02.12.2012 Views

Agenda Package - City of Vernon

Agenda Package - City of Vernon

Agenda Package - City of Vernon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THE CORPORAT]ON OF THE CITY OF VERNON<br />

2008 Annual Report<br />

ENGINEERING<br />

Engineering Services is responsible for the implementat¡on <strong>of</strong> the municipal services and bylaws related<br />

to infrastructure planning. We work very closely with many <strong>of</strong> the other departments to provide this<br />

service.<br />

The mandate <strong>of</strong> the Engineering Division is to hold paramount the safety, welfare and quality <strong>of</strong> life <strong>of</strong><br />

the public and the protection <strong>of</strong> the environment through fiscally responsible management <strong>of</strong> public<br />

infrastructure.<br />

ln 2008 the Planning, Development and Engineering Services Division (PDES)was restructured to create<br />

a Planning and Building Division and an Engineering Division. This restructuring has eliminated the PDES<br />

Manager and placed the Planning and Engineering Managers at the Senior Manager table thereby<br />

permitting better representation from the two small but ¡mportant Divisions.<br />

The Capital year saw the following significant improvements to our roads and util¡t¡es which were<br />

managed by the Engineering department:<br />

o 25 Avenue, 41 Street to 43 Street<br />

. 32 Avenue, 27 Street to Pleasant Valley Road<br />

o 39 Avenue,27 Streetto PleasantValley Road<br />

¡ Tronson Road Phase I<br />

o Ellison Parkway Path<br />

Furthermore the Operations and Engineering Divisions worked together to construct a green lane pilot<br />

project adjacent to Silver Star School. This project utilized a porous pavement design constructed <strong>of</strong> a<br />

stabilizing geotextile system and structural gravel. The main benefit <strong>of</strong> this system over standard paving<br />

or chip sealing is it does not require a stormwater system.<br />

16 lPage<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!