13.07.2015 Views

Data format for Gas based Captive Power Plant - Central Electrical ...

Data format for Gas based Captive Power Plant - Central Electrical ...

Data format for Gas based Captive Power Plant - Central Electrical ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hkkjr ljdkjGOVERNMENTOF INDIAfo|qr eU=ky;MINISTRY OF POWER ( vkbZ-,l-vks-: 9001-2000)dsUnzh; fo|qr izkf/kdj.kCENTRAL ELECTRICITY AUTHORITYlsok Hkou] jked``".kiqjeSEWA BHAWAN, R.K. PURAMubZ fnYyh&110066NEW DELHI-110066No.CEA/PLG/DMLF/541/2009 Dated 07.12.2009<strong>Power</strong> Secretaries of A.P.,Maharashtra,Gujarat,Rajasthan, U.P., Haryana & DelhiSubject: <strong>Gas</strong> <strong>based</strong> <strong>Captive</strong> <strong>Power</strong> <strong>Plant</strong>Sir,GOI has decided to allocate 10mm CSMD of <strong>Gas</strong> from from KG – D6 to <strong>Captive</strong> <strong>Power</strong> <strong>Plant</strong>s on fall backbasis. Recommendation <strong>for</strong> allocation of <strong>Gas</strong> to <strong>Captive</strong> <strong>Power</strong> <strong>Plant</strong>s are to be given by CEA/MoP to MoP & NG.CEA had vide letter dated 3 rd November, 2009 advised the Regional <strong>Power</strong> Survey Offices(RPSOs) of CEA tocollect the required in<strong><strong>for</strong>mat</strong>ion. In<strong><strong>for</strong>mat</strong>ion from only a few industries has been received. It is requested thatin<strong><strong>for</strong>mat</strong>ion <strong>for</strong> gas <strong>based</strong> power plants having installed capacity 1 MW & above (as per enclosed pro<strong>for</strong>ma) inrespect of existing captive power plants which are already existing as well as awaiting commissioning may be sent toCEA. This in<strong><strong>for</strong>mat</strong>ion is urgently required in connection with compilation and <strong>for</strong>mulation of our recommendationsto Ministry of <strong>Power</strong>/Ministry of Petroleum and Natural <strong>Gas</strong>. You are requested to kindly advise the concernedorganisations/authorities of your State to furnish the details in the <strong><strong>for</strong>mat</strong> urgently to CEA by 9 th December, 2009.Encls: As AboveYours faithfully(Major Singh)Chief Engineer(DMLF)Tel.No.26105546E-mail cedmlfcea@indiatimes.comCopy to: Chief <strong>Electrical</strong> Inspectors of A.P.,Maharashtra,Gujarat,Rajasthan, U.P., Haryana & DelhiCopy along with enclosures to : Deputy Director, RPSO(N),RPSO(W), RPSO(S) & RPSO(E) to follow upwith the respective State Govt. <strong>for</strong> furnishing the in<strong><strong>for</strong>mat</strong>ion on priority basis.(Chief Engineer)DMLF


DATA FORMAT FOR CAPTIVE POWER PLANT1. Name of Project Address with Contact person/ContactNos/Fax No.2. Capacity of <strong>Gas</strong> <strong>based</strong> <strong>Plant</strong> (MW) Type of <strong>Plant</strong>s(OCGT/CCGT/<strong>Gas</strong> fired boiler withsteam furnace/gas engine/co-generation plant)3. <strong>Power</strong> Generation during last 3 years with break up of export togrid/details of PPA2007-08 2008-09 2009-10Details of PPAGeneration(MU)Export(MU)Generation(MU)Export(MU)Generation(MU)Export(MU)4. Source of <strong>Gas</strong> Supply/Allocation along with Quantity(MMSCMD)5. Actual Fuel used during last 3 years<strong>Gas</strong> – APMPMGi) LNG (LongTerm/Spotpurchase)ii) Other fuel –NAPTHAHSDF.O.2007-08 2008-09 2009-10Quantityconsumed inmmscmd/tones<strong>Gas</strong> – APMPMGi) LNG (LongTerm/Spotpurchase)ii) Other fuel –NAPTHAHSDF.O..Quantityconsumed inmmscmd/tones<strong>Gas</strong> – APMPMGi) LNG (Long Term/Spotpurchase)ii) Other fuel –NAPTHAHSDF.O.Quantityconsumed inmmscmd/tones6. Requirement of gas7. Any other remarks (if any)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!