13.07.2015 Views

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Estates Reservoir Replacement <strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong>Cumulative <strong>Impact</strong>s, Growth Inducement and Other Topics Required by CEQATABLE 5-1Projects with the Potential for Cumulative <strong>Impact</strong>s(Estates Reservoir Replacement – Construction Schedule, 2011-2013)Number Agency Project Name Project Description/Location1 CALTRANS Warren Freeway StormWater Mitigation2 CALTRANS Caldecott TunnelFourth BoreWarren Freeway, from Redwood Roadto Carson StreetRepair 5.0-5.5 miles of drainsAdd a fourth bore to the CaldecottTunnel on Highway 24, North side3 City of Oakland Head Royce School 4314 Lincoln AvenueMaster Plan Development.4 EBMUD 39 th Ave, PressureZone Improvements5 EBMUD Joaquin Miller PumpingPlant6 EBMUD Pinehaven PressureZone Improvements(PZI)4290 MaybelleReservoir and Pumping PlantImprovements3213 Burdeck DrivePumping Plant Improvements6039 Grizzly Peak BoulevardDecommission Reservoir and PumpingPlant7 EBMUD Redwood Reservoir 4392 Terrabella WayDecommission Reservoir8 EBMUD Round Top PumpingPlantSelby Regional parkDecommission Pumping Plant9 EBMUD Swainland Reservoir 6275 Fairlane DriveDecommission Reservoir10 EBMUD Claremont Center Golden Gate Ave at Chabot RoadAqueduct Repair11 EBMUD Gwin Pumping Plant 6 Strathmoor DriveRehabilitate Pumping Plant12 EBMUD Montclair PumpingPlant13 EBMUD Redwood PumpingPlant6317 Estates DriveRehabilitate Pumping Plant3851 39th AvenueRehabilitate Pumping PlantProjectSchedule/StatusSource2011-2013 CALTRANS -8/20082011-2013 CALTRANS -2008CompletedOaklandPlanningDepartment -10/20082011-2013 EBMUD –12/20082015 EBMUD -12/20082015-2016 EBMUD -12/20082015 EBMUD –12/20082015 EBMUD -12/20082013-2014 EBMUD -12/20082011-2014 EBMUD -12/20082014-2015 EBMUD -12/20082013-2014 EBMUD -12/20082014-2017 EBMUD -12/200814 EBMUD Dingee Pumping PlantDischarge PipelineFrom Claremont Center along GoldenGate to Broadway segment (EstatesReservoir end-point).Replace Pipeline2011-2013 EBMUD -4/2009sb09_001.doc 5-4 7/22/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!