13.07.2015 Views

CSVB Series II - Columbia Heating

CSVB Series II - Columbia Heating

CSVB Series II - Columbia Heating

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION PROCEDURE!WARNINGImproper installation, adjustment, alteration, serviceor maintenance could result in death or seriousinjury.1. Installation must conform to requirements of authorityhaving jurisdiction or, in absence of such requirements,to the National Fuel Gas Code, ANSI Z223.1/NFPA 54.2. Where required by authority having jurisdiction,installation must conform to the Standard for Controlsand Safety Devices for Automatically fired Boilers,ANSI/ASME CSD-1.3. Boiler series is classified as Category I. Ventinstallation shall be in accordance with "Venting ofEquipment ," of the National Fuel Gas Code, ANSIZ223.1/NFPA 54, or applicable provisions of localbuilding codes.4. Boiler has met safe lighting and other performancecriteria with gas manifold and control assembly onboiler per latest revision of ANSI Z21.13/CGA 4.9.5. Install such that gas ignition system components areprotected from water (dripping, spraying, rain, etc.)during appliance operation and service, (circulatorreplacement, condensate trap, control replacement,etc.).6. Locate boiler on level, solid base as near chimney aspossible and centrally located with respect to heatdistribution system as practical.7. Verify you have the right size boiler before startinginstallation. See rating and capacity table.8. When installed in utility room, door should be wideenough to allow largest boiler part to enter, or topermit replacement of another appliance such as waterheater.9. Boiler installed in building under construction, takecare to insure clean combustion air supply duringconstruction process. Airborne particulates such asfrom drywall dust and from fiberglass insulation canclog burner ports and cause incomplete combustion andsooting.! WARNINGFire hazard. Do not install boiler on combustibleflooring or carpeting. Failure to follow theseinstructions could result in death or serious injury.10. FOR INSTALLATION ON NON-COMBUSTIBLEFLOORS ONLY - For installation on combustibleflooring special base must be used. (See ReplacementParts Section.) Do Not Install Boiler on carpeting.11. Verify boiler is supplied with correct type of gas, freshair for combustion, and suitable electrical supply.NOTICEFollow local regulations with respect to installationof CO detectors.Figure 1 - Minimum Clearances To CombustibleConstructionTable 1 - BOILER MINIMUM CLEARANCE TOCOMBUSTIBLESUnitTopRear8”Opposite SideControl SideOpposite SideFront (Alcove)Flue/Vent ConnectorNear Boiler Piping6”Rear6” 8”BoilerFront18”Control SideMinimumClearances6” (152mm)6” (152mm)8” (203mm)6” (152mm)18” (457mm)6” (152mm)1” (24mm)Set unit on concrete or other noncombustible materialbase or floor. DO NOT INSTALL ON CARPETING.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!