g> heritage significance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing dwelling.(2) The proposal would have a detrimental impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> nearbyresidential properties.(3) The proposal is an overdevelopment.CARRIEDPage 73


PLANNING COMMITTEE MINUTES 25 JULY 20115.5 APPLICATION FOR PLANNING PERMIT D/790/2010210 Gillies Street, FairfieldAUTHOR:DIRECTOR:Senior Planner – Deniz Yener-KorematsuDirector <strong>City</strong> Works and Development – Michael BallockOWNER/APPLICANT/CONSULTANT:Applicant:P Rujanoski - Architectural Plans & PermitsShop 2 387 Stati<strong>on</strong> StTHORNBURY VIC 3071Owner:Peter Louise Chapman and Andrea Lillian Chapman137 Yallambie RdMACLEOD VIC 3085SUMMARY:• Medium density development comprising three (3) double-storey, three (3) bedroomdwellings. Each dwelling has access to two (2) car parking spaces comprising a singlespace garage and tandem car space.• The Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Title does not indicate that <str<strong>on</strong>g>the</str<strong>on</strong>g>re is a restrictive covenant whichapplies to <str<strong>on</strong>g>the</str<strong>on</strong>g> land.• Recommendati<strong>on</strong> – Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> to Grant a Planning Permit subject to c<strong>on</strong>diti<strong>on</strong>sCONSULTATION:• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> was given by posting a sign <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land and mailing <str<strong>on</strong>g>of</str<strong>on</strong>g> noticesto affected properties.• Five (5) objecti<strong>on</strong>s have been received.• A c<strong>on</strong>sultative <str<strong>on</strong>g>meeting</str<strong>on</strong>g> was not <str<strong>on</strong>g>held</str<strong>on</strong>g> as <str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> objecti<strong>on</strong> could not bemediated.• The applicati<strong>on</strong> was referred internally to Council’s Capital Works Unit, Public RealmUnit and Traffic Management Unit. The applicati<strong>on</strong> was not required to be referredexternally.RECOMMENDATIONTHAT Planning Permit Applicati<strong>on</strong> D/790/2010 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> toGrant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. Theplans must be drawn to scale with dimensi<strong>on</strong>s and must be generally in accordancePage 74


PLANNING COMMITTEE MINUTES 25 JULY 2011with <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> (identified as Proposed Site and GroundFloor Plans A-1, Proposed Site and First Floor Plans A-2, Proposed Elevati<strong>on</strong>s A-3,prepared by Architectural Plans and Permits and dated Revisi<strong>on</strong> date 04.03.11) butmodified to show:a) The first floor south-facing windows <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and west-facing living roomwindows <str<strong>on</strong>g>of</str<strong>on</strong>g> all dwellings provided with ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• A sill with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floor level,• A fixed screen with a maximum permeability <str<strong>on</strong>g>of</str<strong>on</strong>g> 25% to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g>1.7 metres above finished floor level or• Fixed obscure glazing (not film) to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres abovefinished floor level.Where fixed screens are being utilised a secti<strong>on</strong> diagram must be included todem<strong>on</strong>strate how <str<strong>on</strong>g>the</str<strong>on</strong>g> screens minimise overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoining properties.b) The provisi<strong>on</strong> and full specificati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> high quality timber garage doors, inkeeping with <str<strong>on</strong>g>the</str<strong>on</strong>g> materials and colours <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t façade <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings.c) The upper floor, south facing brick wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 treated with wea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard finish,as specified for <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t (eastern) elevati<strong>on</strong>.d) The rear (western) setback <str<strong>on</strong>g>of</str<strong>on</strong>g> each dwelling increased by <strong>on</strong>e (1) metre toaccommodate additi<strong>on</strong>al planting.e) The south wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Study Nook/Library <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 to have a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.18metres for <str<strong>on</strong>g>the</str<strong>on</strong>g> first 3 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t facade <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling.f) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pedestrian visibility splays measuring 2.0 metres (width across<str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage) by 2.5 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn and sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rnsides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed crossovers to Gillies Street. Where within <str<strong>on</strong>g>the</str<strong>on</strong>g>subject site, any structures or vegetati<strong>on</strong> within <str<strong>on</strong>g>the</str<strong>on</strong>g>se splays must be not morethan 1.15 metres in height.g) Annotati<strong>on</strong>s detailing a Tree Protecti<strong>on</strong> Z<strong>on</strong>e and associated Tree Protecti<strong>on</strong>Fence with a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.0 metres (measured from <str<strong>on</strong>g>the</str<strong>on</strong>g> outside edge <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk)for <str<strong>on</strong>g>the</str<strong>on</strong>g> tree located in <str<strong>on</strong>g>the</str<strong>on</strong>g> naturestrip in fr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> C<strong>on</strong>diti<strong>on</strong> No.6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.A notati<strong>on</strong> must be added to state that any works in <str<strong>on</strong>g>the</str<strong>on</strong>g> Tree Protecti<strong>on</strong> Z<strong>on</strong>emust be carried out without excavati<strong>on</strong>.h) Provisi<strong>on</strong> and specificati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> permeable paving to <str<strong>on</strong>g>the</str<strong>on</strong>g> accessways.i) Delete <str<strong>on</strong>g>the</str<strong>on</strong>g> west facing balc<strong>on</strong>ies <str<strong>on</strong>g>of</str<strong>on</strong>g> each unit.j) Skilli<strong>on</strong> ro<str<strong>on</strong>g>of</str<strong>on</strong>g>s with nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn clerestory windows over <str<strong>on</strong>g>the</str<strong>on</strong>g> rear ground floor areas(comprising <str<strong>on</strong>g>the</str<strong>on</strong>g> family/dining).k) The shared crossover to Unit 1 and Unit 2 reduced in width to 3.6 metres and <str<strong>on</strong>g>the</str<strong>on</strong>g>driveways and tandem parking spaces corresp<strong>on</strong>dingly redesigned to allowc<strong>on</strong>venient vehicular access (without reducing <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping areas in <str<strong>on</strong>g>the</str<strong>on</strong>g>fr<strong>on</strong>tage).l) A landscape plan in accordance with C<strong>on</strong>diti<strong>on</strong> No. 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. The planmust also include planting al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> north and south boundary setbacks with aminimum mature height <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.5 metres and at least seven (7) low to mediumheight canopy trees throughout <str<strong>on</strong>g>the</str<strong>on</strong>g> site to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority.Page 75


PLANNING COMMITTEE MINUTES 25 JULY 2011m) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a comprehensive schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> materials, finishes and colours(including colour samples).When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.2. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be altered without <str<strong>on</strong>g>the</str<strong>on</strong>g>prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.3. This Permit will expire if ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> thisPermit; or• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request is made inwriting before this Permit expires or within three (3) m<strong>on</strong>ths after <str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.4. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any works authorised by thispermit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong> Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>development levy for each charge unit must be calculated in accordance with Schedule1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong> Plan Overlay.5. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan is approved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>nform part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. The Landscape Plan must be prepared by a suitably qualifiedpers<strong>on</strong> and must incorporate:a) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) medium canopy trees <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site (3 within <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tsetback and 3 within <str<strong>on</strong>g>the</str<strong>on</strong>g> rear setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site) with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 2metres at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5 metres at maturity.b) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> screen planting with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metres at maturityinstalled al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn and sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundaries <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site opposite <str<strong>on</strong>g>the</str<strong>on</strong>g>building footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 3 (between <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary and <str<strong>on</strong>g>the</str<strong>on</strong>g>garage <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3; and <str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary and <str<strong>on</strong>g>the</str<strong>on</strong>g> study nook <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1).c) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to be removed,including overhanging trees <strong>on</strong> adjoining properties. The genus, species, heightand spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specifiedd) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanical name,comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plantse) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds and hard paving(such as asphalt, c<strong>on</strong>crete, brick or gravel)f) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyg) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbage binreceptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etch) Edge treatment between grass (lawn) and garden bedsi) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> buildings <strong>on</strong> adjoiningland, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows and doors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject sitemust also be shownPage 76


PLANNING COMMITTEE MINUTES 25 JULY 2011j) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead and underground services.C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed planting must beavoidedk) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbersl) A scale, North Point and appropriate legend.The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.6. Before buildings and works (including demoliti<strong>on</strong>) start, a tree protecti<strong>on</strong> fence must beerected around <str<strong>on</strong>g>the</str<strong>on</strong>g> naturestrip tree at a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.0 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> base <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunkto define a ‘tree protecti<strong>on</strong> z<strong>on</strong>e’.This fence must be c<strong>on</strong>structed <str<strong>on</strong>g>of</str<strong>on</strong>g> star pickets and chain mesh (or similar) to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.The tree protecti<strong>on</strong> fence must remain in place until c<strong>on</strong>structi<strong>on</strong> is completed.No vehicular or pedestrian access, trenching or soil excavati<strong>on</strong> is to occur within <str<strong>on</strong>g>the</str<strong>on</strong>g>tree protecti<strong>on</strong> z<strong>on</strong>e.No storage or dumping <str<strong>on</strong>g>of</str<strong>on</strong>g> tools, equipment or waste is to occur within <str<strong>on</strong>g>the</str<strong>on</strong>g> treeprotecti<strong>on</strong> z<strong>on</strong>e.The ground surface <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> tree protecti<strong>on</strong> z<strong>on</strong>e must be covered by a protective100mm deep layer <str<strong>on</strong>g>of</str<strong>on</strong>g> mulch prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> development commencing and be wateredregularly to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be completed to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied and/or<str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as is approved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority inwriting.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g> permit holdermust advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping has been completed.8. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must be maintained, andany dead, diseased or damaged plant replaced in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsedLandscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.9. Floor levels shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must be c<strong>on</strong>firmed. The c<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Act 1993 and <str<strong>on</strong>g>the</str<strong>on</strong>g> BuildingRegulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong> must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a report from a licensedland surveyor and must be submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority no later than 7 daysfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels must be c<strong>on</strong>firmedbefore a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensed land surveyorsubmitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. All dwellings that share dividing walls and/or floors must be c<strong>on</strong>structed to limit noisetransmissi<strong>on</strong> in accordance with Part F(5) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Code <str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.11. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting system capable <str<strong>on</strong>g>of</str<strong>on</strong>g>illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage and car parking space andall pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.Page 77


