13.07.2015 Views

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Estates Reservoir Replacement <strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong>Visual Qualitythat the Project is implemented and maintained as proposed, and that public input isincorporated into the landscape plan, the following measures are listed.Measure 3.2-2:A Landscape Plan for the Estates Reservoir Replacement Project will be preparedduring the Design Phase that will be consistent with the RHAA Concept DesignProcess and Recommendations <strong>Report</strong> 2008 (updated 2009), and ensure that areasdisturbed by construction are re-graded and planted to result in landforms that arecompatible with existing site topography and landscaping, as well as theneighborhood setting.EBMUD will coordinate with neighborhood representatives regarding theplacement of new plantings to effect screening, and this input will beincorporated into the Final Landscape Plan.The contractor shall be required to warrant landscape plantings for one yearafter project completion.Annual vegetation/tree pruning, consistent with City of Oakland FireDepartment Fire Abatement Regulations, will continue to be implemented.EBMUD will ensure that the contractor restores graded, disturbed areas to anatural-appearing landform.Site improvements will include aesthetic/architectural treatment where facilitiesare located near to, or are visible from, public trails and residences, namely:- Creating a new drainage feature with rocks and stones, around the reservoirvalve pit at the base of the excavated basin.- Improving the existing trail on EBMUD property, along Estates Drive.- Constructing a low, rustic, wooden fence along Estates Drive.- Constructing a parking area for EBMUD equipment and staff vehicles in thevalve pit.- Replacing the existing six foot high perimeter chain link fence with two inchblack webbing with an eight-foot high fence with one-inch webbing, in thesame color (black) and at the same location.Significance after Mitigation: Less than Significant.<strong>Impact</strong> 3.2-3: Effects on a scenic vista.The Project site is not within a defined scenic vista. Existing perimeter vegetation alongEstates Drive allows only filtered views into the site from adjacent residences. Mature treeson the dam downslope block distant views of the <strong>Bay</strong>. Project demolition and constructionwill occur within the bowl of the existing reservoir and will not create or open scenic vistas.Reduction of the dam embankment by 25 feet will open views to the lower site but maturetrees along the embankment slope (towards Woods Drive) will continue to block/filterdistant views of the <strong>Bay</strong>. The overall impact to scenic vistas is not considered significant.Mitigation Measure: None Required.sb09_001.doc 3-2.10 7/22/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!