13.07.2015 Views

GA Memo 2- Capital - Elizabeth City State University

GA Memo 2- Capital - Elizabeth City State University

GA Memo 2- Capital - Elizabeth City State University

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THE UNIVERSITY OF NORTH CAROLINA2012-13 <strong>Capital</strong> PrioritiesTHE UNIVERSITY OF NORTH CAROLINA SCHOOL OF THE ARTSFilm School Center of Excellence, Phase 2 – Post Production/Graduate Facility and Renovations –$3,725,756 – PlanningThis project would construct a new Post Production Graduate Facility of approximately 51,000 square feet andrenovate the Administration, Buck and Alex C. Ewing (ACE) Exhibition facilities. The project also includes filmproduction equipment and upgraded IT networking, construction of utilities infrastructure including a regionalchilled water plant, high voltage loop, storm water management systems and security systems. The project willalso include an exterior courtyard, parking, and acquisition of land and buildings adjacent to existing Film Schoolfacilities in order to provide an adequate site for construction. The total cost of this project is $37,257,560.WESTERN CAROLINA UNIVERSITYNew Education and Allied Professions Building – $5,523,900 – PlanningThis 163,000 square-foot facility would provide needed space for the College of Education and AlliedProfessions and address safety, energy, current code, and ADA issues. The existing facility lacks sufficientspace to handle projected enrollment growth and cannot be efficiently reconfigured to provide modern educationand training space. WCU will seek LEED Silver certification or higher for this building. Planning funds totaling$4,018,700 were appropriated by the 2008 General Assembly but were later reverted. The total cost of thisproject is $55,239,000.WINSTON-SALEM STATE UNIVERSITYSciences Building – $3,000,000 – PlanningWSSU’s overall enrollment growth has exceeded 15% in each of the past five years, and student demand isparticularly increasing in the Life Sciences and Health Sciences. This approximate 120,000 square-foot buildingwould contain science labs, classrooms and support functions, forensic labs with associated support spaces,animal facilities and faculty offices. The 2007 General Assembly appropriated $3,312,000 for this purpose. The2008 General Assembly provided an additional $3,000,000 but these funds were later reverted. The total cost ofthis project is $60,000,000.Page 23 of 23Approved by the Board of Governors on March 6, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!