13.07.2015 Views

210-MS, 220-MS, or 225-MS Ion Trap Mass Spectrometer Pre ...

210-MS, 220-MS, or 225-MS Ion Trap Mass Spectrometer Pre ...

210-MS, 220-MS, or 225-MS Ion Trap Mass Spectrometer Pre ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ContentsIntroduction ................................................................... 2Safety ...................................................................... 2Bef<strong>or</strong>e the Installation ................................................... 3User Representative ................................................ 3Entrance .................................................................. 3Bench Space and Load ........................................... 3GC/<strong>MS</strong> with the 431-GC .......................................... 4GC/<strong>MS</strong> with the 450-GC .......................................... 5Vibration .................................................................. 7Temperature ............................................................ 7Humidity ................................................................... 7Ventilation System .................................................. 8Power Requirements .............................................. 8Installation Site Power ............................................ 9Gas Requirements ................................................ 11Chemical <strong>Ion</strong>ization Reagent Gases ..................... 11GC Carrier Gases ................................................. 12When the GC/<strong>MS</strong> Arrives ........................................... 13Inspecting the Shipping Cartons ........................... 13Unpacking and Installing ....................................... 14Spare Parts ................................................................ 14<strong>Pre</strong>ventive Maintenance ............................................. 14IntroductionThe <strong>Pre</strong>-installation Instructions guide you through each requirement of the checklist. Followthese instructions to ensure that the installation requires no m<strong>or</strong>e than the usual three days.Have the completed checklist available when you call to schedule the installation. After theVarian Representative has completed the installation, you can analyze your samples.After meeting all of these requirements, contact the Customer Service office in yourregion to schedule the installation.This document includes pre-installation instructions f<strong>or</strong> the 431-GC and the 450-GC.The GC/<strong>MS</strong> operates reliably under carefully controlled environmental conditions. You mustprovide suitable power sources, operating environment, and materials. Using <strong>or</strong> maintaining asystem outside of the power and operating environment ranges and limits described in theseinstructions, may cause failures. The Warranty and Service contract specifically excludes therepair of failures due to such causes.CAUTIONAll phases of the installation site preparation must conf<strong>or</strong>m tolocal safety, electrical, and building codes. These codes takeprecedence over any recommendations in these instructions,and the customer is responsible f<strong>or</strong> compliance.SafetySafety is the most imp<strong>or</strong>tant consideration. Determine if the installation site complies with allrelevant safety regulations.Check the checklist box: Principal installation site is in compliance with allrelevant safety regulations.395414200:5 2 of 14 <strong>Pre</strong>-installation Instructions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!