PLANNING COMMITTEE MINUTES 25 JULY 2011The external lighting must be designed, baffled and/or located to ensure that no loss <str<strong>on</strong>g>of</str<strong>on</strong>g>amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sibleAuthority.12. Boundary walls facing adjoining properties must be cleaned and finished to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.14. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes, fixtures, fittingsand vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must be c<strong>on</strong>cealed in service ducts oro<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.15. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than those shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> priorwritten c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles for newspapers to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.17. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g> vehicles andaccess lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g>plans;c) Surfaced with an all wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r sealcoat; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not beused for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.18. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied, vehicular crossing(s) must be c<strong>on</strong>structed to alignwith approved driveways to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. All redundantcrossing(s) or crossing opening(s) must be removed and replaced with footpath,naturestrip and kerb and channel to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.REPORTINTRODUCTION AND BACKGROUNDPlanning Applicati<strong>on</strong> D398/2001 was refused <strong>on</strong> 16/7/2003. Grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> refusal were based<strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> inappropriateness <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary to boundary design approach and garages sittingforward <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t façade.ISSUES AND DISCUSSIONSubject site and surrounding areaThe site is regular in shape, with a fr<strong>on</strong>tage <str<strong>on</strong>g>of</str<strong>on</strong>g> 20.1 metres and a depth <str<strong>on</strong>g>of</str<strong>on</strong>g> 40.2 metres. Thetotal site area is 808.02 square metres.Page 78


PLANNING COMMITTEE MINUTES 25 JULY 2011The site is located in a Residential 1 Z<strong>on</strong>e and is affected by <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong>sPlan Overlay – Schedule 1.The site is located <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> west side <str<strong>on</strong>g>of</str<strong>on</strong>g> Gillies Street between Christmas Street to <str<strong>on</strong>g>the</str<strong>on</strong>g> northand Edwin Street to <str<strong>on</strong>g>the</str<strong>on</strong>g> south.The site is occupied by single storey dwelling with secluded private open space andoutbuildings to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear. Access is gained via an existing double crossover shared with <str<strong>on</strong>g>the</str<strong>on</strong>g>adjoining property to <str<strong>on</strong>g>the</str<strong>on</strong>g> north. There is extensive vegetati<strong>on</strong> <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site with trees al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g>boundaries and within <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t setback. A 1.83m easement extends al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> length <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>north boundary. The site is relatively flat.To <str<strong>on</strong>g>the</str<strong>on</strong>g> north is a double storey, rendered brick veneer dwelling with secluded open space to<str<strong>on</strong>g>the</str<strong>on</strong>g> rear.To <str<strong>on</strong>g>the</str<strong>on</strong>g> south is a double storey rendered brick veneer block <str<strong>on</strong>g>of</str<strong>on</strong>g> flats comprising elevendwellings. Private open space is located to <str<strong>on</strong>g>the</str<strong>on</strong>g> north <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building approximately six (6)metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary. Adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary is parallel carparking and <str<strong>on</strong>g>the</str<strong>on</strong>g> accessway.To <str<strong>on</strong>g>the</str<strong>on</strong>g> west (rear) is a double-storey block <str<strong>on</strong>g>of</str<strong>on</strong>g> flats comprising eight (8) dwellings. Thebuilding is setback 8.3 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary. This area is used for car parkingand private open space.To <str<strong>on</strong>g>the</str<strong>on</strong>g> east across Gillies Street are single storey dwellings and medium densitydevelopments with fr<strong>on</strong>t setbacks ranging between 6m and 9m.The subject site is located 100 metres from bus routes 567 and 609 al<strong>on</strong>g Stati<strong>on</strong> Street to<str<strong>on</strong>g>the</str<strong>on</strong>g> east, 300 metres from bus route 508 al<strong>on</strong>g Separati<strong>on</strong> Street to <str<strong>on</strong>g>the</str<strong>on</strong>g> south, andapproximately 1 km north <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Fairfield Village Primary Neighbourhood Activity Centreincluding <str<strong>on</strong>g>the</str<strong>on</strong>g> Hurstbridge train line.Proposal• The proposal seeks approval for a medium density housing development comprising<str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3) double storey dwellings. Each dwelling will fr<strong>on</strong>t GilliesStreet.• Each dwelling will have three (3) bedrooms and access to two (2) car parking spacescomprising a single space garage and tandem car space.• Secluded private open space areas for <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings will be located to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear.OBJECTIONSFive (5) objecti<strong>on</strong>s have been received.Objecti<strong>on</strong>s summarised1. Overlooking2. Inadequate side setbacks3. Setback to <str<strong>on</strong>g>the</str<strong>on</strong>g> south boundary not respectful <str<strong>on</strong>g>of</str<strong>on</strong>g> adjacent private open space4. Unit 1 should have similar setbacks from <str<strong>on</strong>g>the</str<strong>on</strong>g> side boundary as Unit 3Page 79


PLANNING COMMITTEE MINUTES 25 JULY 20115. Visual bulk6. Loss <str<strong>on</strong>g>of</str<strong>on</strong>g> trees (screening/home to birds)7. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> character through bulk and boundary to boundary c<strong>on</strong>structi<strong>on</strong>8. Overshadowing9. Overdevelopment10. Materials and finishes limited in variety and not <str<strong>on</strong>g>of</str<strong>on</strong>g> high quality.Officer comment <strong>on</strong> summarised objecti<strong>on</strong>s1. The proposed development includes several upper floor windows. The north facingfirst floor windows have sill heights <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7m above finished floor level in accordancewith Clause 55. A c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approval can require <str<strong>on</strong>g>the</str<strong>on</strong>g> south facing habitableroom windows to be designed to limit <str<strong>on</strong>g>the</str<strong>on</strong>g> potential for overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g> adjoiningsecluded private open space areas which are currently located within 6 metres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn comm<strong>on</strong> boundary.2. The proposed development satisfies <str<strong>on</strong>g>the</str<strong>on</strong>g> standard for setbacks under Clause 55. Withregard to <str<strong>on</strong>g>the</str<strong>on</strong>g> impact <str<strong>on</strong>g>of</str<strong>on</strong>g> visual bulk to <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn adjoining property, <str<strong>on</strong>g>the</str<strong>on</strong>g> interface to<str<strong>on</strong>g>the</str<strong>on</strong>g> south is c<strong>on</strong>sidered to be formed predominantly <str<strong>on</strong>g>of</str<strong>on</strong>g> n<strong>on</strong>-sensitive areas such as <str<strong>on</strong>g>the</str<strong>on</strong>g>driveway and car parking hardstand. Although <str<strong>on</strong>g>the</str<strong>on</strong>g>se comm<strong>on</strong> property areas may beused informally by residents as ‘communal open space’ (as stated in <str<strong>on</strong>g>the</str<strong>on</strong>g> grounds <str<strong>on</strong>g>of</str<strong>on</strong>g>objecti<strong>on</strong>), <str<strong>on</strong>g>the</str<strong>on</strong>g> same level <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity and privacy which applies to secluded privateopen space areas cannot be applied to communal areas.The nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is slightly greater than <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn setbackwhich resp<strong>on</strong>ds to oblique views <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 from <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining secluded private openspace area to <str<strong>on</strong>g>the</str<strong>on</strong>g> north.3. Secluded (fenced) private open space areas <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn property arelocated approximately 6 metres away from <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary (although <str<strong>on</strong>g>the</str<strong>on</strong>g>y arenot shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor plan, this has been c<strong>on</strong>firmed via a site inspecti<strong>on</strong>). Inadditi<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> 6 metre separati<strong>on</strong>, an additi<strong>on</strong>al 2.63 metre and 1.7 metre separati<strong>on</strong>is provided between <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn upper floor walls <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed development and<str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary. A total separati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.7 – 8.63 metres is generally c<strong>on</strong>sideredto be an acceptable setback for an upper floor wall from a secluded private open spacearea <strong>on</strong> an adjoining site.4. Grounds <str<strong>on</strong>g>of</str<strong>on</strong>g> objecti<strong>on</strong> seek for <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal to provide a similar setback from <str<strong>on</strong>g>the</str<strong>on</strong>g>sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary as provided to <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> basis <str<strong>on</strong>g>of</str<strong>on</strong>g> visual bulkand overshadowing impacts. This is not c<strong>on</strong>sidered to be a reas<strong>on</strong>able request, as <str<strong>on</strong>g>the</str<strong>on</strong>g>development provides a greater setback to <str<strong>on</strong>g>the</str<strong>on</strong>g> north due to <str<strong>on</strong>g>the</str<strong>on</strong>g> proximity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>adjoining nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn dwelling and <str<strong>on</strong>g>the</str<strong>on</strong>g> direct abuttal <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open spacearea to <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary.The building and secluded private open space areas to <str<strong>on</strong>g>the</str<strong>on</strong>g> south have a far greatersetback and direct abuttal with a driveway and car parking areas. Overshadowing to<str<strong>on</strong>g>the</str<strong>on</strong>g> south will not affect any <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space areas and <str<strong>on</strong>g>the</str<strong>on</strong>g>re issufficient separati<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed and existing buildings to <str<strong>on</strong>g>of</str<strong>on</strong>g>fset any visualbulk impacts. The setbacks provided for <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed development are c<strong>on</strong>sidered tobe resp<strong>on</strong>sive to c<strong>on</strong>diti<strong>on</strong>s <strong>on</strong> adjoining sites and meet <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant standard withinClause 55. Though <str<strong>on</strong>g>the</str<strong>on</strong>g> height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development can be reduced slightly at <str<strong>on</strong>g>the</str<strong>on</strong>g> upperfloor as part <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval (see fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r discussi<strong>on</strong> below).Page 80


