13.07.2015 Views

Summary of Evidence Mary O'Callahan

Summary of Evidence Mary O'Callahan

Summary of Evidence Mary O'Callahan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Mary</strong> O’Callahan- <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>Planning<strong>Summary</strong> <strong>of</strong> evidence <strong>of</strong> Dean Olsen onbehalf <strong>of</strong> Meridian Energy Limited.Christchurch Southern Motorway – Stage 2Board <strong>of</strong> Inquiry Hearing


<strong>Mary</strong> O’Callahan- <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningBackground• My evidence outlines:• Matters before the Board;• Statutory Context;• Assessment <strong>of</strong> Environmental Effects;• Statutory Assessment;• Comments on submissions and evidence;and• Proposed Conditions.Christchurch Southern Motorway –– Stage Stage 22Board Board <strong>of</strong> <strong>of</strong> Inquiry Inquiry Hearing Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningMatters before the Board• 3 NoRs:- alteration to designations in the Selwyn District Plan (Designations TR1 and TR4);- new designation in the Selwyn District Plan;- new designation in the Christchurch City Plan;• 15 resource consent applications:Regional- 6 land use consents (earthworks, deposition, use and storage <strong>of</strong> hazardous substances, earthworksin riparian margin, disturbance <strong>of</strong> streambed & construction and use <strong>of</strong> bores)- 2 water permits (diversion <strong>of</strong> stockwater races & groundwater takes)- 5 discharge permits (stormwater discharge to land and water, dewatering discharge to land andwater & discharge <strong>of</strong> dust to air)District- 2 land use consents under NES for Contaminants in SoilChristchurch Southern Motorway –– Stage Stage 22Board Board <strong>of</strong> <strong>of</strong> Inquiry Inquiry Hearing Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningStatutory Context• Proposal <strong>of</strong> National Significance under Section 142(3) RMA• NoR’s determined under section 171• NES (district) resource consents determined under section 104A• Regional consents can be bundled and determined under section 104D – both tests met• Additional assessment matters for discharge consents under section 105 RMA• Outline Plan details incorporated intoNoRs in accordance with s176A(2)(b)• Applicable zonings:• Selwyn District: Inner Plains (Rural)• Christchurch City: Business, Rural,Living and special purposeChristchurch Southern Motorway – Stage 2Board <strong>of</strong> Inquiry Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningSuite <strong>of</strong> planning documents• National Policy Statements;• National Environmental Standards;• Canterbury Regional Policy Statement;• Recovery Strategy for Greater Christchurch;• Natural Resources Regional Plan;• Proposed Land and Water Regional Plan;• Selwyn District Plan;• Christchurch City Plan;• Draft Land Use Recovery Plan (othermatter - s171(1)(d) and s104(1)(c))Christchurch Southern Motorway – Stage 2Board <strong>of</strong> Inquiry Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningAssessment <strong>of</strong> environmental effects• Positive Effects:• Significant positive transport effects (local, regional and national scale)• Enhancement <strong>of</strong> ecological value and connectivity• Enhancement <strong>of</strong> active transport• Economic growth• Adverse Effects:• Local construction effects (dust, noise, traffic)• Local effects on landowners (noise, visual, removal <strong>of</strong> access)• Local business effects• Minor effects on surface and ground water quality and quantity• Methods to avoid, remedy and mitigate effects include:• Designation conditions;• Consent conditions; and• Management plansChristchurch Southern Motorway – Stage 2Board <strong>of</strong> Inquiry Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>PlanningManagement Plan FrameworkChristchurch Southern Motorway –– Stage Stage 22Board Board <strong>of</strong> <strong>of</strong> Inquiry Inquiry Hearing Hearing


<strong>Mary</strong> O’Callahan - <strong>Summary</strong> <strong>of</strong> <strong>Evidence</strong>Planning<strong>Summary</strong>• Potential adverse effects for some adjacent residents ranging from minor to significant• Significant positive effects (locally, regionally and nationally)• Central to effects management is a suite <strong>of</strong> management plans. These, together with theproposed conditions, will ensure that effects on the environment <strong>of</strong> both the constructionand operation <strong>of</strong> the Project are appropriate• Sustainable management <strong>of</strong> natural and physical resources can be achieved and the Projectis consistent with the purpose and principles <strong>of</strong> the RMAChristchurch Southern Motorway – Stage 2Board <strong>of</strong> Inquiry Hearing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!