13.07.2015 Views

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dingee Pressure Zone Improvement Project - Estates Reservoir Replacement ProjectWater Distribution Facilities - Initial Studyconcrete columns and timber frames. Architectural elements were incorporated into theroof that includes terraces, two large water fountains and one planter box.Montclair Pumping Plant – The 5.4 million gallons per day capacity pumping plantwas originally constructed in 1936, and upgraded in 1998 as part of EBMUD’s SeismicImprovement Program. The Plant is located about 180 feet from the Wood Drivepedestrian gate entrance and 540 feet from the vehicle entrance on Estates Drive.Dingee Reservoir - The reservoir was originally constructed in 1894 and was modifiedtwice, once for the construction of a new roof and lining (1931), and again for theconstruction a new curb which now parallels Estates Drive (1939). The dam consists offill, and cut into existing bed-rock material. No other major improvements have beenperformed since 1939.sb09_003.doc 4 12/10/08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!