PLANNING COMMITTEE MINUTES 25 JULY 20115. The proposed development has been well articulated and has made use <str<strong>on</strong>g>of</str<strong>on</strong>g> differentmaterials to reduce visual bulk at <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t elevati<strong>on</strong> through <str<strong>on</strong>g>the</str<strong>on</strong>g> juxtapositi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>building materials. High quality garage doors that blend in with <str<strong>on</strong>g>the</str<strong>on</strong>g> development will berequested as a c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> dominance <str<strong>on</strong>g>of</str<strong>on</strong>g> parkingstructures visible to <str<strong>on</strong>g>the</str<strong>on</strong>g> street. However, some <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> smooth render finish and timbercladding used <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t elevati<strong>on</strong>s could be extended al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn elevati<strong>on</strong>instead <str<strong>on</strong>g>of</str<strong>on</strong>g> face-brickwork, as <str<strong>on</strong>g>the</str<strong>on</strong>g> development will be visible from public areas to <str<strong>on</strong>g>the</str<strong>on</strong>g>south. This should provide sufficient visual interest and reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> appearance <str<strong>on</strong>g>of</str<strong>on</strong>g>visual bulk to <str<strong>on</strong>g>the</str<strong>on</strong>g> south. The overall height <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development is less than immediateproperties and should not impact <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> streetscape character or <str<strong>on</strong>g>the</str<strong>on</strong>g> amenity <str<strong>on</strong>g>of</str<strong>on</strong>g>adjoining properties.6. The proposal will result in <str<strong>on</strong>g>the</str<strong>on</strong>g> loss <str<strong>on</strong>g>of</str<strong>on</strong>g> a significant number <str<strong>on</strong>g>of</str<strong>on</strong>g> trees but <str<strong>on</strong>g>the</str<strong>on</strong>g>se have beendeemed to have medium to low retenti<strong>on</strong> value by Council’s Public Realm Unit and <str<strong>on</strong>g>the</str<strong>on</strong>g>site is not affected by a Vegetati<strong>on</strong> Protecti<strong>on</strong> Overlay or any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>planning</str<strong>on</strong>g>mechanism by which trees <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site must be protected.The trees al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary are not c<strong>on</strong>sidered suitable for retenti<strong>on</strong> given<str<strong>on</strong>g>the</str<strong>on</strong>g> proximity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed building footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary line. Even if<str<strong>on</strong>g>the</str<strong>on</strong>g> setback was to be increased slightly to match <str<strong>on</strong>g>the</str<strong>on</strong>g> setback <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3 as suggestedby <str<strong>on</strong>g>the</str<strong>on</strong>g> objecti<strong>on</strong>s, it is not possible to provide an adequate tree protecti<strong>on</strong> z<strong>on</strong>e.The proposed development provides adequate space for <str<strong>on</strong>g>the</str<strong>on</strong>g> planting <str<strong>on</strong>g>of</str<strong>on</strong>g> canopy treesand o<str<strong>on</strong>g>the</str<strong>on</strong>g>r substantial vegetati<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t, rear and <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn setback. Thesou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn setback can accommodate screen planting al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> fence line, which canform a c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> any approval. The rear (western setback) can be slightly increasedvia c<strong>on</strong>diti<strong>on</strong>s to allow medium canopy trees to be located within <str<strong>on</strong>g>the</str<strong>on</strong>g> rear yard areas <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings.7. Small lot subdivisi<strong>on</strong> is prevalent in <str<strong>on</strong>g>the</str<strong>on</strong>g> area and <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary to boundary style <str<strong>on</strong>g>of</str<strong>on</strong>g>development is c<strong>on</strong>sidered to have become an acceptable part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhoodsetting.The subject site is flanked by two unc<strong>on</strong>venti<strong>on</strong>al buildings to <str<strong>on</strong>g>the</str<strong>on</strong>g> north and south; <str<strong>on</strong>g>the</str<strong>on</strong>g>nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn site is occupied by a large detached dwelling exhibiting substantial buildingbulk and a bold garage set forward <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling line; and <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining site to <str<strong>on</strong>g>the</str<strong>on</strong>g>south is occupied by a block <str<strong>on</strong>g>of</str<strong>on</strong>g> two-storey flats providing a n<strong>on</strong>-sensitive driveway andcar park interface to <str<strong>on</strong>g>the</str<strong>on</strong>g> comm<strong>on</strong> boundary. Under <str<strong>on</strong>g>the</str<strong>on</strong>g> circumstances <str<strong>on</strong>g>the</str<strong>on</strong>g> two-storeyform and boundary to boundary c<strong>on</strong>structi<strong>on</strong> is <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> whole c<strong>on</strong>sidered acceptable,particularly as garages are set back behind <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings’ fr<strong>on</strong>t walls. However, as <str<strong>on</strong>g>the</str<strong>on</strong>g>wall <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundary will be overtly visible due to <str<strong>on</strong>g>the</str<strong>on</strong>g> extensive width <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>driveway/parking areas to <str<strong>on</strong>g>the</str<strong>on</strong>g> south, <str<strong>on</strong>g>the</str<strong>on</strong>g> sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> study nook to Unit 1 canbe set back 1.18 metres for <str<strong>on</strong>g>the</str<strong>on</strong>g> first 3 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t facade <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> dwelling toprovide a visual recess.Objectors have made reference to <str<strong>on</strong>g>the</str<strong>on</strong>g> development at 206 Gillies Street as cited as anexample <str<strong>on</strong>g>of</str<strong>on</strong>g> appropriate side-by-side development. This development resp<strong>on</strong>ds to acompletely different set <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong>s with an entirely different scale <str<strong>on</strong>g>of</str<strong>on</strong>g> development <strong>on</strong>adjoining sites, <str<strong>on</strong>g>the</str<strong>on</strong>g>refore it is difficult to justify a comparis<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two proposals. .8. The proposal will not significantly overshadow <str<strong>on</strong>g>the</str<strong>on</strong>g> secluded private open space <str<strong>on</strong>g>of</str<strong>on</strong>g>adjoining properties. The proposal satisfies <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant standard under Clause 55.9. Level <str<strong>on</strong>g>of</str<strong>on</strong>g> compliance with Clause 55 standards provides a reas<strong>on</strong>able indicati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r a development exceeds what <str<strong>on</strong>g>the</str<strong>on</strong>g> site can sustain. The assessment <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>proposed development indicates that <str<strong>on</strong>g>the</str<strong>on</strong>g> standards <str<strong>on</strong>g>of</str<strong>on</strong>g> Clause 55 are generally met orcan be met subject to minor c<strong>on</strong>diti<strong>on</strong>s. Each dwelling is provided a street fr<strong>on</strong>tage <str<strong>on</strong>g>of</str<strong>on</strong>g>Page 81


PLANNING COMMITTEE MINUTES 25 JULY 2011approximately 6.7 metres which is comparable to o<str<strong>on</strong>g>the</str<strong>on</strong>g>r lengthwise subdivisi<strong>on</strong>s in <str<strong>on</strong>g>the</str<strong>on</strong>g>area (eg. 182-184 Gillies Street, 206 Gillies Street, and 221 Gillies Street) and <str<strong>on</strong>g>the</str<strong>on</strong>g> siteprovides comparable open areas. The two-storey height is in keeping with two-storeyand single-storey dwellings in <str<strong>on</strong>g>the</str<strong>on</strong>g> area. Therefore <str<strong>on</strong>g>the</str<strong>on</strong>g> development is not c<strong>on</strong>sideredto c<strong>on</strong>stitute an overdevelopment.10. Materials and finishes have been discussed under point 5 above.PLANNING ASSESSMENTNEIGHBOURHOOD CHARACTER PRECINCT GUIDELINE ASSESSMENTThe proposed development is generally in keeping with <str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood character in <str<strong>on</strong>g>the</str<strong>on</strong>g>area. The side-by-side attached building form and garages presenting to <str<strong>on</strong>g>the</str<strong>on</strong>g> street is anaccepted form <str<strong>on</strong>g>of</str<strong>on</strong>g> development in <str<strong>on</strong>g>the</str<strong>on</strong>g> immediate area. The proposal provides visual interestto <str<strong>on</strong>g>the</str<strong>on</strong>g> street through articulati<strong>on</strong> and juxtapositi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> materials. The two-storey form is anaccepted height transiti<strong>on</strong> to single and two-storey buildings in <str<strong>on</strong>g>the</str<strong>on</strong>g> area. An appropriate level<str<strong>on</strong>g>of</str<strong>on</strong>g> landscaping can be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site. Some aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development will requireadjustment to provide improved outcomes; <str<strong>on</strong>g>the</str<strong>on</strong>g>se changes can be requested via c<strong>on</strong>diti<strong>on</strong>s<str<strong>on</strong>g>of</str<strong>on</strong>g> any approval.CLAUSE 55 ASSESSMENTThe following standards within Clause 55 are not numerically met, however <str<strong>on</strong>g>the</str<strong>on</strong>g> object <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>standard is c<strong>on</strong>sidered to be satisfied:Standard B6: Street SetbackThe fr<strong>on</strong>t setbacks <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> adjoining dwellings are 6 metres and 9.1 metres. The standard<str<strong>on</strong>g>the</str<strong>on</strong>g>refore requires a setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 7.55 metres.The proposed fr<strong>on</strong>t setback <str<strong>on</strong>g>of</str<strong>on</strong>g> 6.85 metres does not comply with <str<strong>on</strong>g>the</str<strong>on</strong>g> standard, however <str<strong>on</strong>g>the</str<strong>on</strong>g>design resp<strong>on</strong>se is c<strong>on</strong>sidered to be acceptable due to <str<strong>on</strong>g>the</str<strong>on</strong>g> following:The setback addresses <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Neighbourhood Character Study, inthat it allows adequate provisi<strong>on</strong> for landscaping.The fr<strong>on</strong>t façades <str<strong>on</strong>g>of</str<strong>on</strong>g> each dwelling are appropriately articulated.The fr<strong>on</strong>t setback will not result in unreas<strong>on</strong>able visual bulk when viewed from <str<strong>on</strong>g>the</str<strong>on</strong>g> street oradjoining properties.The existing streetscape is not c<strong>on</strong>sistent and provides for varied setbacks ranging from 6metres to 9 metres.Summary <str<strong>on</strong>g>of</str<strong>on</strong>g> Private Open SpacePrivate open space will be provided as follows:Unit 1 – Total: 109m 2 including 45m 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space;Unit 2 – Total: 68m 2 including 38m 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space;Unit 3 – Total: 81m 2 including 38m 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded private open space.Page 82


