Estates Reservoir Replacement <strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong>SummaryENVIRONMENTALIMPACT MITIGATION MEASURES<strong>Impact</strong> 3.9-3: Construction ofthe Estates ReservoirReplacement Project couldcause vibration that coulddisturb local residents and causecosmetic damage to buildingsand structures.Measure 3.9-3: To prevent cosmetic or structural damage to adjacent or nearby structures, EBMUDwill incorporate into contract specifications restrictions on construction whereby surface vibrationwill be limited to no more than 0.5 in/sec PPV, measured at the nearest residential or other sensitivestructure. Implementation of Mitigation Measure 3.9-1c (above) will also ensure that impacts arereduced to a less than significant level.SIGNIFICANCEAFTERMITIGATIONLess than SignificantOperational <strong>Impact</strong>s<strong>Impact</strong> 3.9-4: Noise increasesduring facility operations.Mitigation Measure: None Required: Long-term operation of the replacement EstatesReservoirs and refurbished Montclair Pumping Plant will not result in noise increases, over thelevels currently experienced for the existing facilities. In fact, burying the replacement tanksand replacing old pumps and electrical equipment with new equipment is expected to reduceoperating noise levels below what is currently experienced. (There is no record of complaintsassociated with operational noise at the Estates Reservoir site). Any replacement pipelinewould be located underground and would not generate noise. Therefore, no further discussionof operational noise associated with pipelines, the replacement reservoirs or the refurbishedpumping plant is provided.CUMULATIVE IMPACTSVisual <strong>Impact</strong> C-1:Cumulative short and long-termvisual impactsNo other known projects are proposed in the immediate area or vicinity during the Estates Reservoirconstruction period. EBMUD will develop detailed scheduling and phasing guidelines to minimizeshort-term visual impacts to the surrounding area during construction of the Estates ReservoirReplacement and Montclair Pumping Plant Upgrade. In addition, the site is screened from manysurrounding vantage points by intervening topography and mature vegetation. Consequently, thelikelihood of any cumulative adverse visual impact on local viewsheds during construction is low.Less than SignificantGeology <strong>Impact</strong> C-2:Cumulative geologic andseismic hazardsBiological Resources<strong>Impact</strong> C-3: Cumulative lossof habitat for special-statuswildlife and plantsSince none of the projects shown in Table 5-1 are located within the area of potential impact, therewould be no cumulative geologic or seismic impacts.As noted in Table 5.1, the Projects listed in proximity to the Project site are infrastructureimprovement projects, located on already developed sites or in urban areas. Therefore, the proposedProject would not contribute to cumulative impacts to biological resources.Less than SignificantLess than Significantsb09_001.doc S-22 7/22/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!