OPTIONSFIXED RAMP INSTALLATION, 6”Lower the platform to level ground. Line up top edge of ramp with thefront edge of the platform.Weld 1/8” beads two inches long about every 6 or 8 inches along theentire length of the platform. Repeat procedure for the underside of theplatform.WELD11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713WELD36
FIXED RAMP INSTALLATION, 12”Lower the platform to level ground. Line up top edge of ramp with thefront edge of the platform.WELDACut rear edges of ramp as shown:Single piece platform “A” = 3/8”Folding platforms “A” = 1/2”11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713WELDWeld 1/8” beads two inches long about every 6 or 8 inches along theentire length of the platform. Repeat procedure for the underside of theplatform. Weld gussets full length.37
- Page 1 and 2: M-90-1REV. HOCTOBER 2012INSTALLATIO
- Page 3 and 4: Comply with the following WARNINGS
- Page 5 and 6: UNIT AS SHIPPEDDo not remove stands
- Page 7 and 8: INSTALLATION OF UNIT - ContinuedCor
- Page 9 and 10: INSTALLATION OF UNIT - ContinuedTyp
- Page 11 and 12: WELDING TO FLATBEDThe column assemb
- Page 13 and 14: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 15 and 16: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 17 and 18: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 19 and 20: POWER PACK INSTALLATIONTRUCK BODIES
- Page 21 and 22: POWER PACK INSTALLATION - Continued
- Page 23 and 24: PUMP WIRING CAM CLOSERTOGGLESWITCH1
- Page 25 and 26: ADD HYDRAULIC FLUIDCAUTIONKeep dirt
- Page 27 and 28: FINAL ADJUSTMENTSFill the system wi
- Page 29 and 30: ATTACH DECALSNOTE: Ensure there is
- Page 31 and 32: OPTIONSRCT LIGHT INSTALLATIONALL RC
- Page 33 and 34: OPTIONSHAND PUMP OPTION FOR CAM CLO
- Page 35: RECOMMENDED LIFTGATE POWER CONFIGUR
- Page 39 and 40: HINGED RAMP INSTALLATION (STEEL)7/8
OPTIONSFIXED RAMP <strong>INSTALLATION</strong>, 6”Lower the platform to level ground. Line up top edge of ramp with thefront edge of the platform.Weld 1/8” beads two inches long about every 6 or 8 inches along theentire length of the platform. Repeat procedure for the underside of theplatform.WELD11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713WELD36