PLANNING COMMITTEE MINUTES 25 JULY 2011POLICY IMPLICATIONSEnvir<strong>on</strong>mental SustainabilityAll new dwellings are required to achieve a minimum six (6) star energy rating under <str<strong>on</strong>g>the</str<strong>on</strong>g>relevant building c<strong>on</strong>trols.Social Inclusi<strong>on</strong> and DiversityNil.O<str<strong>on</strong>g>the</str<strong>on</strong>g>rNil.FINANCIAL AND RESOURCE IMPLICATIONSThere are no financial or resource implicati<strong>on</strong>s as a result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> determinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thisapplicati<strong>on</strong>.FUTURE ACTIONSNil.DISCLOSURE OF INTERESTSSecti<strong>on</strong> 80C <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Local Government Act 1989 requires members <str<strong>on</strong>g>of</str<strong>on</strong>g> Council staff andpers<strong>on</strong>s engaged under c<strong>on</strong>tract to provide advice to Council to disclose any direct orindirect interest in a matter to which <str<strong>on</strong>g>the</str<strong>on</strong>g> advice relates.The Manager authorising this report, having made enquiries with relevant members <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,reports that no disclosable interests have been raised in relati<strong>on</strong> to this report.RELATED DOCUMENTS<strong>Darebin</strong> Planning Scheme and <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning and Envir<strong>on</strong>ment Act (1987) as amended.Page 83


PLANNING COMMITTEE MINUTES 25 JULY 2011COMMITTEE DECISIONMOVED:SECONDED:Cr. G. GrecoCr. T. LaurenceTHAT Planning Permit Applicati<strong>on</strong> D/790/2010 be approved and a Notice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong> to Grant a Permit be issued subject to <str<strong>on</strong>g>the</str<strong>on</strong>g> following c<strong>on</strong>diti<strong>on</strong>s:1. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development starts, amended plans to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority must be submitted to, and approved by, <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority. The plans must be drawn to scale with dimensi<strong>on</strong>sand must be generally in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> plans submitted with <str<strong>on</strong>g>the</str<strong>on</strong>g>applicati<strong>on</strong> (identified as Proposed Site and Ground Floor Plans A-1,Proposed Site and First Floor Plans A-2, Proposed Elevati<strong>on</strong>s A-3,prepared by Architectural Plans and Permits and dated Revisi<strong>on</strong> date04.03.11) but modified to show:a) The first floor south-facing windows <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and west-facing livingroom windows <str<strong>on</strong>g>of</str<strong>on</strong>g> all dwellings provided with ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• A sill with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floorlevel,• A fixed screen with a maximum permeability <str<strong>on</strong>g>of</str<strong>on</strong>g> 25% to aminimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7 metres above finished floor level or• Fixed obscure glazing (not film) to a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 1.7metres above finished floor level.Where fixed screens are being utilised a secti<strong>on</strong> diagram must beincluded to dem<strong>on</strong>strate how <str<strong>on</strong>g>the</str<strong>on</strong>g> screens minimise overlooking <str<strong>on</strong>g>of</str<strong>on</strong>g>adjoining properties.b) The provisi<strong>on</strong> and full specificati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> high quality timber garagedoors, in keeping with <str<strong>on</strong>g>the</str<strong>on</strong>g> materials and colours <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t façade <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings.c) The upper floor, south facing brick wall <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 treated withwea<str<strong>on</strong>g>the</str<strong>on</strong>g>rboard finish, as specified for <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t (eastern) elevati<strong>on</strong>.d) The rear (western) setback <str<strong>on</strong>g>of</str<strong>on</strong>g> each dwelling increased by <strong>on</strong>e (1)metre to accommodate additi<strong>on</strong>al planting.e) The south wall <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Study Nook/Library <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 to have a setback<str<strong>on</strong>g>of</str<strong>on</strong>g> 1.18 metres for <str<strong>on</strong>g>the</str<strong>on</strong>g> first 3 metres from <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t facade <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>dwelling.f) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pedestrian visibility splays measuring 2.0 metres(width across <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage) by 2.5 metres (depth into <str<strong>on</strong>g>the</str<strong>on</strong>g> site), to <str<strong>on</strong>g>the</str<strong>on</strong>g>nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn and sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn sides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing and proposed crossoversto Gillies Street. Where within <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site, any structures orvegetati<strong>on</strong> within <str<strong>on</strong>g>the</str<strong>on</strong>g>se splays must be not more than 1.15 metres inheight.g) Annotati<strong>on</strong>s detailing a Tree Protecti<strong>on</strong> Z<strong>on</strong>e and associated TreeProtecti<strong>on</strong> Fence with a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.0 metres (measured from <str<strong>on</strong>g>the</str<strong>on</strong>g>Page 84


PLANNING COMMITTEE MINUTES 25 JULY 2011outside edge <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk) for <str<strong>on</strong>g>the</str<strong>on</strong>g> tree located in <str<strong>on</strong>g>the</str<strong>on</strong>g> naturestrip infr<strong>on</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site in accordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g>C<strong>on</strong>diti<strong>on</strong> No.6 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.A notati<strong>on</strong> must be added to state that any works in <str<strong>on</strong>g>the</str<strong>on</strong>g> TreeProtecti<strong>on</strong> Z<strong>on</strong>e must be carried out without excavati<strong>on</strong>.h) Provisi<strong>on</strong> and specificati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> permeable paving to <str<strong>on</strong>g>the</str<strong>on</strong>g> accessways.i) Delete <str<strong>on</strong>g>the</str<strong>on</strong>g> west facing balc<strong>on</strong>ies <str<strong>on</strong>g>of</str<strong>on</strong>g> each unit.j) Skilli<strong>on</strong> ro<str<strong>on</strong>g>of</str<strong>on</strong>g>s with nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn clerestory windows over <str<strong>on</strong>g>the</str<strong>on</strong>g> rear groundfloor areas (comprising <str<strong>on</strong>g>the</str<strong>on</strong>g> family/dining).k) The shared crossover to Unit 1 and Unit 2 reduced in width to 3.6metres and <str<strong>on</strong>g>the</str<strong>on</strong>g> driveways and tandem parking spacescorresp<strong>on</strong>dingly redesigned to allow c<strong>on</strong>venient vehicular access(without reducing <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping areas in <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>tage).l) A landscape plan in accordance with C<strong>on</strong>diti<strong>on</strong> No. 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.The plan must also include planting al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> north and southboundary setbacks with a minimum mature height <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.5 metres andat least seven (7) low to medium height canopy trees throughout <str<strong>on</strong>g>the</str<strong>on</strong>g>site to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.m) Provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a comprehensive schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> materials, finishes andcolours (including colour samples).When approved, <str<strong>on</strong>g>the</str<strong>on</strong>g> plans will be endorsed and form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit.2. The development as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must not be alteredwithout <str<strong>on</strong>g>the</str<strong>on</strong>g> prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.3. This Permit will expire if ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r:• The development does not start within three (3) years from <str<strong>on</strong>g>the</str<strong>on</strong>g> date<str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit; or• The development is not completed within five (5) years <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> date <str<strong>on</strong>g>of</str<strong>on</strong>g>this Permit.The Resp<strong>on</strong>sible Authority may extend <str<strong>on</strong>g>the</str<strong>on</strong>g> times referred to if a request ismade in writing before this Permit expires or within three (3) m<strong>on</strong>ths after<str<strong>on</strong>g>the</str<strong>on</strong>g> expiry date.4. Prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> a building permit for any building or any worksauthorised by this permit, a development levy must be paid to <strong>Darebin</strong> <strong>City</strong>Council. The amount <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development levy for each charge unit must becalculated in accordance with Schedule 1 to <str<strong>on</strong>g>the</str<strong>on</strong>g> Development C<strong>on</strong>tributi<strong>on</strong>Plan Overlay.5. Before buildings and works start, a detailed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority must be submitted to, andapproved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority. When <str<strong>on</strong>g>the</str<strong>on</strong>g> Landscape Plan isapproved, it will be endorsed and will <str<strong>on</strong>g>the</str<strong>on</strong>g>n form part <str<strong>on</strong>g>of</str<strong>on</strong>g> this Permit. TheLandscape Plan must be prepared by a suitably qualified pers<strong>on</strong> and mustincorporate:a) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> six (6) medium canopy trees <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site (3 within <str<strong>on</strong>g>the</str<strong>on</strong>g>fr<strong>on</strong>t setback and 3 within <str<strong>on</strong>g>the</str<strong>on</strong>g> rear setback <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site) with aPage 85


