Dasque-Middle Facilities Study Report - BC Hydro - Transmission

Dasque-Middle Facilities Study Report - BC Hydro - Transmission Dasque-Middle Facilities Study Report - BC Hydro - Transmission

transmission.bchydro.com
from transmission.bchydro.com More from this publisher

<strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> ProjectInterconnection <strong>Facilities</strong> <strong>Study</strong> Project Plan<strong>Report</strong> No. TGI‐2010‐A185‐FS‐R2PROJECT INFORMATIONInterconnection Customer (IC)Project NamePoint of Interconnection (POI)XXXXX<strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> Project66 kV bus of the Skeena (SKA) substation<strong>BC</strong>H Proposed ISD 1 October 2012IC Proposed COD 1 December 2012Maximum Power Injection (MW) 19.7Number of Generator Units 3Plant Fuel<strong>Hydro</strong>EXECUTIVE SUMMARYXXXXX, the Interconnection Customer (IC), proposes to develop the <strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> Project todeliver electric energy to <strong>BC</strong> <strong>Hydro</strong> (<strong>BC</strong>H) through the 2008 Clean Power Call (CPC). The <strong>Middle</strong> Creekgenerating station of the <strong>Dasque</strong>‐<strong>Middle</strong> Project will be connected to the 66 kV bus of the SKAsubstation via a 19 km customer‐owned 66 kV transmission line. The <strong>Dasque</strong> Creek generating stationswill have no direct link to the system, but will be connected to the <strong>Middle</strong> Creek generating station via a2.5 km customer‐owned 66 kV transmission line. The proposed maximum power to be injected into the<strong>BC</strong>H system from the proposed generating stations is 19.7 MW.oo<strong>Middle</strong> Creek generating station consists of one 8 MW unit approximately 19 km from SKA.<strong>Dasque</strong> Creek generating station consists of two identical units of 6 MW approximately 21.5 kmfrom SKA.This report identifies the required system modifications for interconnecting the proposed <strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> Project. These modifications are as follows:Construct 69 kV line position at SKA including circuit breaker, disconnects, surge arrestor, wavetrap and CVTProtection relay panel with SEL relaysTelecommunication requirement is limited to a power line carrier from the customer. It isassumed that the SKA RTU has enough points for all analog and digital signals this projectrequires.© British Columbia <strong>Hydro</strong> and Power Authority, 2011. All rights reserved. iii


<strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> ProjectInterconnection <strong>Facilities</strong> <strong>Study</strong> Project Plan<strong>Report</strong> No. TGI‐2010‐A185‐FS‐R2TABLE OF CONTENTSDISCLAIMER OF WARRANTY, LIMITATION OF LIABILITYCOPYRIGHT NOTICEEXECUTIVE SUMMARYiiiiiiPROJECT INTERCONNECTION REQUIREMENTS Section 1PROJECT PLAN Section 2© British Columbia <strong>Hydro</strong> and Power Authority, 2011. All rights reserved. v


<strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> ProjectInterconnection <strong>Facilities</strong> <strong>Study</strong> Project Plan<strong>Report</strong> No. TGI‐2010‐A185‐FS‐R2SECTION 1STANDARD GENERATOR INTERCONNECTION AGREEMENT (SGIA)SCHEDULE A – PROJECT INTERCONNECTION REQUIREMENTS (PIR)(REDACTED)© British Columbia <strong>Hydro</strong> and Power Authority, 2011. All rights reserved.


<strong>Dasque</strong>‐<strong>Middle</strong> <strong>Hydro</strong> ProjectInterconnection <strong>Facilities</strong> <strong>Study</strong> Project Plan<strong>Report</strong> No. TGI‐2010‐A185‐FS‐R2SECTION 2INTERCONNECTION FACILITIES STUDYPROJECT PLAN(REDACTED)© British Columbia <strong>Hydro</strong> and Power Authority, 2011. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!