Nabalco Alumina Refinery, Gove, Northern Territorywall repaired after cyclone damageDam
Six weeks after planting
- Page 1 and 2: VETIVER GRASS SYSTEMFOR INFRASTUCTU
- Page 3 and 4: TOPICS OF TODAY PRESENTATION1- Intr
- Page 5 and 6: Erect stems upto 2m tall andover 2.
- Page 8 and 9: Introducing Vetiver grassUNIQUE MOR
- Page 10 and 11: Infrastructure Protection• Resear
- Page 12 and 13: Shear test of vetiver roots
- Page 14 and 15: Strong root reinforcement holding u
- Page 16 and 17: Infrastructure ProtectionSome examp
- Page 18 and 19: After 400mm of rain in 10 days
- Page 20 and 21: Lakeland - Laura Road(At Split Rock
- Page 22: This concrete shute will collapse d
- Page 25 and 26: Hydromulching seven months after pl
- Page 27 and 28: Batter protected by vetiver contour
- Page 29 and 30: Cooktown-Lakeland RoadStabilisation
- Page 31 and 32: Eight months after planting
- Page 33 and 34: Road Batter ProtectionC ost Summari
- Page 35 and 36: Blackwater-Emerald Railway Line Unp
- Page 37 and 38: Murphy Creek - Toowoomba Railway li
- Page 39 and 40: OVERSEASEl Salvadore
- Page 41: Infrastructure ProtectionSome examp
- Page 45 and 46: Guangdong, China
- Page 47 and 48: Infrastructure ProtectionSome examp
- Page 49 and 50: Condamine Highway between Miles and
- Page 52 and 53: One month after planting
- Page 54: Disaster Mitigation Project with Ke
- Page 58 and 59: Water enters the site from the top
- Page 60 and 61: Very fast flow flattened and inunda
- Page 62 and 63: Although only 3 month old, the youn
- Page 64 and 65: Lake Evergreen, Guangdong, China:Hi
Nabalco Alumina Refinery, Gove, Northern Territorywall repaired after cyclone damageDam