PLANNING COMMITTEE MINUTES 25 JULY 2011minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 2 metres at <str<strong>on</strong>g>the</str<strong>on</strong>g> time <str<strong>on</strong>g>of</str<strong>on</strong>g> installati<strong>on</strong> and a minimumheight <str<strong>on</strong>g>of</str<strong>on</strong>g> 4-5 metres at maturity.b) The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> screen planting with a minimum height <str<strong>on</strong>g>of</str<strong>on</strong>g> 3 metresat maturity installed al<strong>on</strong>g <str<strong>on</strong>g>the</str<strong>on</strong>g> nor<str<strong>on</strong>g>the</str<strong>on</strong>g>rn and sou<str<strong>on</strong>g>the</str<strong>on</strong>g>rn boundaries <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> site opposite <str<strong>on</strong>g>the</str<strong>on</strong>g> building footprint <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1 and Unit 3 (between<str<strong>on</strong>g>the</str<strong>on</strong>g> western boundary and <str<strong>on</strong>g>the</str<strong>on</strong>g> garage <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 3; and <str<strong>on</strong>g>the</str<strong>on</strong>g> westernboundary and <str<strong>on</strong>g>the</str<strong>on</strong>g> study nook <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit 1).c) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all existing trees to be retained and all existing trees to beremoved, including overhanging trees <strong>on</strong> adjoining properties. Thegenus, species, height and spread <str<strong>on</strong>g>of</str<strong>on</strong>g> all trees must be specifiedd) A planting schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed vegetati<strong>on</strong> detailing <str<strong>on</strong>g>the</str<strong>on</strong>g> botanicalname, comm<strong>on</strong> name, size at maturity and quantities <str<strong>on</strong>g>of</str<strong>on</strong>g> all plantse) Details <str<strong>on</strong>g>of</str<strong>on</strong>g> all surfaces including lawns, mulched garden beds andhard paving (such as asphalt, c<strong>on</strong>crete, brick or gravel)f) Street trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> nature strip/s adjacent to <str<strong>on</strong>g>the</str<strong>on</strong>g> propertyg) All c<strong>on</strong>structed items including retaining walls, letter boxes, garbagebin receptacles, outdoor furniture, lighting, clo<str<strong>on</strong>g>the</str<strong>on</strong>g>slines etch) Edge treatment between grass (lawn) and garden bedsi) An outline <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> approved building/s including any basement, <str<strong>on</strong>g>the</str<strong>on</strong>g>locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> entry doors, windows, gates and fences. An outline <str<strong>on</strong>g>of</str<strong>on</strong>g>buildings <strong>on</strong> adjoining land, including <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> windows anddoors which face <str<strong>on</strong>g>the</str<strong>on</strong>g> subject site must also be shownj) The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> both existing and proposed overhead andunderground services. C<strong>on</strong>flicts <str<strong>on</strong>g>of</str<strong>on</strong>g> such services with <str<strong>on</strong>g>the</str<strong>on</strong>g> existingand proposed planting must be avoidedk) Clear graphics identifying trees (deciduous and evergreen), shrubs,groundcovers and climbersl) A scale, North Point and appropriate legend.The species <str<strong>on</strong>g>of</str<strong>on</strong>g> all proposed plants selected must be to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.6. Before buildings and works (including demoliti<strong>on</strong>) start, a tree protecti<strong>on</strong>fence must be erected around <str<strong>on</strong>g>the</str<strong>on</strong>g> naturestrip tree at a radius <str<strong>on</strong>g>of</str<strong>on</strong>g> 2.0 metresfrom <str<strong>on</strong>g>the</str<strong>on</strong>g> base <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> trunk to define a ‘tree protecti<strong>on</strong> z<strong>on</strong>e’.This fence must be c<strong>on</strong>structed <str<strong>on</strong>g>of</str<strong>on</strong>g> star pickets and chain mesh (or similar)to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.The tree protecti<strong>on</strong> fence must remain in place until c<strong>on</strong>structi<strong>on</strong> iscompleted.No vehicular or pedestrian access, trenching or soil excavati<strong>on</strong> is to occurwithin <str<strong>on</strong>g>the</str<strong>on</strong>g> tree protecti<strong>on</strong> z<strong>on</strong>e.No storage or dumping <str<strong>on</strong>g>of</str<strong>on</strong>g> tools, equipment or waste is to occur within <str<strong>on</strong>g>the</str<strong>on</strong>g>tree protecti<strong>on</strong> z<strong>on</strong>e.The ground surface <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> tree protecti<strong>on</strong> z<strong>on</strong>e must be covered by aprotective 100mm deep layer <str<strong>on</strong>g>of</str<strong>on</strong>g> mulch prior to <str<strong>on</strong>g>the</str<strong>on</strong>g> developmentPage 86


PLANNING COMMITTEE MINUTES 25 JULY 2011commencing and be watered regularly to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.7. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must becompleted to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority before <str<strong>on</strong>g>the</str<strong>on</strong>g>development is occupied and/or <str<strong>on</strong>g>the</str<strong>on</strong>g> use starts or at such later date as isapproved by <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority in writing.No later than seven (7) days after <str<strong>on</strong>g>the</str<strong>on</strong>g> completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping, <str<strong>on</strong>g>the</str<strong>on</strong>g>permit holder must advise Council, in writing, that <str<strong>on</strong>g>the</str<strong>on</strong>g> landscaping hasbeen completed.8. The landscaping as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan must bemaintained, and any dead, diseased or damaged plant replaced inaccordance with <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed Landscape Plan to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority.9. Floor levels shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans must be c<strong>on</strong>firmed. Thec<strong>on</strong>firmati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground floor level must take place no later than at <str<strong>on</strong>g>the</str<strong>on</strong>g>time <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> subfloor <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development required under <str<strong>on</strong>g>the</str<strong>on</strong>g>Building Act 1993 and <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Regulati<strong>on</strong>s 2006. This c<strong>on</strong>firmati<strong>on</strong>must be in <str<strong>on</strong>g>the</str<strong>on</strong>g> form <str<strong>on</strong>g>of</str<strong>on</strong>g> a report from a licensed land surveyor and must besubmitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority no later than 7 days from <str<strong>on</strong>g>the</str<strong>on</strong>g> date<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sub-floor inspecti<strong>on</strong>. The upper floor levels must be c<strong>on</strong>firmedbefore a Certificate <str<strong>on</strong>g>of</str<strong>on</strong>g> Occupancy is issued, by a report from a licensedland surveyor submitted to <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.10. All dwellings that share dividing walls and/or floors must be c<strong>on</strong>structed tolimit noise transmissi<strong>on</strong> in accordance with Part F(5) <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Building Code<str<strong>on</strong>g>of</str<strong>on</strong>g> Australia.11. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> dwellings are occupied, an automatic external lighting systemcapable <str<strong>on</strong>g>of</str<strong>on</strong>g> illuminating <str<strong>on</strong>g>the</str<strong>on</strong>g> entry to each unit, access to each garage andcar parking space and all pedestrian walkways must be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>land to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.The external lighting must be designed, baffled and/or located to ensurethat no loss <str<strong>on</strong>g>of</str<strong>on</strong>g> amenity is caused to adjoining and nearby land, to <str<strong>on</strong>g>the</str<strong>on</strong>g>satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.12. Boundary walls facing adjoining properties must be cleaned and finished to<str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.13. The land must be drained to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.14. With <str<strong>on</strong>g>the</str<strong>on</strong>g> excepti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> guttering, rainheads and downpipes, all pipes,fixtures, fittings and vents servicing any building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land must bec<strong>on</strong>cealed in service ducts or o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise hidden from view to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.15. No plant, equipment, services or architectural features o<str<strong>on</strong>g>the</str<strong>on</strong>g>r than thoseshown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plans are permitted above <str<strong>on</strong>g>the</str<strong>on</strong>g> ro<str<strong>on</strong>g>of</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>building/s without <str<strong>on</strong>g>the</str<strong>on</strong>g> prior written c<strong>on</strong>sent <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.16. Provisi<strong>on</strong> must be made <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> land for letter boxes and receptacles fornewspapers to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Page 87


PLANNING COMMITTEE MINUTES 25 JULY 201117. Before occupati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> development, areas set aside for <str<strong>on</strong>g>the</str<strong>on</strong>g> parking <str<strong>on</strong>g>of</str<strong>on</strong>g>vehicles and access lanes as shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plan(s) must be:a) C<strong>on</strong>structed;b) Properly formed to such levels that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can be used in accordancewith <str<strong>on</strong>g>the</str<strong>on</strong>g> plans;c) Surfaced with an all wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r sealcoat; andd) Drainedto <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.Car spaces, access lanes and driveways shown <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> endorsed plansmust not be used for any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r purpose.18. Before <str<strong>on</strong>g>the</str<strong>on</strong>g> development is occupied, vehicular crossing(s) must bec<strong>on</strong>structed to align with approved driveways to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>Resp<strong>on</strong>sible Authority. All redundant crossing(s) or crossing opening(s)must be removed and replaced with footpath, naturestrip and kerb andchannel to <str<strong>on</strong>g>the</str<strong>on</strong>g> satisfacti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Resp<strong>on</strong>sible Authority.CARRIEDPage 88


