13.07.2015 Views

Electrical Installation Guide 2009 - the global specialist in energy ...

Electrical Installation Guide 2009 - the global specialist in energy ...

Electrical Installation Guide 2009 - the global specialist in energy ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P - Residential and o<strong>the</strong>r special locations2 Bathrooms and showersBathrooms and showers rooms are areas of high risk, because of <strong>the</strong> very lowresistance of <strong>the</strong> human body when wet or immersed <strong>in</strong> water.Precaution to be taken are <strong>the</strong>refore correspond<strong>in</strong>gly rigorous, and <strong>the</strong> regulationsare more severe than those for most o<strong>the</strong>r locations.The relevant standard is IEC 60364-7-701.Precautions to observe are based on three aspects:b The def<strong>in</strong>ition of zones, numbered 0,1, 2, 3 <strong>in</strong> which <strong>the</strong> placement (or exclusion)of any electrical device is strictly limited or forbidden and, where permitted, <strong>the</strong>electrical and mechanical protection is prescribedb The establishment of an equipotential bond between all exposed and extraneousmetal parts <strong>in</strong> <strong>the</strong> zones concernedb The strict adherence to <strong>the</strong> requirements prescribed for each particular zones, astabled <strong>in</strong> clause 32.1 Classification of zonesSub-clause 701.32 of IEC 60364-7-701 def<strong>in</strong>es <strong>the</strong> zones 0, 1, 2, 3 as shown <strong>in</strong> <strong>the</strong>follow<strong>in</strong>g diagrams (see Fig. P12 below to Fig P18 opposite and next pages):Zone 1*Zone 0Zone 2 Zone 3Zone 1*Zone 0Zone 2 Zone 30.60 m 2.40 m0.60 m2.40 mZone 1Zone 2Zone 3Zone 12.25 mZone 0P0.60 m2.40 m(*) Zone 1 is above <strong>the</strong> bath as shown <strong>in</strong> <strong>the</strong> vertical cross-sectionFig. P12 : Zones 0, 1, 2 and 3 <strong>in</strong> proximity to a bath-tub© Schneider Electric - all rights reservedSchneider Electric - <strong>Electrical</strong> <strong>in</strong>stallation guide <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!