13.07.2015 Views

Electrical Installation Guide 2009 - the global specialist in energy ...

Electrical Installation Guide 2009 - the global specialist in energy ...

Electrical Installation Guide 2009 - the global specialist in energy ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B - Connection to <strong>the</strong> MV publicdistribution network2 Procedure for <strong>the</strong> establishmentof a new substationThe utility must give specific <strong>in</strong>formation to <strong>the</strong>prospective consumer.2.2 Project studiesFrom <strong>the</strong> <strong>in</strong>formation provided by <strong>the</strong> consumer, <strong>the</strong> power-supplier must <strong>in</strong>dicate:The type of power supply proposed, and def<strong>in</strong>e:b The k<strong>in</strong>d of power-supply system: overheadl<strong>in</strong>e or underground-cable networkb Service connection details: s<strong>in</strong>gle-l<strong>in</strong>e service, r<strong>in</strong>g-ma<strong>in</strong> <strong>in</strong>stallation, or parallelfeeders, etc.b Power (kVA) limit and fault current levelThe nom<strong>in</strong>al voltage and rated voltage (Highest voltage for equipment)Exist<strong>in</strong>g or future, depend<strong>in</strong>g on <strong>the</strong> development of <strong>the</strong> system.Meter<strong>in</strong>g details which def<strong>in</strong>e:b The cost of connection to <strong>the</strong> power networkb Tariff details (consumption and stand<strong>in</strong>g charges)B15The utility must give official approval of <strong>the</strong>equipment to be <strong>in</strong>stalled <strong>in</strong> <strong>the</strong> substation,and of proposed methods of <strong>in</strong>stallation.2.3 ImplementationBefore any <strong>in</strong>stallation work is started, <strong>the</strong> official agreement of <strong>the</strong> power-suppliermust be obta<strong>in</strong>ed. The request for approval must <strong>in</strong>clude <strong>the</strong> follow<strong>in</strong>g <strong>in</strong>formation,largely based on <strong>the</strong> prelim<strong>in</strong>ary exchanges noted above:b Location of <strong>the</strong> proposed substationb S<strong>in</strong>gle-l<strong>in</strong>e diagram of power circuits and connections, toge<strong>the</strong>r with earth<strong>in</strong>gcircuitproposalsb Full details of electrical equipment to be <strong>in</strong>stalled, <strong>in</strong>clud<strong>in</strong>g performancecharacteristicsb Layout of equipment and provision for meter<strong>in</strong>g componentsb Arrangements for power-factor improvement if requiredb Arrangements provided for emergency standby power plant (MV or LV) if eventuallyrequiredAfter test<strong>in</strong>g and check<strong>in</strong>g of <strong>the</strong> <strong>in</strong>stallation byan <strong>in</strong>dependent test authority, a certificate isgranted which permits <strong>the</strong> substation to be put<strong>in</strong>to service.2.4 Commission<strong>in</strong>gWhen required by <strong>the</strong> authority, commission<strong>in</strong>g tests must be successfully completedbefore authority is given to energize <strong>the</strong> <strong>in</strong>stallation from <strong>the</strong> power supply system.Even if no test is required by <strong>the</strong> authority it is better to do <strong>the</strong> follow<strong>in</strong>g verification tests:b Measurement of earth-electrode resistancesb Cont<strong>in</strong>uity of all equipotential earth-and safety bond<strong>in</strong>g conductorsb Inspection and functional test<strong>in</strong>g of all MV componentsb Insulation checks of MV equipmentb Dielectric strength test of transformer oil (and switchgear oil if appropriate), ifapplicableb Inspection and test<strong>in</strong>g of <strong>the</strong> LV <strong>in</strong>stallation <strong>in</strong> <strong>the</strong> substationb Checks on all <strong>in</strong>terlocks (mechanical key and electrical) and on all automaticsequencesb Checks on correct protective-relay operation and sett<strong>in</strong>gsIt is also imperative to check that all equipment is provided, such that any properlyexecuted operation can be carried out <strong>in</strong> complete safety. On receipt of <strong>the</strong> certificateof conformity (if required):b Personnel of <strong>the</strong> power-supply authority will energize <strong>the</strong> MV equipment and checkfor correct operation of <strong>the</strong> meter<strong>in</strong>gb The <strong>in</strong>stallation contractor is responsible for test<strong>in</strong>g and connection of <strong>the</strong>LV <strong>in</strong>stallationWhen f<strong>in</strong>ally <strong>the</strong> substation is operational:b The substation and all equipment belongs to <strong>the</strong> consumerb The power-supply authority has operational control over all MV switchgear <strong>in</strong> <strong>the</strong>substation, e.g. <strong>the</strong> two <strong>in</strong>com<strong>in</strong>g load-break switches and <strong>the</strong> transformer MV switch(or CB) <strong>in</strong> <strong>the</strong> case of a R<strong>in</strong>gMa<strong>in</strong>Unit, toge<strong>the</strong>r with all associated MV earth<strong>in</strong>g switchesb The power-supply personnel has unrestricted access to <strong>the</strong> MV equipmentb The consumer has <strong>in</strong>dependent control of <strong>the</strong> MV switch (or CB) of <strong>the</strong> transformer(s)only, <strong>the</strong> consumer is responsible for <strong>the</strong> ma<strong>in</strong>tenance of all substation equipment,and must request <strong>the</strong> power-supply authority to isolate and earth <strong>the</strong> switchgear toallow ma<strong>in</strong>tenance work to proceed. The power supplier must issue a signed permitto-workto <strong>the</strong> consumers ma<strong>in</strong>tenance personnel, toge<strong>the</strong>r with keys of locked-offisolators, etc. at which <strong>the</strong> isolation has been carried out.© Schneider Electric - all rights reservedSchneider Electric - <strong>Electrical</strong> <strong>in</strong>stallation guide <strong>2009</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!