13.07.2015 Views

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

Draft Environmental Impact Report - East Bay Municipal Utility District

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Estates Reservoir Replacement <strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong>Noise and Vibrationperceptible and could temporarily annoy the closest residential receptors during Projectconstruction.Measure 3.9-3: To prevent cosmetic or structural damage to adjacent or nearbystructures, EBMUD will incorporate into contract specifications restrictions onconstruction whereby surface vibration will be limited to no more than 0.5 in/secPPV, measured at the nearest residential or other sensitive structure.Significance after Mitigation: Less than Significant.Operational <strong>Impact</strong>s<strong>Impact</strong> 3.9-4: Noise increases during facility operations.Long-term operation of the Replacement Estates Reservoirs and refurbished MontclairPumping Plant will not result in noise increases, over the levels currently experienced forthe existing facilities. In fact, burying the replacement tanks and replacing old pumpsand electrical equipment with new equipment is expected to reduce operating noise levelsbelow what is currently experienced. There is no record of complaints associated withoperational noise at the Estates Reservoir site. Replacement pipeline would be locatedunderground and would not generate noise. Therefore, no further discussion ofoperational noise associated with pipelines, the replacement reservoirs or the refurbishedpumping plant is provided.Mitigation Measure: None Required.ReferencesCity of Oakland Noise Ordinance, Oakland Planning Code sections 17.120.050, and8.18, 1996.U.S. <strong>Environmental</strong> Protection Agency, Information on Levels of <strong>Environmental</strong> NoiseRequisite to Protect Public Health and Welfare with an Adequate Margin of Safety((Condensed Version), Washington D.C. (EPA/ONOC 550/9-74-004), 1974.Illingworth & Rodkin, Inc. 2007 (updated 2009).Wilson, Ihrig & Associates, Based on Measurement Data and Field Observations FromVarious Locations in California, EBMUD Claremont Corridor SeismicImprovements Project: Construction Vibration <strong>Impact</strong> Analysis, <strong>Draft</strong> Technical<strong>Report</strong>, 2003, as cited in the EBMUD Water Treatment and TransmissionImprovement Program <strong>Draft</strong> EIR, June 2006.<strong>Environmental</strong> Sciences Associates, San Francisco Recycle Water Master Plan andGroundwater Master Plan, Final EIR, August 1997, as cited in the EBMUD WaterTreatment and Transmission Improvement Program <strong>Draft</strong> EIR, June 2006.sb09_001.doc 3-9.20 7/22/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!