Naperville city council presentation - City of Naperville
Naperville city council presentation - City of Naperville
Naperville city council presentation - City of Naperville
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SMART GRID INITIATIVE COMPONENTSDistribution and Substation AutomationProject Elements Distribution Automation (DA) Allows monitoring critical feeders to reduce outage durations and helps alleviate overload conditions Need to begin with the distribution planning guidelines and use local <strong>Naperville</strong> engineering staff tocoordinate schemes Substation Automation (SA) – complete all 16 substations Enables data acquisition from the power grid in a decentralized structure Will work with the local <strong>Naperville</strong> substation engineering staff on strategy and deployment Volt/VAR and Phase Balancing – create an RFP, install s<strong>of</strong>tware and remote sensors, andacquire and install capacitors• Provides for a flat 120-volt distribution feeder pr<strong>of</strong>ile and placement/control <strong>of</strong> capacitors at theappropriate locations along the feeders for voltage support and to supply VARs as neededTimelineElement / Task Deliverable Start FinishPlan-Analyze Completed Requirements Oct 2010 Jan 2011Design-Build Design DA Circuits Jan 2011 Apr 2011Test-Train-Deploy Testing process plan Apr 2010 Jun 201141