13.07.2015 Views

Contents

Contents

Contents

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sewage DisposalPlanning GuideWastewater lifting plant (sewage without faeces)double pumps - Wilo-Drain TwisterWilo-Drain Twister double-pumpdrainage station1 Submersible pump (2x)2 Pressure line DN 32 withY-piece3 Check valve body4 Backflow loop5 Backflow level6 Sewer7 Switchgear8 Float switch for leveland alarm monitoringSubmersible pumpsBackflow loop installationIf possible, the backflow loop should beinstalled directly above the lifting plant. Thesewage pipe leading off the loop should beinstalled at a gradient to the mains sewerconnection.Wastewater and sewage lifting plant (sewage including faeces) –Wilo-DrainLift XXL double pump unitVentilationInlet11152 3913 4Drain pump1087612Backflow level(usually roadtops)1 Gate valve DN 100 or DN 1502 Single ended flanged nipple withhose and hose clips DN 100 orDN 1503 Flexible hose connector forvent line4 Tank connection kit withpump, 2 gate valves andvent flange with hose5 Hand diaphragm pump 1 1 /2"6 Check valve body DN 80 orDN 1007 Gate valve DN 80 or DN 1008 Single ended flanged nipple with hoseand hose clips DN 80 or DN 1009 3-way stopcock10 Y-pipe DN 80 or DN 10011 Microprocessor-controlledswitchgear12 KAS, mini alarm switchgear withsignal bell13 Flexible hose connector forHand-held diaphragm pumpsAs of: 06/2004 - Subject to change without prior notice11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!