13.07.2015 Views

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Estates Reservoir Replacement <strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong>Project DescriptionNote: Represents summer demand conditions.Source: EBMUD 2008Water DistributionExisting Water Treatment Plant Service AreaFigure 2-2In addition to water supply and treatment facilities, there are over 4,000 miles of potable(treated water) distribution and transmission pipes, 16 tunnels, 175 potable water reservoirs,130 pumping plants, and numerous other facilities that together provide water service toEBMUD’s customers.Estates Reservoir, shown in the vicinity/location map in Figure S-1, was originallyconstructed in 1903 and raised to its present height and lined with concrete in 1938. Thereservoir was formed by excavating a basin (i.e., open-cut) at the head of a small ravineinto the existing bedrock and constructing an earth fill dam at the west side. A roof wasinstalled in 1968 to help maintain the quality of the treated water, and in anticipation ofsb09_001.doc 2-4 7/22/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!