13.07.2015 Views

9400 Specifications - Zenitel

9400 Specifications - Zenitel

9400 Specifications - Zenitel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART III: EXECUTION3.1 INSTALLATIONA. Shall be installed by qualified technicians who have been factory trained and certified.B. Wiring shall be uniform and in accordance with national electric codes and manufacturersinstructions.C. Equipment shall be firmly secured, plumb, and level.D. All splices shall be in easily accessible junction boxes or on terminal boards.E. All cable runs at the main terminal board and in all junction boxes shall be tagged and identified.F. Coordinate all work with other effected trades and contractors.3.2 SYSTEM INITIALIZING AND PROGRAMMINGA. System shall include all software necessary for system configuration.B. System shall be turned on and adjustments made to meet requirements of specifications and onsiteconditions.C. System shall be programmed to function as specified.D. Directory numbers, feature codes, and special programming shall be documented, printed andmade available to owner.3.3 SYSTEM TEST PROCEDURESA. System shall be completely tested to assure that the exchange and all components, stations,speakers, and accessories are hooked-up and in working order.B. System shall be pre-tested by contractor and certified to function in accordance with plans andspecifications.C. System shall be tested in presence of owner's representative.3.4 OWNER INSTRUCTIONSA. Installation contractor shall conduct up to (4) hours of instruction in use and operation of thesystem to designated owner representatives, within (30) days of system acceptance. Owner willprint and distribute directory number plan to users.B. Installation contractor shall conduct up to (4) hours of technical training, in programming,troubleshooting, and service of the system, to designated owner representatives within (90) daysof system acceptance.C. Manufacturer shall conduct periodic (every 90 days) technical training seminars and make themavailable to those responsible for on-going maintenance of the system.<strong>Zenitel</strong> USA - 6119 Connecticut Avenue – Kansas City, MO 64120 – 816/231-7200 – Fax: 816/231-7203 – www.zenitelusa.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!