13.07.2015 Views

Manly Lagoon Dredging Project - Manly Council - NSW Government

Manly Lagoon Dredging Project - Manly Council - NSW Government

Manly Lagoon Dredging Project - Manly Council - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Manly</strong> <strong>Lagoon</strong> <strong>Dredging</strong> <strong>Project</strong> – Review of Environmental FactorsPrepared for <strong>Manly</strong> and Warringah <strong>Council</strong>s5.8 Utilities and ServicesExisting EnvironmentA utility services search was undertaken through the ‘Dial Before You Dig’ service by Cardnoon 8 July 2009. Plans were provided to indicate the locations of the following servicesproximal to the works site:Sydney Water pipes;Energy Australia cables;Jemena Gas pipes; andTelstra cables.The ‘Dial Before You Dig’ plans will be provided to the contractor. The contractor will berequired to consider and accurately locate the utilities present when finalising dredgingplans.Correspondence with MHL also indicated the presence of a water level gauge, in the form ofa pressure transducer owned and operated by MHL within the lagoon (shown on the LayoutPlan in Appendix J).Impact AssessmentCare should be taken during dredging operations to avoid identified utilities, such as highpressure gas mains and the MHL pressure transducer, which are known to occur in theworks area (see photos in Appendix A). Appendix J shows the location of the pressuretransducer, and ‘Dial Before you Dig Plans’ are available to show the location of otherutilities.If the dredging profile avoids these utilities, then it is not anticipated that activities will affectany utilities or utility supply during or after completion of the works.Mitigation MeasuresA Utilities Management Plan which includes the accurate location of all utilities presentshould be prepared by the contractor for incorporation into the CEMP. All contractors andcontracted staff should observe this Management Plan to avoid damage or disruption to anyutilities during works.Prior to the commencement of any works, the contractor must investigate the nature andlocation of all services that might be encountered during the construction of the work andconsult with the relevant authorities with respect to these matters.2 July 2010 Cardno (<strong>NSW</strong>/ACT) Pty Ltd 108H:\Doc\2010\Reports.2010\Rep2580v4.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!