12.07.2015 Views

Operating Instructions 150 000 019 00 EN

Operating Instructions 150 000 019 00 EN

Operating Instructions 150 000 019 00 EN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PTO shaftAfter the rotary tedder has been coupledto the upper and lower link arm, turn offthe engine. Remove the ignition key.Protect the tractor from rolling!Push the PTO shaft onto the PTO shaft end of thetractor. Make sure that the locking device clicks intoplace. Fix the protective sleeve (1) with chains (2) toprevent it from rotating with the shaft.Check the PTO shaft for correct lengththe first time the rotary tedder is usedand every time a different tractor is used.If the length of the PTO shaft is notcorrect for the tractor, it is essential totake note of section 2.4 "Adjusting thePTO shaft length".21412KW-0-<strong>00</strong>9Hydraulics3Make sure that the hydraulic system isdepressureized in the tractor and in therotary tedder attachment.KW 5.50/4x7; KW 6.70/6 and KW 7.70/6x7Take the hydraulic switchover valve (1) out of thebracket (4) and insert it into the holder on the tractor.Take the hydraulic hose (2) out of the bracket (3) andinsert it into the coupling of a single action control valve.2KW-0-010KW 8.80/8Insert the hydraulic hoseinto the coupling of a doubleaction control valve.Transport locking deviceKW 5.50/4x7; KW 6.70/6 and KW 7.70/6x7The rotary tedder is equipped with a mechanical lockingdevice.Fix the control cable to the tractor. Make sure that thecable does not come into contact with the tractorwheels.Make sure that the transport lockingdevice is always correctly engagedwhen the machine is in transportposition.1KW-0-05113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!