13.07.2015 Views

Manly Lagoon Dredging Project - Manly Council - NSW Government

Manly Lagoon Dredging Project - Manly Council - NSW Government

Manly Lagoon Dredging Project - Manly Council - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Manly</strong> <strong>Lagoon</strong> <strong>Dredging</strong> <strong>Project</strong> – Review of Environmental FactorsPrepared for <strong>Manly</strong> and Warringah <strong>Council</strong>s6.2 Environmental Management PlansThe following plans would need to be devised and implemented by the contractor during theproposed works as part of the Construction Environmental Management Plan (CEMP):Acid Sulfate Soils Management Plan (ASSMP; Appendix E);Community Consultation Plan;Construction Traffic Management Plan;Dust Management Plan;Erosion and Sediment Control Plan (ESCP);Flora and Fauna Management Plan;Hazards Management Plan;Incident Management Plan (in particular focusing on foreseeable events which maynecessitate suspending or stopping dredging);Noise and Vibration Management Plan;Odour Management Plan;Utilities Management Plan;Waste Management Plan; andWater Management Plan.The CEMP and all management plans must be approved by <strong>Manly</strong> and Warringah <strong>Council</strong>sprior to the commencement of any dredging activity.The above management plans and the overall CEMP should be prepared by the contractorto the standard prescribed in the RTA Guide NG36, which details standards for constructionenvironmental protection and management in contracts (available athttp://www.rta.nsw.gov.au/cgi-bin/doingbusinesswithus/specifications/index.cgi?ng36_e3_r1.pdf). It should be noted that the RTA Guide NG36 is for road related projects; however thedredging contractor can still use the information as a guide to the standard that is required.6.3 Contractor ControlIf correctly implemented the mitigation measures outlined in this document and summarisedin Section 6.1 will prevent the occurrence of any significant or harmful environmentalimpacts during the proposed dredging of <strong>Manly</strong> <strong>Lagoon</strong> (based on the information availablein the preparation of this document).A specialist dredging contractor will be contracted by <strong>Manly</strong> <strong>Council</strong> to undertake the workson behalf of the proponents. It is recognised that <strong>Manly</strong> <strong>Council</strong> have a duty to ensure thatthe selected contractor complies in full with all the requirements of this REF and associateddocumentation.Effective control of the contractor will be achieved through a combination of the followingactions:Contractual requirements, which will include meeting in full the requirements of theREF, ASSMP, all relevant legislation and other applicable requirements;2 July 2010 Cardno (<strong>NSW</strong>/ACT) Pty Ltd 122H:\Doc\2010\Reports.2010\Rep2580v4.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!