A useful Power Point by Paul Truong
A useful Power Point by Paul Truong A useful Power Point by Paul Truong
13.07.2015
Views
Disaster Mitigation Project with Kellog Brown & Rootsat Quang Ngai, Vietnam
- Page 3 and 4: TOPICS OF TODAY PRESENTATION1- Intr
- Page 5 and 6: Erect stems upto 2m tall andover 2.
- Page 8 and 9: Introducing Vetiver grassUNIQUE MOR
- Page 10 and 11: Infrastructure Protection• Resear
- Page 12 and 13: Shear test of vetiver roots
- Page 14 and 15: Strong root reinforcement holding u
- Page 16 and 17: Infrastructure ProtectionSome examp
- Page 18 and 19: After 400mm of rain in 10 days
- Page 20 and 21: Lakeland - Laura Road(At Split Rock
- Page 22: This concrete shute will collapse d
- Page 25 and 26: Hydromulching seven months after pl
- Page 27 and 28: Batter protected by vetiver contour
- Page 29 and 30: Cooktown-Lakeland RoadStabilisation
- Page 31 and 32: Eight months after planting
- Page 33 and 34: Road Batter ProtectionC ost Summari
- Page 35 and 36: Blackwater-Emerald Railway Line Unp
- Page 37 and 38: Murphy Creek - Toowoomba Railway li
- Page 39 and 40: OVERSEASEl Salvadore
- Page 41 and 42: Infrastructure ProtectionSome examp
- Page 43 and 44: Six weeks after planting
- Page 45 and 46: Guangdong, China
- Page 47 and 48: Infrastructure ProtectionSome examp
- Page 49 and 50: Condamine Highway between Miles and
- Page 52 and 53: One month after planting
- Page 57 and 58: 300 cumecs100cumecsVetiver rowsFloo
- Page 59 and 60: Middle section, note that vetiver h
- Page 61 and 62: Submerged VetiverhedgesDrainage cha
- Page 63 and 64: Strong flow exposed part of the cro
- Page 65: Two years after planting, trimming
Disaster Mitigation Project with Kellog Brown & Rootsat Quang Ngai, Vietnam