Agenda Package - City of Vernon
Agenda Package - City of Vernon
Agenda Package - City of Vernon
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CAO & CFO ACTION ]TEMS<br />
[urtle Mountain 7l1l2OOB ot oriot<br />
ls this a<br />
Íollow up<br />
ouêslion?<br />
Tom Fletchers costs recovered? Partiallv oaid remaining costs have been billed out No I<br />
^/ere<br />
All Fast track and recoverable billinqs have been issued No<br />
Iurtle Mounlain Aug-0t 1 qre there other outstanding agreements? Summarv attached. billino ¡n Droqress - (Prev c¡rculatodl No<br />
Predator Ridqe 71112008 o¡ orio¡ Should we have been outtinq moneY aside for a new F¡re Hall? )etailed review <strong>of</strong> documents completed.<br />
Predalor was to annuallv contribute money to the <strong>City</strong><br />
No<br />
lor this ouroose. Referred to Leqal Counsel.<br />
No<br />
Leoal Counsel have determined that we do not have an<br />
avecutable ãoreement.<br />
No<br />
iewer Lew<br />
iewer Lew<br />
Auq-08<br />
Aug-08<br />
Do an analvsis <strong>of</strong> the lew.<br />
Whv was the lew charqed out beyond the<br />
oriqinal olan for collection?<br />
ln Drooress<br />
A detailed review <strong>of</strong> the sDecified area lew was conducted.<br />
The review looked at the terms <strong>of</strong> the bylaw at the inception <strong>of</strong><br />
he soecified area and the oavment historv. The review was<br />
:irculated to Council, and the Finance Committee. No levy will be<br />
:ollected for 2009, or future vears, as the original terms <strong>of</strong> the<br />
;oecified area have now expired.<br />
No<br />
No<br />
2008 Budget<br />
2008 Budget<br />
Auq-0<br />
Auqtercentaqe<br />
<strong>of</strong> taxes for capital<br />
Need a new conceptional model to ensure that planned levels<br />
rf ernendilure are nol eroded bv hirino <strong>of</strong> administrative staff. rq model chanqes will be implemented for 2009<br />
ncremental chanoes for 2009 imDlemented more to follow in 2010.<br />
No<br />
H<br />
6t2t2009<br />
page 1 <strong>of</strong> 1 G:\Finance\Finance Committee\Council\Outstanding issues - Barry 2008 2009 update<br />
o/s<br />
Follow<br />
lto