FINAL ADJUSTMENTS - ContinuedAdjust flow control valve (FIG. 28-1) on power pack so platform does not open too slowly ortoo quickly from stowed position.• Platform will make a banging noise if it opens too quickly.• In 55ºF to 95ºF temperature range and with platform observed to belowering at normal speed, platform opening time should be in range of 4to 6 seconds.• If temperatures are below 55ºF and valve setting is the same, it may takelonger for platform to open.FLOW CONTROLVALVEOPENSLOWERADJUSTABLE FLOW CONTROL VALVE(POWER PACK FOR CAM CLOSER RC IS SHOWN)FIG. 28-1OPENFASTERTo ensure that the platform brakes are working properly, perform the following simple test:1. Open Platform and let unit down so that the bottom of the Runner on one side rests on afl oor jack.2. Raise the jack about 3” or so and let the jack down.3. The Runner should stay in the jacked-up position. If it falls down to its original positionresting on the jack, then the brake is not working and must be checked.4. To release engaged brake, raise unit.11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713Perform test on opposite side as well.If platform raises unevenly from side to side, adjust per instructions in maintenance manual.Install lights and add decals.28
ATTACH DECALSNOTE: Ensure there is no residue, dirt, or corrosion where decals are attached.If necessary, clean surface before attaching decals.PAINT DECAL(2 PLACES)P/N 267338-01SERIAL PLATE(REF)STOW WARNING DECALP/N 282847-01DECAL “F” ORDECAL “G”DECAL “C”11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713DECAL “D”DECAL “B”DECAL “E”DECAL “A”DECAL “H”DECAL “I”29
- Page 1 and 2: M-90-1REV. HOCTOBER 2012INSTALLATIO
- Page 3 and 4: Comply with the following WARNINGS
- Page 5 and 6: UNIT AS SHIPPEDDo not remove stands
- Page 7 and 8: INSTALLATION OF UNIT - ContinuedCor
- Page 9 and 10: INSTALLATION OF UNIT - ContinuedTyp
- Page 11 and 12: WELDING TO FLATBEDThe column assemb
- Page 13 and 14: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 15 and 16: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 17 and 18: ATTACH OPTIONAL BATTERY BOX & FRAME
- Page 19 and 20: POWER PACK INSTALLATIONTRUCK BODIES
- Page 21 and 22: POWER PACK INSTALLATION - Continued
- Page 23 and 24: PUMP WIRING CAM CLOSERTOGGLESWITCH1
- Page 25 and 26: ADD HYDRAULIC FLUIDCAUTIONKeep dirt
- Page 27: FINAL ADJUSTMENTSFill the system wi
- Page 31 and 32: OPTIONSRCT LIGHT INSTALLATIONALL RC
- Page 33 and 34: OPTIONSHAND PUMP OPTION FOR CAM CLO
- Page 35 and 36: RECOMMENDED LIFTGATE POWER CONFIGUR
- Page 37 and 38: FIXED RAMP INSTALLATION, 12”Lower
- Page 39 and 40: HINGED RAMP INSTALLATION (STEEL)7/8
ATTACH DECALSNOTE: Ensure there is no residue, dirt, or corrosion where decals are attached.If necessary, clean surface before attaching decals.PAINT DECAL(2 PLACES)P/N 267338-01SERIAL PLATE(REF)STOW WARNING DECALP/N 282847-01DECAL “F” ORDECAL “G”DECAL “C”11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713DECAL “D”DECAL “B”DECAL “E”DECAL “A”DECAL “H”DECAL “I”29