VETIVER GRASS SYSTEMFOR INFRASTUCTUREDr. <strong>Paul</strong> <strong>Truong</strong>Veticon Consultingwww.uqconnect.net/veticonAll materials in this document remain the property of Veticon Consulting PtyLtd. Permission must be obtained for their use. Copyright © 2010


INTRODUCTION• The Vetiver System (VS) is based on the use of vetiver grass (Vetiveriaizizanioides L.) for a wide range of applications.• VS was first developed <strong>by</strong> the World Bank for soil and waterconservation and now being used in over 100 countries. In QueenslandVS was developed <strong>by</strong> the Department of Natural Resources for soilerosion and sediment control, land stabilisation and effluent disposal.• Vetiver grass is a native of the Indian sub-continent which wasintroduced to Queensland from Fiji since early in the 1900s. A sterilecultivar was selected and registered to the DPI as Monto vetiver inQueensland. Monto vetiver is sterile, non invasive, it flowers but set noseeds hence no weed potential.• R&D conducted <strong>by</strong> DPI and DNR showed that Monto vetiver is tolerantto the most adverse conditions, high levels of pesticides and herbicidesand also to a wide range of heavy metal toxicities. Therefore VS hasbeen successfully used for environmental protection purposes inAustralia, Asia, Africa and Europe.


TOPICS OF TODAY PRESENTATION1- Introducing Vetiver Grass• Its extraordinary attributes2- Infrastructure Protection• Road and Highway batters• Dam walls• River and stream bank erosion control


Introducing Vetiver grassUNIQUE MORPHOLOGICALCHARACTERISTICS OFMONTO VETIVERSiff Stiff and erect shoot growth


Erect stems upto 2m tall andover 2.5m withflower head


Forming a thick hedge when planted in row


Introducing Vetiver grassUNIQUE MORPHOLOGICALCHARACTERISTICS OFMONTO VETIVERMassive, deep and penetratingroot system


China: One year old with 3.3m deep rootsystem(These roots have a tensile strength equivalent to1/6 mild steel reinforcement)Australia: One yearold, 1.3m and rootbound


Infrastructure Protection• Research on tensile and shear strength of the rootgsystem• Road and Highway batters• Dam walls• River and stream bank erosion control


Soil stabilisation mechanism <strong>by</strong> vetiverVetiverhedgerowsVti Vetiverrootsslipping zone on slopesusually 0~2 m depthsDiti Hengchaovanich


Shear test of vetiver roots


(These roots have a tensile strengthequivalent to 1/6 mild steelreinforcement)


Strong root reinforcement holding up this wall of soil againstwater erosion


RootsExtensive rootdistribution atdepth of this amwall


Infrastructure ProtectionSome examples of works in Qld and Overseas• Road and Highway batters


Teemburra Dam Access Road Mackay Trial conducted <strong>by</strong> the DeptEnvironment and Heritage


After 400mm of rain in 10 days


One and half year after planting


Lakeland – Laura Road(At Split Rock )Batter Stabilisation


CAPE YORKPENINSULARLakeland – Laura Road(At Split Rock )Severe erosion onunprotected cut slope


This concrete shute will collapse due to severe erosionand undermining.


Completely stabilised seven months after planting


Hydromulching seven months after planting


Cooktown-Lakeland RoadStabilisation of road batters


Batter protected <strong>by</strong> vetiver contour planting at between 0.5 and 1.0mVertical Interval, Three weeks after planting


Eight months after planting


Cooktown-Lakeland RoadStabilisation of steep batters aboveculvert inlets and outlets


Steep batter protected <strong>by</strong> vetiver hedges


Eight months after planting


COSTS SUMMARYandCONCLUSIONNevil Bracken, Project Engineer,Pavement Construction Management Pty. Ltd


Road Batter ProtectionC ost SummariesAUD Per linearmetreAUD Per squaremetre of batterfaceVetiver hedges on CutBattersVetiver hedges on FillBatters18.40 21.4015.50 18.20Culvert ProtectionVetiver hedges 18.20Grouted rock pitching 65.75Saving 73%Road Shoulder ProtectionVetiver hedges 15.50T raditional concrete sh oulderdykes 38.00Saving 60%Table Drain Scour ProtectionVetiver contour hedges 15.50Traditional hard rock check dams 42.00Saving 64%Miscellaneous Protection W orkVetiver hedges generally 15.50Steel wire rock mattress 43.00Saving 64%


Other projects in Queensland- Blackwater-Emerald Railway Line- Murphy Creek – Toowoomba Railway line


Blackwater-Emerald Railway Line Unprotected batter


Two years after planting


Murphy Creek – Toowoomba Railway linePlanting on a steep batter


Once the batter fully stabilised after 6 years, native plantreturned to provide more permanent protectionVetiver row after slashing


OVERSEASEl Salvadore


A very high and steep road batter


Infrastructure ProtectionSome examples of works in Qld and Overseas• Dam walls


Nabalco Alumina Refinery, Gove, Northern Territorywall repaired after cyclone damageDam


Six weeks after planting


Two and half years after planting and unaffected <strong>by</strong> the wet season


Guangdong, China


South Africa


Infrastructure ProtectionSome examples of works in Qld and Overseas• River and stream bank erosion control


Principles of the Vetiver System for RiverBank StabilisationIn flood erosion control and riverbank stabilisation the VSuses the deep and high tensile root system to reinforce thebank slopes and its dense and stiff stems to spread andreduce flow velocity.• To stabilise the bank steep gradients, horizontal rows planted onapproximate contour lines• To reduce flow velocity of the strong current therefore preventingscouring from the strong flow, planting of cross rows is needed.• For maximum effect, the cross rows are orientated at right angleto the flow direction.• The spacing of both horizontal and cross rows varies with slopegradient and length, soil type, flow velocity and depth.


Condamine Highway between Miles and Goondiwindi


Severe erosion on the abutment of the Coolumboola Creek bridgenear Miles.


One month after planting


18 months after planting, note the bare area between rows, due tothe dry weather


Disaster Mitigation Project with Kellog Brown & Rootsat Quang Ngai, Vietnam


300 cumecs100cumecsVetiver rowsFlood erosioncontrol in drainagechannel at LaidleyVetiver hedges wereestablished to spreadwater out and also todivert water to the drainDrainage Channel


Water enters the site from the top and sideFlow


Middle section, note that vetiver hedges bent under strong current


Very fast flow flattened and inundated most of the hedges.The velocity was estimated up to 5m/sec in some areas


Submerged VetiverhedgesDrainage channel


Although only 3 month old, the young hedges provide a very effectiveprotection with only minimal erosion at the head of the channelSmall erosion


Strong flow exposed part of the crowns but failed todislodge the plants


Lake Evergreen, Guangdong, China:Highly erodible and badly eroded <strong>by</strong> wave during the wet season.


Two years after planting, trimming during the dry seasonWater line

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!