02.12.2012 Views

Agenda Package - City of Vernon

Agenda Package - City of Vernon

Agenda Package - City of Vernon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

THE CORPORATION OF THE CITY OF VERNON<br />

2008 Annual Report<br />

OPERATIONS<br />

Mission Statement: To provide quolity municipol seruices in o cost effective ond efficient monner that<br />

satisfies the needs <strong>of</strong> the people <strong>of</strong> <strong>Vernon</strong>.<br />

The Operations Division is the<br />

Operation Services Manager.<br />

Sections:<br />

o Public Works and<br />

Parks<br />

o Water Operations<br />

Public Works and Parks<br />

largest Division within the C¡ty <strong>of</strong> <strong>Vernon</strong> and is managed by the<br />

ln 2008, the Operations Division was comprised <strong>of</strong> the following<br />

o Utilities Operations<br />

¡ Fleet and Facilities<br />

¡ Water Reclamation<br />

and Spray lrrigation<br />

o Airport<br />

This Section ls managed by the Manager <strong>of</strong> Public Works and Parks and employs 31 permanent staff<br />

and 10 seasonalstaff. The Section is responsible forthe operation and maintenance <strong>of</strong> the cemetery,<br />

roads, traffic lights, street lights, sidewalks and boulevards within the <strong>City</strong> <strong>of</strong> <strong>Vernon</strong>, including snow<br />

and ice removal, landscaping and weed control. The Section is also responsible for the construction <strong>of</strong><br />

the '¡n-house' capital works road projects.<br />

The Parks sub-section contracts a port¡on <strong>of</strong> the services for the operation and maintenance <strong>of</strong> all<br />

parks within the Greater <strong>Vernon</strong> area.<br />

The operations <strong>of</strong> the <strong>Vernon</strong> Regional Airport was restructured and included in this Section under the<br />

direction <strong>of</strong> the Manager, Public Works.<br />

Water Utilities<br />

This Section is under the direction <strong>of</strong> the Manager <strong>of</strong> Water and is comprised <strong>of</strong> 22 permanent staff.<br />

This Section is under contract with Greater <strong>Vernon</strong> Water (GVW) and is responsible for the operation<br />

and maintenance <strong>of</strong> the supply, distribution, storage and treatment <strong>of</strong> the Kalamalka and Duteau<br />

water systems within the <strong>City</strong> <strong>of</strong> <strong>Vernon</strong> and Areas B and C (excluding Coldstream).<br />

Water Reclamation and Spray lrrigation<br />

This Section is under the direction <strong>of</strong> the Manager, Water Reclamation and is comprised <strong>of</strong> 9<br />

permanent staff and 2 seasonal employees. This section is responsible for the operation <strong>of</strong> the<br />

<strong>Vernon</strong> Water Reclamation Centre (VWRC) including the High Lift and Booster Pump Stations. The<br />

VWRC was upgraded in 2004 and now produces 'lake quality' reclaimed water that is pumped to the<br />

MacKay Reservoir and the reservoir at the Rise for distribution through spray irrigation. During 2008,<br />

the management <strong>of</strong> the spray irrigation program was added to the Water Reclamation Manager's<br />

pr<strong>of</strong>ile.<br />

Fleet and Facilities<br />

This Section is under the direction <strong>of</strong> the Fleet and Facilities Manager and employs 9 permanent staff,<br />

1 part time and 1 seasonal staff as well as supplementing labourers when required. The Facilities sub-<br />

lSlPage<br />

32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!