12.07.2015 Views

National Mineral Policy 2006 - Department of Mines

National Mineral Policy 2006 - Department of Mines

National Mineral Policy 2006 - Department of Mines

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

an ore body to the applicant which it adjudges to be the most deserving in terms <strong>of</strong> thecriteria (a) to (d) <strong>of</strong> Section 11(3) <strong>of</strong> the Act. In such cases, the full cost <strong>of</strong> explorationby the public agency should be recovered from the lessee. [1.47]Duration <strong>of</strong> Concessions• While the total period <strong>of</strong> exploration under RP/PL or RP/LAPL may remain the same,i.e. a maximum <strong>of</strong> eight years, an RP holder who completes reconnaissance in lessthan three years and applies for and obtains a PL may be allowed to use the savedperiod in the latter concession as an additionality, so that even while the combinedduration under RP/PL remains eight years the maximum period <strong>of</strong> the PL couldstretch beyond five years for an RP holder who completes reconnaissance and obtainsa PL before his three-year RP period runs out. This kind <strong>of</strong> flexibility would not onlyaddress the need for the longer time sought for the PL but would also encourage fasteroverall exploration. The duration <strong>of</strong> the exclusive LAPL would be six years,extendable by another two years but with suitable and matching relinquishments.Since the total duration is not to exceed eight years, the duration <strong>of</strong> a LAPL appliedfor by a non-exclusive RP holder would be six years extendable by another two yearsbut the total period <strong>of</strong> eight years would be reduced by the used-up period <strong>of</strong> thethree-year RP. As far as extensions are concerned, non-exclusive RPs may beroutinely extended for the next three years in respect <strong>of</strong> areas not claimed by aLAPL/PL applicant. LAPLs may be extended beyond the two years mentioned abovebut such extension shall only be in exceptional circumstances, e.g. where an ongoingproject warrants additional work for sound technical reasons, etc. [1.50]Size <strong>of</strong> Area• The limit for a direct PL applicant should be increased from 25 sq. km to 50 sq. km.[1.57]• The maximum total area under PL in a state may be increased from the present 25 sq.km to 500 sq. km in the case <strong>of</strong> an RP holder. This would be subject to an escalatingfee structure, minimum expenditure commitment, and relinquishment <strong>of</strong> area so thatthe area held is brought down to 100 sq. km. at the end <strong>of</strong> three years. Where no aerial191

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!