13.07.2015 Views

GA Memo 2- Capital - Elizabeth City State University

GA Memo 2- Capital - Elizabeth City State University

GA Memo 2- Capital - Elizabeth City State University

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment 2THE UNIVERSITY OF NORTH CAROLINA2011-17 Six Year Repairs and Renovations PlanFayetteville <strong>State</strong> <strong>University</strong> 29,611,500Roof repairs and replacements 2,480,000Structural repairs 531,000Repairs to electrical, plumbing and heating, ventilating, and air-conditioning systems 4,040,000Improvements to meet the requirements of the Americans with Disabilities Act 2,200,000Improvements to meet fire safety needs 1,706,000Improvements to existing facilities for energy efficiency 1,550,000Improvements to remove asbestos, lead paint, and other contaminants, including the removal and replacement of575,000underground storage tanksImprovements and renovations to improve use of existing space 11,408,000Improvements to roads, walks, drives, utilities infrastructure 2,211,500Drainage and landscape improvements 2,910,000North Carolina A&T <strong>State</strong> <strong>University</strong> 90,469,599Roof repairs and replacements 5,516,500Structural repairs 14,250,900Repairs to electrical, plumbing and heating, ventilation, and air-conditioning systems 22,777,700Improvements to meet the requirements of the Americans with Disabilities Act 2,953,900Improvements to meet fire safety needs 3,733,000Improvements to existing facilities for energy efficiency 19,754,500Improvements to remove asbestos, lead paint, and other contaminants, including the removal and replacement of837,999underground storage tanksImprovements and renovations to improve use of existing space 10,626,900Historical restoration 3,005,400Improvements to roads, walks, drives, utilities, infrastructure t 4,741,200Drainage and landscape improvements 2,271,600North Carolina Central <strong>University</strong> 69,080,500Roof repairs and replacements 830,000Structural repairs 2,322,500Repairs to electrical, plumbing and heating, ventilation, and air-conditioning systems 5,715,000Improvements to meet the requirements of the Americans with Disabilities Act 1,376,000Improvements to meet fire safety needs 131,000Improvements to existing facilities for energy efficiency 2,677,000Improvements to remove asbestos, lead paint, and other contaminants, including the removal and replacement of300,000underground storage tanksImprovements and renovations to improve use of existing space 52,690,500Improvements to roads, walks, drives, utilities infrastructure 2,259,000Drainage and landscape improvements 779,500Attachment 2 - Page 2 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!