PLANNING COMMITTEE MINUTES 25 JULY 20116. OTHER BUSINESS6.1 List <str<strong>on</strong>g>of</str<strong>on</strong>g> Scheduled VCAT AppealsFollowing is a list <str<strong>on</strong>g>of</str<strong>on</strong>g> scheduled VCAT appeals for <str<strong>on</strong>g>the</str<strong>on</strong>g> informati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning Committee.The table includes appeals heard as well as those scheduled for <str<strong>on</strong>g>the</str<strong>on</strong>g> coming m<strong>on</strong>ths.Decisi<strong>on</strong>s underlined not in accordance with delegate’s recommendati<strong>on</strong>.COMMITTEE DECISIONMOVED:SECONDED:Cr. N. KatsisCr. S. TsitasTHAT <str<strong>on</strong>g>the</str<strong>on</strong>g> list <str<strong>on</strong>g>of</str<strong>on</strong>g> Scheduled VCAT Appeals be noted.CARRIEDPage 89


PLANNING COMMITTEE MINUTES 25 JULY 2011DELEGATE DECISIONS BEFORE VCATMarch 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultTue 8Wed 9D158/2010D361/20109 Albert Street Prest<strong>on</strong>Cazaly48 Raleigh StreetThornburyRuckerC<strong>on</strong>struct a dwelling to <str<strong>on</strong>g>the</str<strong>on</strong>g>rear <str<strong>on</strong>g>of</str<strong>on</strong>g> existing and alteraccess to a road in aRoad Z<strong>on</strong>e Category 1Extensi<strong>on</strong> to a dwelling <strong>on</strong>a lot less than 300m2PermitC<strong>on</strong>diti<strong>on</strong>sreviewNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealC<strong>on</strong>diti<strong>on</strong>svariedPermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>(in part)Delegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Wed 23Wed 23D348/2010D268/201092 Delaware StreetReservoirLa Trobe232 Victoria RoadNorthcoteRuckerC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> two (2)single storey dwellings to<str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existingdwellingC<strong>on</strong>struct four (4) doublestorey dwellingsNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>C<strong>on</strong>diti<strong>on</strong>sreviewPermit Delegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>PermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Tue 29D225/2010120 Gladst<strong>on</strong>e AveNorthcoteRuckerC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> crossoverRefusalApplicantappealPermitDelegate decisi<strong>on</strong>overturnedPage 90


PLANNING COMMITTEE MINUTES 25 JULY 2011March 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultTue 29D929/200936 Pickett StreetReservoirLa TrobeC<strong>on</strong>struct four (4)dwellingsPermitC<strong>on</strong>diti<strong>on</strong>sreviewPermitParties in agreementDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>(in part)April 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultM<strong>on</strong> 4(2 days) D662/20081 Elizabeth StreetNorthcoteRuckerC<strong>on</strong>struct three (3)dwellingsRefusalApplicantappealagainstfailure todetermineRefusalDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Wed 6D311/201076 <strong>Darebin</strong> BoulevardReservoirLa TrobeC<strong>on</strong>struct four (4)dwellingsNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealPermit Delegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Page 91


PLANNING COMMITTEE MINUTES 25 JULY 2011April 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultThu 7D913/200935 Elsey Road ReservoirLa TrobeC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> three (3)double storey dwellingsRefusalApplicantappealRefusalDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Tue 12D121/201023 Marjorie StreetPrest<strong>on</strong>CazalyC<strong>on</strong>struct two (2) doublestorey dwellingsPermitC<strong>on</strong>diti<strong>on</strong>sreviewPermitParties in agreementDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g> (inpart)Thu 21D309/201021 Miller StreetThornburyCazalyC<strong>on</strong>struct two (2) doublestorey dwellingsRefusalApplicantappealPermitDelegate decisi<strong>on</strong>overturnedPage 92


PLANNING COMMITTEE MINUTES 25 JULY 2011May 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultFri 6D856/201018 Ross Street Alphingt<strong>on</strong>RuckerC<strong>on</strong>struct a dwelling <strong>on</strong>land affected by an interimheritage overlayNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealPermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>M<strong>on</strong> 9D870/2009300 Clarke StreetNorthcoteRuckerC<strong>on</strong>struct two (2) doublestorey dwellingsNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>(had anappealagainstfailure todeterminenot beenlodged)PermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>ApplicantappealTue 10D5/201029 Anders<strong>on</strong> RoadThornburyCazalyGround and upper leveladditi<strong>on</strong>s and reducti<strong>on</strong> in<str<strong>on</strong>g>the</str<strong>on</strong>g> car parkingrequirementNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealRefusalDelegate decisi<strong>on</strong> overturnedPage 93


PLANNING COMMITTEE MINUTES 25 JULY 2011May 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultWed 25D616/20109 Mihil Street Prest<strong>on</strong>CazalyC<strong>on</strong>struct 3 dwellingsNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealPermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>June 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultFri 3Tue 21D479/2010D855/20091 Morgan Street Prest<strong>on</strong>Cazaly145B Stati<strong>on</strong> StreetFairfieldRuckerC<strong>on</strong>struct a double storeydwelling to <str<strong>on</strong>g>the</str<strong>on</strong>g> rear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>existing dwelling (dualoccupancy)Buildings and works;increase seating capacity<str<strong>on</strong>g>of</str<strong>on</strong>g> existing restaurant (52to 72 seats) and waivingcar parking requirementNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealPermitPermitDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Delegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g>Page 94


PLANNING COMMITTEE MINUTES 25 JULY 2011July 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultWed 6D637/20101 Nisbett StreetReservoirCazalyC<strong>on</strong>struct 2 dwellings(dual occupancy)RefusalApplicantappealDecisi<strong>on</strong>pendingWed 13D283/201026 Youngman StreetPrest<strong>on</strong>CazalyC<strong>on</strong>struct 2 dwellings(dual occupancy)PermitC<strong>on</strong>diti<strong>on</strong>sreviewPermitParties in agreementDelegate decisi<strong>on</strong> up<str<strong>on</strong>g>held</str<strong>on</strong>g> (inpart)Wed 20D182/2009/A22 Reid Street NorthcoteSecti<strong>on</strong> 72 amendment to<str<strong>on</strong>g>the</str<strong>on</strong>g> plansNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealDecisi<strong>on</strong>pendingPage 95


PLANNING COMMITTEE MINUTES 25 JULY 2011August 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward ProposalCouncilDecisi<strong>on</strong>/Nature <str<strong>on</strong>g>of</str<strong>on</strong>g>AppealVCATDecisi<strong>on</strong>ResultTue 29.00amD938/20101 / 29 Bart<strong>on</strong> StreetReservoirLa TrobeUpper storey additi<strong>on</strong> toan existing dwelling <strong>on</strong> alot less than 300 sq.mNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealThu 410.00amD692/2010107 Gilbert RoadPrest<strong>on</strong>CazalyUse <str<strong>on</strong>g>of</str<strong>on</strong>g> land for ac<strong>on</strong>venience restaurant(pizzeria/cafe), display <str<strong>on</strong>g>of</str<strong>on</strong>g>advertising signage andc<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a flueNotice <str<strong>on</strong>g>of</str<strong>on</strong>g>Decisi<strong>on</strong>ObjectorappealFri 192.15pmD740/2010612 Murray RoadPrest<strong>on</strong>CazalyC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 4 attached2-storey dwellings withro<str<strong>on</strong>g>of</str<strong>on</strong>g>-top decksRefusal (hadan appealagainstfailure todeterminenot beenlodged)ApplicantappealPage 96


PLANNING COMMITTEE MINUTES 25 JULY 2011PLANNING COMMITTEE DECISIONS BEFORE VCATMarch 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingFri 4App No. Property / Ward Proposal Council Decisi<strong>on</strong>D803/200915 Rushall StreetFairfieldRuckerC<strong>on</strong>struct two (2)dwellings – <strong>on</strong>e(1) <strong>on</strong> each lotless than 300m2RefusalVCATDecisi<strong>on</strong>PermitCouncildecisi<strong>on</strong>overturnedKey Reas<strong>on</strong>s / Comments Two storey built form comm<strong>on</strong> instreet. Proposed first floors are recessed. No parking problems / restricti<strong>on</strong>sevident in street. Mixed pattern <str<strong>on</strong>g>of</str<strong>on</strong>g> development lendssupport to <str<strong>on</strong>g>the</str<strong>on</strong>g> side-by-side buildingtypology. Proposal maintains amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> itsneighbours.Wed 23(1 day)D427/200925 CunninghamStreet NorthcoteRuckerC<strong>on</strong>struct four (4)dwellingsRefusalRefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g> Site is well located. Heritage Overlay – demoliti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>existing dwelling not in issue –proposed dwellings must resp<strong>on</strong>d to<str<strong>on</strong>g>the</str<strong>on</strong>g> area. Proposed fr<strong>on</strong>t setback inadequate. Two storey massing at rear is notrespectful <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>area.Page 97


