S22StormwaterManager - StrategicInfrastructureDescription: Works program preparation, determine method of procurement and ensure program is carried out. Liaise design, projectmanagement, construction, and assetsS22.01Stormwaterand FloodMitigationP545.01Drainage -Works<strong>Plan</strong>ningP545.02 RateFundedFloodworksS545.01.K1S545.01.K2S545.01.K3S545.01.K4Flood program preparation and execution, stormwater maintenance and nuisanceworks, application for grant fundingPrepare and implement Works program - Report on status of Works program 1/07/2011 30/06/<strong>2012</strong>Report on status of implementation of Approved Loan-Funded and 2010 Rate Variation-Funded Floodworks.# of requests relating to drainage likely to cause property damage% of responses to requests relating to drainage likely to cause property damage undertaken within 2 days# of requests relating to flood damage due to poorly maintained drains1/07/2011 30/06/<strong>2012</strong>% of responses to requests relating to flood damage due to poorly maintained drains undertaken within 2 days<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Council</strong> – <strong>2012</strong>/<strong>2013</strong> <strong>Operational</strong> <strong>Plan</strong> 28 June <strong>2012</strong> Page 77
Drainage / Flood Works Program (<strong>2012</strong>/<strong>2013</strong> to 2015/2016)Year Project/Road Comment / DescriptionProjectEstimate($)Urban WorksFunded byStormwaterLevy ($)Non-UrbanWorks Fundedby RateVariation ($)GrantFunding($)<strong>2012</strong>/13 Flood Detention Basin<strong>2012</strong>/13Flood warning system &modellingContribution for Land Purchase(Bakers Road)Early flood warning system / 2Dflood modelling200,000 0 200,000 0541,110 134,074 134,074 272,962<strong>2012</strong>/13 Flood Detention Basin Construction (Spagnolos Road) 3,299,814 $0 3,099,814 200,000<strong>2012</strong>/13 Central Business District CBD Drainage Works 1,905,222 1,312,656 562,567 30,000<strong>2012</strong>/13 Loaders Lane Loaders Lane Levee 150,000 90,000 60,000 0<strong>2012</strong>/13<strong>2012</strong>/13Creek Clearing &Drainage WorksPark Beach TrunkDrainageMaintenance Works 144,999 43,500 101,500 0Provision of additional trunkdrainage - Stage 130,000 7,000 3,000 20,000<strong>2012</strong>/13 Flood Detention Basin Construction (Bennetts Road) 4,859,745 0 2,469,970 2,389,774<strong>2012</strong>/13 Fawcett Street Drainage works adjacent oval 300,000 300,000 0 0<strong>2012</strong>/13 Prince Street Drainage investigation and works 30,000 30,000 0 0<strong>2012</strong>/13 York Street Drainage amplification works 40,000 40,000 0 0<strong>2012</strong>/13 Investigation & Design Drainage Improvements 54,054 54,054 0 0<strong>2012</strong>/13 Marcia Street Improve drainage at Pacific Highway 273,433 136,717 136,717 0<strong>2012</strong>/13 Moore Street Drainage Works 40,000 40,000 0 0<strong>2012</strong>/13 <strong>Coffs</strong> Creek Infilling & Hydraulic Capacity 60,000 9,000 21,000 30,000<strong>2012</strong>/13<strong>2012</strong>/13<strong>2012</strong>/13Avenue Street / ValleyStreetCreek Clearing &Drainage WorksDrainage Works Urban &Non UrbanStormwater pipeline augmentationworks40,000 40,000 0 0Maintenance Works 195,535 58,661 136,875 0Drainage Works Urban & Non Urban 473,274 283,964 189,309 0Totals for <strong>2012</strong>/13 12,637,186 2,579,624 7,114,825 2,942,737<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Council</strong> – <strong>2012</strong>/<strong>2013</strong> <strong>Operational</strong> <strong>Plan</strong> 28 June <strong>2012</strong> Page 78