13.07.2015 Views

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

Double-Dry-nOn-cooled-Probe - Webshop, Gas Analysis Technology

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Unit Operation InstructionDDOP <strong>Probe</strong>7 PROBE CLEANING BOXDepending of the system configuration the DDOP probe is supplied with a <strong>Probe</strong> Cleaningbox (See system datasheet).The <strong>Probe</strong> Cleaning Box comprises of cleaning valves and terminals for probe filter cleaning.For each probe filter is a valve that connects by the flexible steel bread hoses to the probefilter tubes. The valves is controlled by the system controller7.1 INSTALLATION7.1.1 LOCATION OF GMUInstall the <strong>Probe</strong> Cleaning Box as close as possible to the probe. Make sure that probe canbe removed from process without disconnection of flexible hoses7.1.2 AIR SUPPLYThe <strong>Probe</strong> Cleaning Box is to be connected to the main air supply by a buffer air tank. Thetank should provide pressure control and air punch to ensure sufficient filter cleaning. TheFLS Utillity Air option is recommended.Connection from eg. Utillity Air to <strong>Probe</strong> Cleaning Box should be done in standard piping'sby the customer.Connect the air supply according to the installation drawings.7.1.3 CABLING BETWEEN GAS MONITORING UNIT AND OTHER EQUIPMENTCables must be connected according to section “Cable list” in this manual.8 MAINTENANCE8.1 GENERALThe analysis system must be maintained and checked daily, the following sections containsmaintenance sheets for each unitTo ensure optimal drift and highest possible run time, the equipment should be serviced byan authorised service engineer. The service interval can vary from 1-4 times pr. year.Please contact us at the email address or telephone mentioned below for:· Proposal for a specific service agreement for the present equipment, 24h or normalcontract· Preventive maintenance according to technical documentation· Technical support· Immediate service at breakdown8.2 SPARE PARTSWear parts and recommended spare parts are listed in a section of the parts list. To ensurethat the correct part is delivered when ordering spare parts, please provide FLSmidth Airloqwith the project number which is found on the “System Data Sheet” and the FLSmidth PartNo. (6 digit) or Parts Id / Int. No.8.3 MAINTENANCE PROBEDuring the first few weeks of operation it is important to check the system every day, inorder to get to know the system and the applications in which it is installed and perhaps doadjustments if any.Always keep equipment clean outside and inside. Do not use compressed air to cleancabinets inside.Drawing no: 53895-DDOP-450-20 Page 11 of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!