PLANNING COMMITTEE MINUTES 25 JULY 2011March 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingThu 24App No. Property / Ward Proposal Council Decisi<strong>on</strong>D621/2009156 Wood StreetPrest<strong>on</strong>CazalyC<strong>on</strong>struct four (4)dwellingsRefusalVCATDecisi<strong>on</strong>RefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g>Key Reas<strong>on</strong>s / Comments The site is suitable for a mediumdensity development. No unreas<strong>on</strong>able amenity impacts <strong>on</strong>neighbouring properties. The proposal is flawed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> basis<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> creati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a triple crossoverarrangement which is unacceptablefrom a pedestrian amenity andstreetscape perspective. Internal amenity <str<strong>on</strong>g>of</str<strong>on</strong>g> proposed smaller2 nd dwelling is poor i.e. <strong>on</strong>e dwellingtoo many.Thu 31(2 days)D83/2010461 St GeorgesRoad ThornburyCazalyC<strong>on</strong>struct a three(3) storey buildingcomprising ashop and 8dwellings andreducti<strong>on</strong> in carparkingRefusalRefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g> Internal amenity flawed – <str<strong>on</strong>g>the</str<strong>on</strong>g> solereas<strong>on</strong> for refusal. Built form / envelope <str<strong>on</strong>g>of</str<strong>on</strong>g> proposalacceptable (subject to minorchanges). Limited external amenity impacts <strong>on</strong>neighbours. Car parking waiver acceptable fordwellings.Page 98


PLANNING COMMITTEE MINUTES 25 JULY 2011April 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingTue 12App No. Property / Ward Proposal Council Decisi<strong>on</strong>D223/20104 Henry StreetReservoirCazalyC<strong>on</strong>struct six (6)dwellingsRefusalVCATDecisi<strong>on</strong>PermitCouncildecisi<strong>on</strong>overturnedKey Reas<strong>on</strong>s / Comments The site is suitable for a mediumdensity development. The Tribunal commented that“neighbourhood character policiesare not mandatory standards and areto be balanced against o<str<strong>on</strong>g>the</str<strong>on</strong>g>rpolicies”. The proposal respects <str<strong>on</strong>g>the</str<strong>on</strong>g> preferredneighbourhood character. Double storey form in <str<strong>on</strong>g>the</str<strong>on</strong>g> rear yard issatisfactory in this c<strong>on</strong>text because<str<strong>on</strong>g>the</str<strong>on</strong>g> upper floor side setbacks aregenerous. The proposal is not anoverdevelopment and achieves broadcompliance with <str<strong>on</strong>g>the</str<strong>on</strong>g> PlanningScheme.Page 99


PLANNING COMMITTEE MINUTES 25 JULY 2011April 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingTue 19App No. Property / Ward Proposal Council Decisi<strong>on</strong>D961/2009135 Smith StreetThornburyCazalyC<strong>on</strong>struct four (4)dwellingsRefusalVCATDecisi<strong>on</strong>PermitCouncildecisi<strong>on</strong>overturnedKey Reas<strong>on</strong>s / Comments The site is well located with goodaccess to public transport and withinclose proximity to activity centers andMelbourne’s CBD. The proposed two storey buildingsatisfies <str<strong>on</strong>g>the</str<strong>on</strong>g> policy at Clause 22.04with regard to maintaining <str<strong>on</strong>g>the</str<strong>on</strong>g>predominant scale within SmithStreet and ensuring goodlandscaping can occur. Amenity impacts <strong>on</strong> adjoiningresidential properties have beenaddressed through an appropriatedesign resp<strong>on</strong>se, including materialsand fenestrati<strong>on</strong> which add interestand articulati<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> built form. Private open space areas and carparking is provided in accordancewith ResCode standards.Thu 21D562/2009126 Rene StreetPrest<strong>on</strong>CazalyUse and develop<str<strong>on</strong>g>the</str<strong>on</strong>g> land for two(2) double storeydwellingsRefusalRefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g> Compatibility with broader State andlocal policies, while neighbourhoodcharacter not in issue. The major flaws include poor internalamenity, inadequate provisi<strong>on</strong> forwaste storage and no <strong>on</strong>-site parkingfor ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r dwelling. There was a previous permit thatallowed <strong>on</strong>e dwelling; two dwellings isan overdevelopment.Page 100


PLANNING COMMITTEE MINUTES 25 JULY 2011May 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingM<strong>on</strong> 2App No. Property / Ward Proposal Council Decisi<strong>on</strong>D419/2010197 Wingrove StreetFairfieldRuckerC<strong>on</strong>struct seven(7) dwellingsRefusalVCATDecisi<strong>on</strong>RefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g>Key Reas<strong>on</strong>s / Comments The amended plans lodged at VCATdid not address <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>planning</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficer’sc<strong>on</strong>diti<strong>on</strong> 1 requirements. The proposed design will result in anegative and unreas<strong>on</strong>able impact <strong>on</strong><str<strong>on</strong>g>the</str<strong>on</strong>g> established character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area. Unreas<strong>on</strong>able levels <str<strong>on</strong>g>of</str<strong>on</strong>g> visual bulkincluding unarticulated side walls andinc<strong>on</strong>gruous cantilevered buildingelement presenting to <str<strong>on</strong>g>the</str<strong>on</strong>g> street. Minimal opportunities for ‘s<str<strong>on</strong>g>of</str<strong>on</strong>g>tening’landscape to <str<strong>on</strong>g>the</str<strong>on</strong>g> fr<strong>on</strong>t and sides.M<strong>on</strong> 2D104/200931 Shiers StreetAlphingt<strong>on</strong>RuckerC<strong>on</strong>struct two (2)double storeydwellingsRefusalRefusalCouncildecisi<strong>on</strong>up<str<strong>on</strong>g>held</str<strong>on</strong>g> Interim heritage c<strong>on</strong>trol wasintroduced after <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> wasreported to <str<strong>on</strong>g>the</str<strong>on</strong>g> Planning Committee. The objectors called <str<strong>on</strong>g>planning</str<strong>on</strong>g>evidence; <str<strong>on</strong>g>the</str<strong>on</strong>g> permit applicant didnot. On <str<strong>on</strong>g>the</str<strong>on</strong>g> basis <str<strong>on</strong>g>of</str<strong>on</strong>g> evidence presented,c<strong>on</strong>sistency <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> street andintactness <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing house, <str<strong>on</strong>g>the</str<strong>on</strong>g>Tribunal formed <str<strong>on</strong>g>the</str<strong>on</strong>g> opini<strong>on</strong> that apermit should not be granted. The Tribunal also commented that:“I think it was difficult, <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> materialavailable to <str<strong>on</strong>g>the</str<strong>on</strong>g> [<str<strong>on</strong>g>planning</str<strong>on</strong>g>] <str<strong>on</strong>g>of</str<strong>on</strong>g>ficers, tosufficiently fault this proposal so as towarrant its refusal”.Page 101


PLANNING COMMITTEE MINUTES 25 JULY 2011May 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingThu 5App No. Property / Ward Proposal Council Decisi<strong>on</strong>D317/201014 Ludeman CourtReservoirLa TrobeC<strong>on</strong>struct five (5)single-storeydwellingsRefusalVCATDecisi<strong>on</strong>PermitCouncildecisi<strong>on</strong>overturnedKey Reas<strong>on</strong>s / Comments The site is in a locality whereincreased housing diversity and stockcan occur. The site has reas<strong>on</strong>able access topublic transport and to local shops inHughes Parade. The provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> secluded privateopen space and <strong>on</strong>-site car parkingspaces meet <str<strong>on</strong>g>the</str<strong>on</strong>g> relevant ResCodeobjectives. The Tribunal indicated that it hasfrequently commented that:“… a development need not imitate<str<strong>on</strong>g>the</str<strong>on</strong>g> neighbourhood buildings in orderto be “respectful” <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>neighbourhood’s character. It hasalso frequently pointed out that <str<strong>on</strong>g>the</str<strong>on</strong>g>mere fact <str<strong>on</strong>g>of</str<strong>on</strong>g> change being visibledoes not itself mean that that changeis unacceptable”.Fri 6D799/200924 Madeline StreetPrest<strong>on</strong>CazalyC<strong>on</strong>struct two (2)double storeydwellingsRefusalInterimOrder –Decisi<strong>on</strong>pendingThe Permit Applicant has circulatedamended plans and Council hasresp<strong>on</strong>ded by <str<strong>on</strong>g>the</str<strong>on</strong>g> Tribunal’s 1 July 2011deadline.Page 102


PLANNING COMMITTEE MINUTES 25 JULY 2011May 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingM<strong>on</strong> 9App No. Property / Ward Proposal Council Decisi<strong>on</strong>D914/200911A Archibold StreetThornburyRuckerC<strong>on</strong>struct three(3) dwellingsRefusalVCATDecisi<strong>on</strong>PermitCouncildecisi<strong>on</strong>overturnedKey Reas<strong>on</strong>s / Comments The site is suitable for a mediumdensity development. Three (3) dwelling proposed – twodouble storey and <strong>on</strong>e three storey. While <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal is acceptable, <str<strong>on</strong>g>the</str<strong>on</strong>g>three storey form was deemedinc<strong>on</strong>sistent with <str<strong>on</strong>g>the</str<strong>on</strong>g> character <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>area. The Tribunal c<strong>on</strong>sidered that deleti<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> third storey will ensure anappropriate building height transiti<strong>on</strong>and will result in <strong>on</strong>e less car parkingspace being required i.e. 3 bedroomdwelling now 2 bedroom.M<strong>on</strong> 16D584/201022 Hickford StreetReservoirLa TrobeC<strong>on</strong>struct four (4)single storeydwellingsRefusalPermitCouncildecisi<strong>on</strong>overturned ‘On <str<strong>on</strong>g>the</str<strong>on</strong>g> spot’ decisi<strong>on</strong> by <str<strong>on</strong>g>the</str<strong>on</strong>g> Tribunal. The Tribunal indicated that <str<strong>on</strong>g>the</str<strong>on</strong>g> site’ssuitable locati<strong>on</strong> and compliance withResCode (including limited amenityimpacts <strong>on</strong> neighbours) ensures abroadly acceptable <str<strong>on</strong>g>planning</str<strong>on</strong>g>outcome.Wed 25D438/201091 <strong>Darebin</strong>Boulevard ReservoirLa TrobeC<strong>on</strong>struct four (4)new single storeydwellingsRefusalDecisi<strong>on</strong>pendingPage 103


