13.07.2015 Views

Navy Working Capital Fund - DON FM&C Website

Navy Working Capital Fund - DON FM&C Website

Navy Working Capital Fund - DON FM&C Website

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DEPARTMENT OF THE NAVYNAVY WORKING CAPITAL FUNDBASE SUPPORT - NAVAL FACILITIES ENGINEERING SERVICE CENTER (NFESC)FISCAL YEAR (FY) 2012 BUDGET ESTIMATESFEBRUARY 2011Stabilized/Composite Rate FY 2010 FY 2011 FY 2012Stabilized Rate ($) $97.88 $100.03 $ 97.85Change from Prior Year +2.7% +2.2% -2.2%Composite Rate Change +1.9% +1.8% -0.3%Staffing:Civilian/Military ES & Work Years FY 2010 FY 2011 FY 2012Civilian End Strength 410 404 404Civilian Work Years 403 399 399Military End Strength 3 3 3Military Work Years 3 3 3Civilian Personnel:End strength and work years remain stable and are based upon workload requirements.Military Personnel:Military end strength and work years remain level.<strong>Capital</strong> Investment Program (CIP) Budget Authority: NFESC had an emergent CIP requirementin FY10 to replace a 20/10 Ton Overhead Bridge Crane used to load/unload the pressure vesselsat the Deep Ocean Simulation Facility. NFESC had been notified by the <strong>Navy</strong> Crane Center thatdue to the age of the crane (+40 years) and the non availability of repair parts (manufacturerclosed 30 years ago) that the crane would not be re-certified. The crane has been contracted andwill be delivered in February 2011.<strong>Capital</strong> Investment Program ($M) FY 2010 FY 2011 FY 2012Equipment, Non-ADP / Telecom $ 0.5 $ 0.0 $ 0.0Equipment ADPE / Telecom $ 0.0 $ 0.0 $ 0.0Software Development $ 0.0 $ 0.0 $ 0.0Minor Construction $ 0.0 $ 0.0 $ 0.0Total $ 0.5 $ 0.0 $ 0.0Exhibit Narrative

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!