13.07.2015 Views

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Unit Operation InstructionDDOP <strong>Probe</strong>NOTE warnings in section 2.48.3.1 PREPARE PROBE FOR MAINTENANCEIssue:Procedure:Stop system/Test mode For system control, see system manualShut off the air supply Close valve V2.3 on the PCPBlow downOpen V2.2 and blow down the air receiverCarry out maintenance As described belowClose drain Close valve V2.2Open air supplyOpen valve V2.3 on the PCPTest mode off / StartFor system control, see system manualsystem on8.3.2 MAINTENANCE FILTER OF PROBEClean filter monthly or when required.NOTE: The probe is very hot when it comes out of the process, take care.Follow the below:Issue:Dismount the sample line formprobeDismount filter from probeClean filterReassemble the probeProcedure:Undo the nut on Swagelok fittingUndo the boltsPull out the filter tubeUse compressed air in the Swagelok fittingUse compressed air on the outside of the filterPut filter back in probe and tighten the bolt. Remember supportfor heated hoseReconnect heated hose to Swagelok fitting8.4 MAINTENANCE PROGRAM FOR THE PROBERefer to section 8.3, to get instructions how to do the maintenance in the following table.Date /Initials Maintenance program D W M YHose connections:XMake visually leak check of flexible hosesClean filter element½Check Cleaning valves and perform service ifrequired (Leak test to be performed)3Drawing no: 53895-DDOP-450-20 Page 12 of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!