PLANNING COMMITTEE MINUTES 25 JULY 2011June 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingApp No. Property / Ward Proposal Council Decisi<strong>on</strong>VCATDecisi<strong>on</strong>Key Reas<strong>on</strong>s / CommentsThu 16D168/200952 Showers StreetPrest<strong>on</strong>CazalyC<strong>on</strong>struct nine (9)dwellingsRefusalDecisi<strong>on</strong>pendingJuly 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingTue 5App No. Property / Ward Proposal Council Decisi<strong>on</strong>D108/201079-81 MansfieldStreet ThornburyCazalyC<strong>on</strong>struct twelve(12) dwellingswithin a 3 storeybuildingRefusalApplicant appealagainst failure todetermineVCATDecisi<strong>on</strong>Decisi<strong>on</strong>pendingKey Reas<strong>on</strong>s / CommentsM<strong>on</strong> 25(1 day)D605/201019-25 & 29 StGeorges RoadNorthcoteRuckerUse as a farmersmarket, reducti<strong>on</strong>in car parking anderecti<strong>on</strong> anddisplay <str<strong>on</strong>g>of</str<strong>on</strong>g>advertisingsignage <strong>on</strong> landwithin a HeritageOverlayNotice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong>Objector appealDecisi<strong>on</strong>pendingPage 104


PLANNING COMMITTEE MINUTES 25 JULY 2011August 2011Date/Time <str<strong>on</strong>g>of</str<strong>on</strong>g>HearingFri 2610.00am D437/2010M<strong>on</strong> 2910.00amM<strong>on</strong> 2910.00am(2 days)App No. Property / Ward Proposal Council Decisi<strong>on</strong>D451/2010D545/2010948 High StreetReservoirLa Trobe88 RathminesStreet FairfieldRucker388-390 HighStreet NorthcoteRuckerC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a3 storey building,reducti<strong>on</strong> in carparkingassociated withuse as a shopand 7 dwellings,and waive loadingbay requirementsTwo storeyapartmentbuildingcomprising 8dwellings with 10car parkingspacesC<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a7 storey mixedusedevelopment(plus basements)comprising 44dwellings, 3 retailtenancies, 3<str<strong>on</strong>g>of</str<strong>on</strong>g>fices, reducti<strong>on</strong>in car and bicycleparking, andwaive loading bayrequirementsDecisi<strong>on</strong>s underlined not in accordance with delegate’s recommendati<strong>on</strong>Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong>Objector appealNotice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong>Objector appealRefusalVCATDecisi<strong>on</strong>Key Reas<strong>on</strong>s / CommentsPage 105


PLANNING COMMITTEE MINUTES 25 JULY 20116.2 Significant Applicati<strong>on</strong>s UpdateBelow is a list <str<strong>on</strong>g>of</str<strong>on</strong>g> applicati<strong>on</strong>s with a cost <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> at least $3,000,000 currentlyunder c<strong>on</strong>siderati<strong>on</strong>.• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• 340 Plenty Road, Prest<strong>on</strong>• Cazaly• D326/2010• The c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentcomprising 24 dwellings and a shop• 31 May 2010• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> to Grant a Planning Permitissued• Shop 1/115 Victoria Road, Northcote• Rucker• D682/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentcomprising 20 dwellings and a shop within a four(4) storey building• 30 September 2010• Refusal to Grant a Planning Permit issued• 205 Bell Street, Prest<strong>on</strong> (Bell <strong>City</strong>)• Cazaly• D700/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentcomprising, dwellings, residential hotel,functi<strong>on</strong>/c<strong>on</strong>ference centre, food and drinkpremises and <str<strong>on</strong>g>of</str<strong>on</strong>g>fices• 30 September 2010• Awaiting amended plans to be submitted• 215 Bell Street, Prest<strong>on</strong> (Bell <strong>City</strong>)• Cazaly• D704/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an <str<strong>on</strong>g>of</str<strong>on</strong>g>fice building• 30 September 2010• Awaiting amended plans to be submitted• 1/62 Oakover Road, Prest<strong>on</strong>• Cazaly• D776/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a residential developmentc<strong>on</strong>taining 50 dwellings• 22 October 2010• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 285 Plenty Road, Prest<strong>on</strong>• Cazaly• D793/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a residential developmentc<strong>on</strong>taining 24 dwellings over six (6) storeys• 29 October 2010• Advertising completedPage 106


PLANNING COMMITTEE MINUTES 25 JULY 2011• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• 350 Murray Road, Prest<strong>on</strong>• Cazaly• D980/2010• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use development withina seven (7) storey building• 30 December 2010• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 161-195 High Street, Prest<strong>on</strong> (Windsor Smith)• Cazaly• D75/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an eight (8) storey buildingc<strong>on</strong>taining dwellings• 17 February 2011• Currently advertising• 67-69 High Street, Prest<strong>on</strong>• Cazaly• D79/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 85 dwellings and four (4) shops withinan 11 storey building• 21 February 2011• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 7 Warrs Avenue, Prest<strong>on</strong>• Cazaly• D112/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a six (6) storey buildingc<strong>on</strong>taining 42 dwellings• 25 February 2011• Notice <str<strong>on</strong>g>of</str<strong>on</strong>g> Decisi<strong>on</strong> to Grant a Planning Permitissued• 55Tyler Street, Prest<strong>on</strong>• Cazaly• D113/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a two (2) storey buildingc<strong>on</strong>taining classrooms.• 1 March 2011• Initial assessment• 58 Clarend<strong>on</strong> Street, Thornbury• Rucker• D114/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a three (3) storey buildingc<strong>on</strong>taining 16 dwellings• 2 March 2011• Advertising completed• 1091 Plenty Road, Bundoora (Smorgy’s site)• La Trobe• D173/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 551 dwellings, nine (9) food and drinkpremises, a c<strong>on</strong>ference centre, within buildingsup to 10 storeysPage 107


PLANNING COMMITTEE MINUTES 25 JULY 2011• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• 23 March 2011• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 264-266 Raglan Street, Prest<strong>on</strong>• Cazaly• D179/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 77 dwellings and a shop within aseven (7) storey building• 24 March 2011• Planning Permit issued• 314-326 Gooch Street, Thornbury• Rucker• D213/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a residential developmentc<strong>on</strong>taining 63 dwellings and removal <str<strong>on</strong>g>of</str<strong>on</strong>g> nativevegetati<strong>on</strong>s• 5 April 2011• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 43-47 Simps<strong>on</strong> Street, Northcote• Rucker• D247/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 21 dwellings two (2) home <str<strong>on</strong>g>of</str<strong>on</strong>g>fices anda shop within a three (3) storey building• 12 April 2011• Initial assessment• 10 Clinch Avenue, Prest<strong>on</strong>• Cazaly• D251/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a multi level residentialdevelopment c<strong>on</strong>taining 95 dwellings• 14 April 2011• Initial assessment• 154-156 High Street, Prest<strong>on</strong>• Cazaly• D311/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 49 dwellings and two (2) shops withina seven (7) storey building• 5 May 2011• Initial assessment• 445 High Street, Northcote• Rucker• D319/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 97 dwellings and five (5) commercialpremises within a multi level building• 6 May 2011• Currently advertising• 600-606 Plenty Road, Prest<strong>on</strong>• CazalyPage 108


PLANNING COMMITTEE MINUTES 25 JULY 2011• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• Address• Ward• Applicati<strong>on</strong> No• ProposalDescripti<strong>on</strong>• Date Received• Status• D320/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a five (5) level residentialdevelopment c<strong>on</strong>taining 50 dwellings• 6 May 2011• Initial assessment• 2/3A Newlands Road, Reservoir• La Trobe• D374/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining nine (9) warehouse/showrooms and<strong>on</strong>e (1) food and drink premises• 24 May 2011• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 69 Edwardes Street, Reservoir• La Trobe• D399/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a multi unit development• 30 May 2011• Request for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r informati<strong>on</strong> sent• 677 Plenty Road, Reservoir• Cazaly• D404/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 48 dwellings and two (2) commercialpremises within a multi level building• 31 May 2011• Initial assessment• 679-685 High Street, Thornbury• Rucker• D431/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining ground floor retail and residential over(5) storeys• 8 June 2011• Initial assessment• 22-30 Chifley Drive, Prest<strong>on</strong>• Cazaly• D460/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a building for warehousing• 16 June 2011• Initial assessment• 56-58 St Georges Road, Northcote• Rucker• D481/2011• C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a mixed use developmentc<strong>on</strong>taining 35 dwellings and two (2) ground floorshops within a six (6) level building• 23 June 2011• Awaiting initial assessmentPage 109


PLANNING COMMITTEE MINUTES 25 JULY 2011COMMITTEE DECISIONMOVED:SECONDED:Cr. N. KatsisCr. S. TsitasTHAT <str<strong>on</strong>g>the</str<strong>on</strong>g> Significant Applicati<strong>on</strong>s Update be noted.CARRIEDPage 110


PLANNING COMMITTEE MINUTES 25 JULY 20117. CLOSE OF MEETINGThe <str<strong>on</strong>g>meeting</str<strong>on</strong>g> closed at 6.08pm.Page 111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!