13.07.2015 Views

Chambal_Naratives 12.cdr - Chambal Fertilisers - Home

Chambal_Naratives 12.cdr - Chambal Fertilisers - Home

Chambal_Naratives 12.cdr - Chambal Fertilisers - Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annexure “A” to Directors' ReportDisclosure of Particulars with respect to Conservation of Energy:a) Energy conservation measures taken • Use of washing column off gases of Urea-I Plant as Primary reformer fuel in Ammonia-I Plant. • Installation of control valve in refrigeration compressor to avoid recycling in Ammonia-II plant. • Installation of Lube oil accumulators in Urea-I, Urea-II & Ammonia-II Plant compressors to enhancestability/reliability. • Installation of variable frequency drives in various motors in Gadepan-I & Gadepan-II Plants. • Replacement of GSL (General lighting service) with CFL (Compact Fluorescent Lamp) at various locations intownship.b) Additional investments and proposals, if any, being implemented for reduction of consumption of energy;Your Company has taken up a major project for energy conservation & partial de-bottlenecking for bothGadepan-I & II plants. The project is under implementation and is scheduled for commissioning by April 2009.c) Impact of the measures at (a) and (b) above for the reduction of energy consumption and consequent impacton the cost of production of goodsThe energy conservation project will result in reduction of energy by 2 to 3%.Ad) Total energy consumption and energy consumption per unit of productionAs per Form 'A' given below.FORM AParticulars Unit Current Year Previous YearPOWER & FUEL CONSUMPTION1. Electricitya) PurchasedQuantity MWH 89,393.48 73,720.59Total Amount Rs. Lac 2832.63 2205.91Rate/Unit Rs./KWH 3.17 2.99b) Own Generationi] Through diesel generatorQuantity MWH 6,290.21 1,658.21Unit per KL of Furnace oil KWH 4.05 3.40Unit per KL of HSD KWH 3.50 3.60Cost/unit Rs./KWH 6.39 8.73ii] Through Steam turbine / generatorQuantity MWH 160,073.44 156,521.453Unit per SM of Gas3KWH/SM 2.57 2.53Cost/unit Rs./KWH 2.62 2.432. Coal (specify quality and where used)Quantity KG N.A 9,600.00Total Cost Rs. Lac N.A 1.20Average Rate Rs./Kg N.A 12.443. Furnace oilQuantity KL 1,292.68 1,477.79Total cost Rs. Lac 303.92 294.95Average Rate /Unit Rs./KL 23,510.94 19,958.734. OTHERS/INTERNAL GENERATIONa) Natural Gas ( Ammonia-Fuel,Power & Steam)Quantity31000SM 479,396.64 479,396.64Total cost Rs.Lac 35013.77 35013.77Average Rate /Unit3Rs./1000SM 7,303.72 7,303.72b) Naphtha ( Ammonia-Fuel,Power & Steam)Quantity MT 48,201.07 48,475.44Total cost Rs. Lac 16862.74 14223.35Average Rate /Unit Rs./MT 34,984.16 29,341.3526

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!