12.07.2015 Views

INSTALLATION MANUAL RC-2B RC-3B RC-4B RC-5B RC ... - Maxon

INSTALLATION MANUAL RC-2B RC-3B RC-4B RC-5B RC ... - Maxon

INSTALLATION MANUAL RC-2B RC-3B RC-4B RC-5B RC ... - Maxon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FINAL ADJUSTMENTS - ContinuedAdjust flow control valve (FIG. 28-1) on power pack so platform does not open too slowly ortoo quickly from stowed position.• Platform will make a banging noise if it opens too quickly.• In 55ºF to 95ºF temperature range and with platform observed to belowering at normal speed, platform opening time should be in range of 4to 6 seconds.• If temperatures are below 55ºF and valve setting is the same, it may takelonger for platform to open.FLOW CONTROLVALVEOPENSLOWERADJUSTABLE FLOW CONTROL VALVE(POWER PACK FOR CAM CLOSER <strong>RC</strong> IS SHOWN)FIG. 28-1OPENFASTERTo ensure that the platform brakes are working properly, perform the following simple test:1. Open Platform and let unit down so that the bottom of the Runner on one side rests on afl oor jack.2. Raise the jack about 3” or so and let the jack down.3. The Runner should stay in the jacked-up position. If it falls down to its original positionresting on the jack, then the brake is not working and must be checked.4. To release engaged brake, raise unit.11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713Perform test on opposite side as well.If platform raises unevenly from side to side, adjust per instructions in maintenance manual.Install lights and add decals.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!